Project

General

Profile

Meeting 2015-1-14 » History » Version 2

George, Melissa, 09 January 2015 12:39

1 1 George, Melissa
h1. Face to Face Meeting 2015-1-14
2
3
h1. Meeting 2014-12-17
4
5
Date: 14th January 2015
6
Time: 14:00 UK time
7
Attendance: 
8
Apologies: 
9
10
h2. Agenda and Minutes
11
12
h3. Actions from Last Meeting
13
14
15
* GB to add all documentation to mice Mine - GB
16
* MU to look in what to release as MICE notes and how - MU
17
* Kalman doesnt work on straights.  - Chris and Adam looking to fix
18
* Not yet able to test against multiple tracks per trigger with MC - Durga
19
* Real data unpacking broken - DA 
20
* Face to face agenda -MU
21
* Make mock data challenge wiki page for prep discussion. - MU
22
* Check with R. Bayes that this does not affect things in main CDB geometry - C. Heidt - Polished up geometry from C Hunt need to get files from Geoff. - New action GB and MU - Geoff and Melissa meet  with Jason tomorrow.
23
* Ensure central fibre is correctly defined in geometry and with Tracker group and correct if necessary - C Heidt CARRIES OVER
24
* Issues found with NIM paper description of external waveguide end to end mapping check with Geoff and SW - MU AT MEETING tomorrow with Geoff
25
26
27
h3. Status of commissioning work and ongoing plan
28
29
h3. Review and finalise plan for mock data challenge.
30
31 2 George, Melissa
h3. What and when are there opportunities to do before step IV and what can we do to be ready for them?
32 1 George, Melissa
33 2 George, Melissa
* March ISIS run?
34
35 1 George, Melissa
h3. Speeding up the DAQ
36
37 2 George, Melissa
h3. Step IV Readiness, to do list, timeline etc.
38 1 George, Melissa
39
h3. Risks
40
h4. Hardware
41
42
* Daresbury electronics: vacuum, tracker interlocks 
43
* Reforming external waveguides (could lead to breakage)
44
* Northside PRY (not us, but knock effect to us)
45
* Power supply (spare arrives mid Jan) - MITIGATED
46
47
h4. 8.2 Software
48
49
* Not yet able to test against multiple tracks per trigger with MC -Action for Durga
50
* Real data unpacking broken DA
51
52
h3. Tracker Online Emergency Procedure
53
54
* Provide documentation for ISIS and eventually shifters in what to do in an emergency situation for the Tracker when running 
55
Documentation to Include:
56
- schematics of the system
57
- a list of associated checklists at power on, and who works through them.
58
- a list of instructions to shifters on how to operate and monitor the system
59
- emergency shutdown instructions
60
- power-up instructions
61
- trouble-shooting : what to watch for
62
- a list of regular maintenance and safety checks
63
64
65
66
h3. AoB
67
68
h3. Actions
69
70
71
h2. Phone Details
72
73
* The four digit company id: 4673 (callers from outside the UK)
74
* The pin number: 419357
75
76
77
Phone numbers:
78
79
| UK (Imperial College --preferred) | 0845 545 4460 | English |
80
| Austria | 0820 4000 1503 | English |
81
| | 0820 4000 15 02 | German |
82
| Belgium | 070 35 99 45 | English |
83
| | 070 35 99 94 | Dutch |
84
| | 070 35 98 66 | French |
85
| Canada | 1 712 432 2832 | English |
86
| | 1 712 432 2844 | French |
87
| Germany | 01803 001 178 | English |
88
| | 01570 248 8303 | English (mobile) |
89
| | 01803 001 177 | German |
90
| | 01570 248 8101 | German (mobile) |
91
| Ireland | 0818 270 007 | English |
92
| Italy | 848 390 166 | English |
93
|  | 848 391 819 | Italian |
94
| Netherlands | 0870 001 901 | English |
95
|  | 0870 001 909 | Dutch |
96
| Poland | 0801 003 543 | English |
97
|  | 0801 003 533 | Polish |
98
| South Africa | 087 550 0375 | English |
99
| Spain | 902 885 318 | English |
100
|  | 902 881 200 | Spanish |
101
| Sweden | 0939 2066 400 | English |
102
|  | 0939 2066 300 | Swedish |
103
|Switzerland | 0848 560 190 | English |
104
|  | 0848 560 378 | French |
105
|  | 0848 560 347 | German |
106
|  | 0848 560 385 | Italian |
107
| United Kingdom (PowWowNow) | 0844 4 73 73 73 | English |
108
| United States | 1 415 363 0833  | English |