1 1 Kyberd, Paul
h1. Mock Data Challenge Plan
2 2 George, Melissa
3
Mission Statement:
4
To test the Tracker system from a trigger through the DAQ and software.  If possible with cold cryostats and at at least one tracker with full waveguides in place.
5
6
Main Goals:
7
* Get a working trigger input from the LED system
8
* One tracker with cold cryos 
9
* One with full waveguides attached
10
* Understand noise in the system
11
* DAQ - Use code that is committed into the repository and hardware defined in the database and updated firmware on VME boards.
12
* LED - repeat November test with everything on LED system hooked up (unless we have a serious noise problem) and determine light yield required.
13
* understand grounding.
14
15
16
Secondary Goals:
17
* LED - determine appropriate brightness required by LED system and set it if possible
18
* Reduce noise to acceptable levels (cryostat grounding).
19
* Fix issues with grounding (vme crates etc)