h1. Face to Face Meeting 2015-1-15
2 1 George, Melissa
3 3 George, Melissa
h1. Meeting 2015-1-15
4 1 George, Melissa
5 3 George, Melissa
Date: 15th January 2015
6 1 George, Melissa
Time: 14:00 UK time
7 6 George, Melissa
Attendance: Melissa, Craig, Paul k, Chris Heidt, David A, Paulo, Pierrick, Ed O, Alan B, Geoff B, Ray, Chris R (late)
8 3 George, Melissa
Apologies: Adam
9 1 George, Melissa
10
h2. Agenda and Minutes
11
12
h3. Actions from Last Meeting
13
14
15 6 George, Melissa
* GB to add all documentation to mice Mine - GB - ALL in Tracker Documents
16
* MU to look in what to release as MICE notes and how - MU - ONGOING WAITING ON DOCS
17
* Kalman doesnt work on straights.  - Chris and Adam looking to fix - ONGOING
18
* Not yet able to test against multiple tracks per trigger with MC - Durga - ONGOING
19
* Real data unpacking broken - DA - it breaks between v7.5 and 7.6 as unpacking sw not versioned its hard to pin down.  He thinks he has traced the fault.  Stick with v7.3 in control room with a patch for OM plots (Melissa and Rhys).  Single station test data can be used to help discover how to fix this. 
20
* Face to face agenda - MU - DONE
21
* Make mock data challenge wiki page for prep discussion. - MU - DONE
22
* Check with R. Bayes that this does not affect things in main CDB geometry - C. Heidt - Polished up geometry from C Hunt need to get files from Geoff. - New action GB and MU - Geoff and Melissa meet  with Jason tomorrow. - DONE
23 1 George, Melissa
* Ensure central fibre is correctly defined in geometry and with Tracker group and correct if necessary - C Heidt CARRIES OVER
24 6 George, Melissa
* Issues found with NIM paper description of external waveguide end to end mapping check with Geoff and SW - MU AT MEETING tomorrow with Geoff - ONGOING
25 1 George, Melissa
26
27
h3. Status of commissioning work and ongoing plan
28
* Cryostats in trench
29
* leak checking
30
* He line purge
31 6 George, Melissa
* valve change - that was just supply line on two so thats now fixed.
32 1 George, Melissa
* waveguides
33 6 George, Melissa
* DAQ commissioning
34 1 George, Melissa
35 6 George, Melissa
Downstream cryos 3 and 4 are at 5.9 and 6.
36
Pins put in for waveguides and glue to fix the broken boots on the waveguides.  Geoff needs details of what not to use.
37
Use calibrated torque wrenches in black boxes.
38
US cryo2 is as gone from room temp to 9 degrees in 20hours.
39
US cryo1 on its second cycle.
40
US cryos and services are in trench.
41
Craig thinks there is a small leak on cryo 3 at 0.1 degree rise per week.
42
Leaks found at fitting to change them to swageloks they are being ordered.
43
Missing o rings replaced.
44
spare vme controller order requested.
45
New Oxfords not yet arrived.
46 1 George, Melissa
47 6 George, Melissa
Waveguides are very tight and there is a concern that they will not fit through the pry.  We need to make our spares in the longer length.  But for Step iv we don't have time to make new connectors or manufacture new D0 ends.  Things are very tight for step IV.  Hook up will happen over the next few days.  Kevin may come up to help.  will definitely need to reposition patch panel connectors to get them to fit.
48
49
LED system:
50
Need a benchmark of how much light we need before Ed can update it.  So we will use single LED hooked up to pulse generator, run that find out how much more light to adapt the pulser for and then that work can be done.  But it depends on quality of readout.  Need temp and noise ok before we do LEDs.  Need 1.5 PE from LED (anywhere from 1-2).
51
52
LVDS cables may have some ground loops that cause high noise.  Didn't see the high noise in single station or tracker lab tests. affecting analogues signal but not digital.
53
54
Trigger Ed has updated Yordans trigger so we should be good to go.  LED trigger will go into Geneva 1 trigger.
55
56
US cryos are already cabelled up, DS is being worked on but it seems that there is an intermittent short where certain boards prefer particular slots.
57
58
Paul arrives tomorrow so fixing a lot of this stuff like what crates to put where grounds etc he will help with that and a lot of work will happen over the weekend. 
59
60
Online monitoring and reconstruction will be done at a minimal levels just hits and event displays and ADC/TDC from Rhys.  David will send code to Rhys but not sure how much it will help.
61
62
Melissa to help with WGS and ask Kevin and Celeste as well.
63
64 1 George, Melissa
h3. Plan for mock data challenge. see [[../Mock Data Challenge Plan|Mock Data Challenge Plan]]
65
66 6 George, Melissa
David 
67
68 1 George, Melissa
h3. What and when are there opportunities to do before step IV and what can we do to be ready for them?
69 3 George, Melissa
70 6 George, Melissa
* 7th March ISIS run? (validation of double dip run)
71 1 George, Melissa
72 6 George, Melissa
Its just one day for us (the rest is for engineers) and its a weekend and they don't want us to run but we are trying to get to be able to use it but its a bit unknown.
73
74
Goals:
75
* To synchronise with the ISIS RF which was done at the single station test in two days (but we can try to complete in 1) and we will need a day with LEDs in advance. One station in one tracker at least necessary for this but one in each trackers is best.
76
* And to ensure that everything not completed as part of the mock data challenge is completed.
77
78
Alignment will not be able to be done before this and therefore it is no a goal for this run.
79
80
81 1 George, Melissa
h3. Speeding up the DAQ
82
83 6 George, Melissa
* Paul arrives tomorrow to inspect the firmware as it currently is and check the discriminator output matches the ADC output as that is what we will limit ourselves to if we remove analogue data from DAQ.  He will return to update the firmware in this regard.
84
85
We have to set 32 discriminators at once and they are all about the same gain and pedestal,  Set discriminator rate to 1%.
86
87
Can we convince ourselves that just running with discriminators is safe in which case we wont lose any data and can run as fast as we want.  We need to have a level two trigger on TOF data (timing cut  etc) to have an analysable muon selection.
88
89
Need to have a new working group of all parties to discuss 
90
91 1 George, Melissa
h3. Step IV Readiness, to do list, timeline etc.
92
93 6 George, Melissa
Discuss at Mock data challenge post mortem meeting on 28th January 3pm.
94
95
96 1 George, Melissa
h3. Risks
97
h4. Hardware
98
99 6 George, Melissa
* Is it wise to get the spare VME controller from Strathclyde (they are happy for this) just in case for mock data run? - No we have ordered a spare and it has been approved.
100 5 George, Melissa
101 1 George, Melissa
* Daresbury electronics: vacuum, tracker interlocks 
102
* Reforming external waveguides (could lead to breakage)
103
* Northside PRY (not us, but knock effect to us)
104
* Power supply (spare arrives mid Jan) - MITIGATED
105
106 6 George, Melissa
h4. 8.2 Software - SEE ACTIONS
107 1 George, Melissa
108
* Not yet able to test against multiple tracks per trigger with MC -Action for Durga
109
* Real data unpacking broken DA
110
111
h3. Tracker Online Emergency Procedure
112
113
* Provide documentation for ISIS and eventually shifters in what to do in an emergency situation for the Tracker when running 
114
Documentation to Include:
115
- schematics of the system
116
- a list of associated checklists at power on, and who works through them.
117
- a list of instructions to shifters on how to operate and monitor the system
118
- emergency shutdown instructions
119
- power-up instructions
120
- trouble-shooting : what to watch for
121
- a list of regular maintenance and safety checks
122
123 6 George, Melissa
* If the system shuts down do not restart Tracker expert only.
124
* Power outage greatest risk, cryostat will stay cold lid will be cold and moisture will get on electronics. - If this happens run lid heater boxes of UPS.
125 1 George, Melissa
126 6 George, Melissa
SCHEMATIC OF SYSTEM
127
From NIM paper
128 1 George, Melissa
129 6 George, Melissa
ASSOCIATED CHECKLIST AT POWER ON AND RESPONSIBILITY
130
Tracker expert
131
132
LIST FOR SHIFTERS OF HOW TO OPERATE AND MONITOR TRACKER SYSTEM
133
* ongoing consider post Mock Data Challenge
134
135
Emergency shutdown Procedure
136
* Turn off veners
137
* Isolate cryostat vacuum
138
* Turn off pumps
139
* Turn off compressors.
140
141
IDENTIFY ITEMS THAT NEED REGULAR MAINTENANCE AND SAFETY CHECKS
142
* Cryostats
143
* Cold heads
144
* Helium bottles
145
146
147 1 George, Melissa
h3. AoB
148
149
h3. Actions
150
151 6 George, Melissa
* Send waveguide details of broken WGs to Geoff from QA - MU
152
* Spare waveguides should be longer than existing long ones says Geoff
153
* Melissa to help with WGS and ask Kevin and Celeste as well. _ MU
154
* Prepare a tag out lock out procedure to stop people turning things off that we don't want them to (He etc.).
155
* Add the above to the controls and monitoring alarms so that if the above happens we know - Pierrick
156
* Add to John Govans rota for daily walk round to test our setup. - Pierrick
157
* Email Yordan Chris R, Victoria and Tracker group to set up a working group for level 2 trigger - MU.
158
* Plan to set up  working group for level 2 trigger as a result of above.
159
* make a request for UPS on heater box lids - Pierrick
160
* write emergency shutdown procedure - Alan B. and David A.
161 1 George, Melissa
162
h2. Phone Details
163
164
* The four digit company id: 4673 (callers from outside the UK)
165
* The pin number: 419357
166
167
168
Phone numbers:
169
170
| UK (Imperial College --preferred) | 0845 545 4460 | English |
171
| Austria | 0820 4000 1503 | English |
172
| | 0820 4000 15 02 | German |
173
| Belgium | 070 35 99 45 | English |
174
| | 070 35 99 94 | Dutch |
175
| | 070 35 98 66 | French |
176
| Canada | 1 712 432 2832 | English |
177
| | 1 712 432 2844 | French |
178
| Germany | 01803 001 178 | English |
179
| | 01570 248 8303 | English (mobile) |
180
| | 01803 001 177 | German |
181
| | 01570 248 8101 | German (mobile) |
182
| Ireland | 0818 270 007 | English |
183
| Italy | 848 390 166 | English |
184
|  | 848 391 819 | Italian |
185
| Netherlands | 0870 001 901 | English |
186
|  | 0870 001 909 | Dutch |
187
| Poland | 0801 003 543 | English |
188
|  | 0801 003 533 | Polish |
189
| South Africa | 087 550 0375 | English |
190
| Spain | 902 885 318 | English |
191
|  | 902 881 200 | Spanish |
192
| Sweden | 0939 2066 400 | English |
193
|  | 0939 2066 300 | Swedish |
194
|Switzerland | 0848 560 190 | English |
195
|  | 0848 560 378 | French |
196
|  | 0848 560 347 | German |
197
|  | 0848 560 385 | Italian |
198
| United Kingdom (PowWowNow) | 0844 4 73 73 73 | English |
199
| United States | 1 415 363 0833  | English |