Project

General

Profile

Trackersoftwarereview-mtg7 » History » Version 6

Dobbs, Adam, 08 September 2017 12:24

1 1 Rajaram, Durga
h1. Tracker Software Review: Meeting 7
2
3 3 Rajaram, Durga
h2. September 8, 2017: 1400 BST
4 1 Rajaram, Durga
5
h2. Agenda
6
7
# *Introduction* - K. Long
8
# *Actions from previous meetings*
9
* *PR*:
10
### AD: Optimize Chi2 cut for “MINUIT” variant
11
### AD, CH: Check and implement MCS errors
12
### AD: Plot chisq per dof for 'perfect' events
13
### Define multi-track requirements
14
### -AD: Compare data/MC efficiencies for 8681- _Done_
15
### -AD: Show distributions with sign per station per tracker- _Done_
16 6 Dobbs, Adam
### -AD: Show individual residual distributions to understand details - is the station 1 distribution a binning artifact or a constraint from the fit?- _Done_
17 5 Dobbs, Adam
18 1 Rajaram, Durga
* *Track fit*:
19
### Repeat study that was done to investigate whether field integration (e.g. using Runge Kutta) is required to compensate for magnetic field non-uniformity
20
### Make study of magnetic-field alignment with a view to establishing whether the present algorithm is sufficiently insensitive to reasonable assumptions of maximum field-misalignment
21
### Study p-value: split up contributions to p-value shape using MC and study shape in data, e.g. is there an error in the resolution per plane, handling of MCS, handing of energy loss, b field..
22
* *Tracker, MC*:
23
## MU/EO: Understand reasons for shape of hits-per-station histogram - low-level
24
## PK: Check dead channel & noise handling in MC. 
25
## Tracker group: Summarize, show what has been studied so far for systematics (alignment, scattering, energy loss, field uniformity, etc).
26
27
28
# *Report on actions: Pattern recognition*: A. Dobbs
29
# *Report on actions: Track fit*: C. Hunt
30
# *Next Steps for review*
31
# *AoB*
32
33
---
34
35
h2. Dial-in information
36
37
http://mice.iit.edu/phonebridge.html
38
39
---
40
41
h2. Attendance: KL, CR, PK, AD, CH, MU, DR
42
43
h2. Notes from Meeting 5: Aug 16, 2017:
44
45
* AD: Compare data/MC efficiencies for 8681
46
** done. 8681, 2.8.5 MC reprocessed with 2.9.1-PatRec,Kalman  -- results consistent with 2.9.1 reco
47
** Illustrative plots added 
48
49
* AD: Optimize Chi2 cut for “MINUIT” variant
50
** pushing cuts lower gives higher efficiencies, though purity may be an issue. Noted that critical parameter is efficiency
51
** Q: how loose should the LSQ cuts be? AD points to loosest cut in table from previous meeting.
52
53
* AD: Show residual distributions with sign per station per tracker
54
** sent to email list, added to meeting wiki
55
56
* AD: Plot chisq per dof for 'perfect’ events
57 2 Rajaram, Durga
** stands
58 1 Rajaram, Durga
59
* Define multi-track requirements
60 2 Rajaram, Durga
** stands. Need discussion and inputs on how to define 
61 1 Rajaram, Durga
62
* Adding errors:
63
** for circle fit: suggestion is to define a mean error and apply to every station rather than station-by-station errors.
64
** Q: how to define mean error? based on the geometric mean of the errors?
65
** Q: does taking the chi^2/mean_error^2 bias the pr fit?
66
** errors on the resulting circle fit parameters will feed into the longitudinal fit
67
68
* Discussion about aperture cut
69 2 Rajaram, Durga
** CR notes that aperture cut should be standardized by tracker group. AD notes that the cut in PR is loose -- 150.
70 1 Rajaram, Durga
** PK suggests a flag to indicate if track passed or failed an aperture cut
71
** All agree that fiducial cut should be standardized, 
72
** Q: does the current aperture cut throw out any potential tracks? If it does, cut should be loosened, but consensus seems to be that tracking should not do any "analysis-style" cuts but rather optimize track-finding. 
73
74
* Effect of magnetic field non-uniformity, alignment on track fit -- CH had issues reading mag field map from Joe Langland's program. CH will check against comsol map for 7469.