Mock Data Challenge Plan » History » Version 5
George, Melissa, 15 January 2015 16:04
1 | 1 | Kyberd, Paul | h1. Mock Data Challenge Plan |
---|---|---|---|
2 | 2 | George, Melissa | |
3 | Mission Statement: |
||
4 | To test the Tracker system from a trigger through the DAQ and software. If possible with cold cryostats and at at least one tracker with full waveguides in place. |
||
5 | |||
6 | Main Goals: |
||
7 | 5 | George, Melissa | * Get a working trigger input from the LED system (Yordans new trigger logic) |
8 | 2 | George, Melissa | * One tracker with cold cryos |
9 | * One with full waveguides attached |
||
10 | * Understand noise in the system |
||
11 | * DAQ - Use code that is committed into the repository and hardware defined in the database and updated firmware on VME boards. |
||
12 | * LED - repeat November test with everything on LED system hooked up (unless we have a serious noise problem) and determine light yield required. |
||
13 | * understand grounding. |
||
14 | 3 | George, Melissa | * To have a working monitoring and online reconstruction tool patched into v7r3 in the control room. |
15 | 2 | George, Melissa | |
16 | |||
17 | Secondary Goals: |
||
18 | 4 | George, Melissa | * Both trackers with cold cryos |
19 | * Both trackers with full waveguides attached |
||
20 | 2 | George, Melissa | * LED - determine appropriate brightness required by LED system and set it if possible |
21 | * Reduce noise to acceptable levels (cryostat grounding). |
||
22 | * Fix issues with grounding (vme crates etc) |
||
23 | 3 | George, Melissa | * The monitoring and online reconstruction tool patched int v7r3 in the control showing sensible readout. |