h1. Mock Data Challenge Plan
2 2 George, Melissa
3
Mission Statement:
4
To test the Tracker system from a trigger through the DAQ and software.  If possible with cold cryostats and at at least one tracker with full waveguides in place.
5
6
Main Goals:
7 5 George, Melissa
* Get a working trigger input from the LED system (Yordans new trigger logic)
8 2 George, Melissa
* One tracker with cold cryos 
9
* One with full waveguides attached
10
* Understand noise in the system
11
* DAQ - Use code that is committed into the repository and hardware defined in the database and updated firmware on VME boards.
12
* LED - repeat November test with everything on LED system hooked up (unless we have a serious noise problem) and determine light yield required.
13
* understand grounding.
14 3 George, Melissa
* To have a working monitoring and online reconstruction tool patched into v7r3 in the control room.
15 2 George, Melissa
16
17
Secondary Goals:
18 4 George, Melissa
* Both trackers with cold cryos 
19
* Both trackers with full waveguides attached
20 2 George, Melissa
* LED - determine appropriate brightness required by LED system and set it if possible
21
* Reduce noise to acceptable levels (cryostat grounding).
22
* Fix issues with grounding (vme crates etc)
23 3 George, Melissa
* The monitoring and online reconstruction tool patched int v7r3 in the control showing sensible readout.