h1. Meeting 2015-4-3
2
3
Date: 4th March 2015
4
Time: 15:00 UK time
5
Attendance: 
6
Apologies: 
7
8
h2. Agenda and Minutes
9
10
h3. Actions from Last Meeting
11
12
* MU to look in what to release as MICE notes and how - MU - ONGOING 
13
* Kalman doesnt work on straights.  - Chris and Adam looking to fix 
14
* Not yet able to test against multiple tracks per trigger with MC - Durga - Melissa to remind Durga
15
* Real data unpacking broken - 
16
* Ensure central fibre is correctly defined in geometry and with Tracker group and correct if necessary - C Heidt - Talked with Victoria and he now understands the problem.  As central fibre and doubling it gives the wrong number of channels in the plane although it should not effect this.  
17
* Prepare a tag out lock out procedure to stop people turning things off that we don't want them to (He etc. - Add the above to the controls and monitoring alarms so that if the above happens we know - Pierrick
18
* Add to John Govans' rota for daily walk round to test our setup. - Pierrick 
19
* write emergency shutdown procedure - MU almost complete to do today
20
* Check if the control room simple fix will work for the Tracker head - E.O
21
* Organise a break out meeting at cm41. Plan for the next M.D.C - MU - DONE
22
* MU to look in what to release as MICE notes and how - MU - ONGOING 
23
24
25
h3. 0. Mock data challenges
26
27
As a result of the last MDC Craig has fixed the local grounding:  Now each of the crates is connected to the copper rack ground and the cryos and racks are grounded to the floor.  
28
29
Before cryo3 main cryo can is 50mOhm to frame and extra 10mOhms to the floor and the strap makes about 10mOhms difference.  Cryo1 seems to have its strap disconnected, and to ground is 200mOhms.
30
Now Vener chassis to consumer unit ~20mOhms. But grounding done properly.
31
32
h3. 1. Status of commissioning work and ongoing plan
33
34
Local ground done.
35
DAQ
36
37
h3. 2. Software: AD, ES, CH
38
39
Unpacking and pattern recognition are the highest priority.
40
41
h4. Documentation - AD, ES, C. Heidt
42
43
h4. Geometry, Calibrations, Configurations, CDB - C. Heidt
44
45
h4. Monte Carlo
46
47
h4. Pattern Recognition - AD, 
48
49
h4. Online Displays - MU Half of the plots are now in and working and were used for mock data challenge.  the other are the non essentials and are coming soon.
50
51
52
h4. Performance and Analysis
53
54
h4. Issues
55
56
h4. Tracker Software Paper - AD
57
58
59
h3. 4. What and when are there opportunities to do before step IV and what can we do to be ready for them?
60
61
* 8th March ISIS run.  We will not run but will aim to have our stuff in controls and monitoring 
62
Goals:
63
* To synchronise with the ISIS RF which was done at the single station test in two days (but we can try to complete in 1) and we will need a day with LEDs in advance. One station in one tracker at least necessary for this but one in each trackers is best.
64
* And to ensure that everything not completed as part of the mock data challenge is completed.
65
66
Alignment will not be able to be done before this and therefore it is no a goal for this run.
67
68
69
h3. 5. Optimising the DAQ
70
71
Group has started and work has begun we meeting held and next will be at cm41.
72
73
h3. 6. Tracker lab - AB, GB, CM
74
75
used and clean.
76
77
78
h3. 7. Installation
79
80
* Installation Manual - GB MU - ongoing
81
82
* External Waveguides - MU
83
84
* Cryostats - CM, AB, DA
85
86
h3. 8. Services in the MICE hall: CM okay
87
88
h3. 9. Step IV Analysis Readiness - MU
89
90
* Tracker alignment - MU - ongoing
91
* To do list, timeline etc. for step IV
92
93
h3. 10. Risks
94
95
h4. 10.1 Hardware
96
97
* Daresbury electronics: vacuum, tracker interlocks 
98
* Reforming external waveguides (could lead to breakage)
99
* Northside PRY (not us, but knock effect to us)
100
101
h4. 10.2 Software 
102
103
* Not yet able to test against multiple tracks per trigger with MC -Action for Durga
104
* Real data unpacking broken DA
105
106
h2. 11. Tracker Documentation
107
108
We need to produce documentation for in the control room, for Steve B.  We cannot necessarily get that far with operations and startup as we are not yet working with the CandM as we will but we can write something and finalise safety details.
109
110
h3. 11.0 Startup Procedure
111
112
h3. 11.1 Operations Procedure
113
114
h3. 11.2 Tracker Online Emergency Procedure
115
116
* Provide documentation for ISIS and eventually shifters in what to do in an emergency situation for the Tracker when running 
117
Documentation to Include:
118
- schematics of the system
119
- a list of associated checklists at power on, and who works through them.
120
- a list of instructions to shifters on how to operate and monitor the system
121
- emergency shutdown instructions
122
- power-up instructions
123
- trouble-shooting : what to watch for
124
- a list of regular maintenance and safety checks
125
126
* If the system shuts down do not restart Tracker expert only.
127
* Power outage greatest risk, cryostat will stay cold lid will be cold and moisture will get on electronics. - If this happens run lid heater boxes of UPS.
128
129
SCHEMATIC OF SYSTEM
130
From NIM paper
131
132
ASSOCIATED CHECKLIST AT POWER ON AND RESPONSIBILITY
133
Tracker expert
134
135
LIST FOR SHIFTERS OF HOW TO OPERATE AND MONITOR TRACKER SYSTEM
136
* ongoing consider post Mock Data Challenge
137
138
Emergency shutdown Procedure
139
* Turn off veners
140
* Isolate cryostat vacuum
141
* Turn off pumps
142
* Turn off compressors.
143
144
IDENTIFY ITEMS THAT NEED REGULAR MAINTENANCE AND SAFETY CHECKS
145
* Cryostats
146
* Cold heads
147
* Helium bottles
148
149
150
h3. AoB
151
152
Organise a break out meeting at cm41. 
153
154
h3. Actions
155
156
157
158
h2. Phone Details
159
160
* The four digit company id: 4673 (callers from outside the UK)
161
* The pin number: 419357
162
163
164
Phone numbers:
165
166
| UK (Imperial College --preferred) | 0845 545 4460 | English |
167
| Austria | 0820 4000 1503 | English |
168
| | 0820 4000 15 02 | German |
169
| Belgium | 070 35 99 45 | English |
170
| | 070 35 99 94 | Dutch |
171
| | 070 35 98 66 | French |
172
| Canada | 1 712 432 2832 | English |
173
| | 1 712 432 2844 | French |
174
| Germany | 01803 001 178 | English |
175
| | 01570 248 8303 | English (mobile) |
176
| | 01803 001 177 | German |
177
| | 01570 248 8101 | German (mobile) |
178
| Ireland | 0818 270 007 | English |
179
| Italy | 848 390 166 | English |
180
|  | 848 391 819 | Italian |
181
| Netherlands | 0870 001 901 | English |
182
|  | 0870 001 909 | Dutch |
183
| Poland | 0801 003 543 | English |
184
|  | 0801 003 533 | Polish |
185
| South Africa | 087 550 0375 | English |
186
| Spain | 902 885 318 | English |
187
|  | 902 881 200 | Spanish |
188
| Sweden | 0939 2066 400 | English |
189
|  | 0939 2066 300 | Swedish |
190
|Switzerland | 0848 560 190 | English |
191
|  | 0848 560 378 | French |
192
|  | 0848 560 347 | German |
193
|  | 0848 560 385 | Italian |
194
| United Kingdom (PowWowNow) | 0844 4 73 73 73 | English |
195
| United States | 1 415 363 0833  | English |