h1. Meeting 2014-09-17
2
3
Date: 17th September 2014
4
Time 15:00 BST
5
Attendance:
6
7
8
h2. Agenda and Minutes
9
10
h3. 0. Actions
11
12
* Asymmetric results between trackers: Kalman to extrapolate back to tracker reference surface - C. Hunt, ES
13
* Create MICE note of channel mappings end-to-end through hardware, electronics and software - DA
14
** Email AD about mappings - DA
15
** Find D0 note and make into MICE note - AB
16
* Create comparison plots for channel mapping data - CH
17
18
h3. 1. Software: AD, ES, CH, ST
19
20
* Schedule - AD See document#88.
21
* MAUS version 0.9.0 released with lots of scifi updates
22
23
24
h4. 1.1 Documentation - AD, ES, CH
25
26
* Base documentation - AD
27 4 Heidt, Christopher
* Digitization - CH, ES
28 1 Dobbs, Adam
* Pattern Recognition - AD
29
* Track fit - ES
30
* MC - CH
31
* Geometry, CDB - CH
32
* Noise - CH
33
34
h4. 1.2 Geometry, Calibrations, Configurations, CDB - CH
35
36
* Helium windows not in geometry - CH
37
* Get CMM geometry data in to CDB - CH
38
* Translate CDB geometry xml into MiceModules format _Now able to pull down from CDB but still crashing when try to run sim with it_ - AD, C. Heidt
39
40
h4. 1.3 Monte Carlo
41
42
* MC Noise - CH
43
** Look at large cpu load
44
* ADC smearing needs fixing - CH
45
46
h4. 1.4 Pattern Recognition - AD
47
48
* Find a way increasing error for low pt tracks and implement
49
50
h4. 1.5 Online Displays - MU
51
52
h4. 1.6 Performance
53
54
* Spacepoint efficiency study - CH, AD
55
* Bias difference between trackers to be investigate - C. Hunt, ES _99% solved, need to get Kalman to extrapolate back to tracker reference surface_
56
* Low pt performance - AD
57
* Recon emittance vs MC truth emittance study - C. Hunt
58
* Spacepoint efficiency study - C. Hunt
59
60
h4. 1.7 Issues
61
62
* Final track fit - ES
63
** Deal with -ve charge
64
* Possible bug found in plane mapping
65
66
h3. 2. DAQ/Calibration/Controls - DA, EO
67
68
* DAQ system test in Nov 14?
69
70
 _Plan for QA in September_ "doc":http://micewww.pp.rl.ac.uk/attachments/2337/Spares_QA.doc
71
 _Plan for integration with beam_ "doc":http://micewww.pp.rl.ac.uk/attachments/2337/TrackerBeamIntegration.doc
72
73
One of the cryos has been cabled up so we have one board readout electronics all cabled up. No problems yet.  Running, initialises and reads out compressed data  Pedestal data taken (as cryos not cold) 1 run taken with bayonet out and one in (shows load above pedestal) visible in ADC distribution.  Boards show no major problems with chips etc.  Rest of boards will now be checked.  All checks that can be done while warm will be done.  VLSB and cables all cycled through.
74
75
Vacuum pumps brand new but all broken.  Will be serviced by Craig in due course.
76
77
h4. 2.1 MiniDAQ - DA
78
79
Being used.
80
81
h4. 2.2 Channel Mappings
82
83
* Check our channel mapping from end to end and make sure correct - DA, AD, ES, CH
84
* Dig up the old documentation for the electronics channel mapping - DA
85
** AFE/cassette channel mapping: MICE note 447.
86
87
came from concerns that channels were swapped after cosmics. We think that it is not a problem.
88
89
ACTION: David A. to email Adam. 
90
ACTION; AB Find D0 note and make into MICE note.
91
92
h4. 2.3 Controls
93
94
* Create controls system - DA
95
96
h4. 2.4 Hall Probes - MU
97
98
We already have a working system but we will improve it and make it more user friendly.
99
100
h3. 3. LED: EO
101
102
* EO currently busy with thesis, back on LED in Sept - Oct
103
* Finished second pulser box - CM
104
* Polish fibre ends - CM
105
* Make documentation mapping LEDs to areas of tracker illuminated - EO
106
* Provide documnetation to Maurizio about whether it would be helpful to fit LED into TOF to help our timing - EO 
107
108
Craig has the bare bones of the system and Ed will assemble the spares when he has finshed writing and check everything in more detail.
109
110
h3. 4. Tracker lab - AB, GB, CM
111
112
* Set up cryostat test system - CM
113
* Turbo overhaul?
114
* Helium line in from R9 now in lab and working well
115
116
Tidy and in use.
117
118
h3. 5. Installation
119
120
* ISIS long shut down: 25th Aug 2014 - 8th Feb 2015
121
* Tracker 2 log to be produced by GB with updated numbering
122
* Schedule
123
** Current schedule at document#85 - timetable still subject to change (constraints from AFC, etc)
124
** Add resource loading? - CM
125
* -Finish installation manual - GB, MU- _Done, stick final version on wiki_
126
* External waveguides
127
** September to be begin QA
128
129
** Load of fibre and 5 complete connectors random received from AB, not too sure what to do with them. GB to email AB about what is available to determine if we need to order items in.
130
131
h3. 6. Services in the MICE hall: CM
132
133
* CM discussing with AN and JG about chilled water and compressors
134
* Helium lines
135
136
h3. 7. Step IV Analysis Readiness - MU
137
138
* Tracker alignment - MU
139
140
h3. 8. Risks
141
142
* Daresbury electronics: vacuum, tracker interlocks
143
* Reforming external waveguides (could lead to breakage)
144
* Leak from cryostat cassettes
145
3/4 tested and tight.  AB to test the 4th on 3rd sept.
146
* Northside PRY (not us, but knock effect to us)
147
Can we add cryostats etc early..? decision to be made.
148
* Not yet able to test against multiple tracks per trigger with MC
149
150
h3. 9. AoB and summary of actions.
151
152
h2. Phone Details
153
154
* The four digit company id: 4673 (callers from outside the UK)
155
* The pin number: 419357
156
157
158
Phone numbers:
159
160
| UK (Imperial College --preferred) | 0845 545 4460 | English |
161
| Austria | 0820 4000 1503 | English |
162
| | 0820 4000 15 02 | German |
163
| Belgium | 070 35 99 45 | English |
164
| | 070 35 99 94 | Dutch |
165
| | 070 35 98 66 | French |
166
| Canada | 1 712 432 2832 | English |
167
| | 1 712 432 2844 | French |
168
| Germany | 01803 001 178 | English |
169
| | 01570 248 8303 | English (mobile) |
170
| | 01803 001 177 | German |
171
| | 01570 248 8101 | German (mobile) |
172
| Ireland | 0818 270 007 | English |
173
| Italy | 848 390 166 | English |
174
|  | 848 391 819 | Italian |
175
| Netherlands | 0870 001 901 | English |
176
|  | 0870 001 909 | Dutch |
177
| Poland | 0801 003 543 | English |
178
|  | 0801 003 533 | Polish |
179
| South Africa | 087 550 0375 | English |
180
| Spain | 902 885 318 | English |
181
|  | 902 881 200 | Spanish |
182
| Sweden | 0939 2066 400 | English |
183
|  | 0939 2066 300 | Swedish |
184
|Switzerland | 0848 560 190 | English |
185
|  | 0848 560 378 | French |
186
|  | 0848 560 347 | German |
187
|  | 0848 560 385 | Italian |
188
| United Kingdom (PowWowNow) | 0844 4 73 73 73 | English |
189
| United States | 1 415 363 0833  | English |