This page has a bunch of notes, from setting up the trackers in November 2014.

Hardware Installation

  • Wienier Power Supplies:
    • Mains Power supply connected through Daresbury control system,
    • 5V TTL signal fanned out from the Fermilab rack monitor.
    • Cryo2 PSU shows over voltage protection
    • This was caused by a short between the 5V5 rail and the cryostat, using an over tight cable tie.
    • In addition there was a broken sense wire (probably manhandling).
  • VME Crates:
    Upstream Rack contains DAQ crate and C&M Crate.
    Downstream Rack contains DAQ crate.
  • AFE Boards:
  • LVDS Cables
    The left hand boards (viewed from the front) seen here on the right begin with the LVDS silver side up (for all cables)
    The right hand boards (viewed from the front) seen here on the left begin with the LVDS silver side down (for all cables)
  • 1553 is the coaxial cable on the far left, connected to J26 shown above.
  • The Encoded clock signal is connected to the upper coaxial cable. This is provided from a VME fanout, configured with TTL Bar (inverted).
  • The integrations window is connected on the below cable (marked red).

h.3 Photos:
1553 Controller Address
1553 Backplane Address
VLSB Address
VLSB Front Panel

Cryostat Cooling

  • Alan Recalibrated the Oxford ITC503's
    • Cryo 1,2,3 all have "good" calibrations.
    • Cryo 4 would not communicate, however a calibration was completed by hand.
    • The spare was pretty useless.
    • All numbers are slightly untrusted, Alan plans to try and replace.
  • Upstream Cryos:
    • Cryo 1 - 30m line, Charged 1.4MPa, After cooling for 2.5 days, temperatures: 82.3, 7.8, 7.4, insulating vacuum: 2.1E-7 Torr
    • Cryo 2 - 30m line, Charged 1.4MPa, After cooling for 2.5 days, temperatures: 82.4, 8.0, 7.5, insulating vacuum: 1.9E-6 Torr
    • Temperatures on the VLPCs read around 9K - no headroom for heaters to stabilise at 9K.
    • During setup compressors 1 & 2 blew the pressure relief valves.
  • Downstream Cryos:
    • Cryo3 - 10m line, charged 1.6MPa, temps: 82.5, 7.8, 7.0, vacuum: 3.1E-7
    • Cryo4, ?m line, charged 1.6MPa, temps: 71.1, 8.0, 6.7, vacuum: 3.8E-7

Rack to Rack Cabling:

MLCR->Upstream Tracker Rack (TR-US-n)
Cable (n) Length (ns) Checked Asignment
1 249 OK
2 249 OK
3 249 OK
4 249 OK
5 249 OK
6 249 OK Particle Trigger
7 249 OK Integration Window
8 249 OK LED Trigger

New cabling to be updatedd...

MLCR->Downstream Tracker Rack (TR-DS-n)
Cable (n) Length (ns) Checked
1 151 OK
2 151 OK
3 151 OK
4 147 OK
5 146 OK
6 153 OK
7 140 OK
8 140 OK
Uptream -> Downstream Tracker Rack (TR-USDS-n)
Cable (n) Length (ns) Checked
1 112 OK
2 112 OK
3 112 OK
4 112 OK
5 112 OK
6 112 OK
7 225 OK
8 225 OK

Assorted Troubleshooting:

  • If Temperatures read around 20k and are constant, connection to cassette is bad.
  • If VME crate Fails t establish connection, check that the a2818 driver is loaded from ~/a2818_Drv (probably)
    • If this fails, check the card is in the machine.

Updated by Overton, Edward over 8 years ago ยท 20 revisions