h1. Meeting 2014-08-20
2
3
Date: 20th August 2014
4
Time 15:00 BST
5
Attendance:
6
Apologies: A. Dobbs
7
8
h2. Agenda and Minutes
9
10
h3. 0. Actions
11
12
* Email AB about what spare waveguide material is available - GB
13
* Asymmetric results between trackers: Kalman to extrapolate back to tracker reference surface - C. Hunt, ES
14
* Create MICE note of channel mappings end-to-end through hardware, electronics and software - DA
15
* DAQ and controls requirements for schedule - DA _CM talking to DA_
16
* Create comparison plots for channel mapping data - CH
17
18
h3. 1. Software: AD, ES, CH, ST
19
20
* Schedule - AD See document#88.
21
* MAUS version 0.9.0 released with lots of scifi updates
22
23
h4. 1.1 Documentation - AD, ES, CH
24
25
* Base documentation - AD
26
* Digitisation - CH, ES
27
* Pattern Recognition - AD
28
* Track fit - ES
29
* MC - CH
30
* Geometry, CDB - CH
31
* Noise - CH
32
33
h4. 1.2 Geometry, Calibrations, Configurations, CDB - CH
34
35
* Helium windows not in geometry - CH
36
* Get CMM geometry data in to CDB - CH
37
* Translate CDB geometry xml into MiceModules format _Now able to pull down from CDB but still crashing when try to run sim with it_ - AD, C. Heidt
38
39
h4. 1.3 Monte Carlo
40
41
* MC Noise - CH
42
** Look at large cpu load
43
* ADC smearing needs fixing - CH
44
45
h4. 1.4 Pattern Recognition - AD
46
47
* Find a way increasing error for low pt tracks and implement
48
49
h4. 1.5 Online Displays - MU
50
51
h4. 1.6 Performance
52
53
* Spacepoint efficiency study - CH, AD
54
* Bias difference between trackers to be investigate - C. Hunt, ES _99% solved, need to get Kalman to extrapolate back to tracker reference surface_
55
* Low pt performance - AD
56
* Recon emittance vs MC truth emittance study - C. Hunt
57
* Spacepoint efficiency study - C. Hunt
58
59
h4. 1.7 Issues
60
61
* Final track fit - ES
62
** Deal with -ve charge
63
* Possible bug found in plane mapping
64
65
h3. 2. DAQ/Calibration/Controls - DA, EO
66
67
* DAQ system test in Nov 14?
68
* DA to give his requirements for the Hall and the tracker lab, in particular with respect to the Integration Schedule (MU to email)
69
 _DA coming to U.K. in first two weeks of September_
70
71
 _Plan for QA it September_ "doc":http://micewww.pp.rl.ac.uk/attachments/2337/Spares_QA.doc
72
 _Plan for integration with beam_ "doc":http://micewww.pp.rl.ac.uk/attachments/2337/TrackerBeamIntegration.doc
73
74
h4. 2.1 MiniDAQ - DA
75
76
h4. 2.2 Channel Mappings
77
78
* Check our channel mapping from end to end and make sure correct - DA, AD, ES, CH
79
* Dig up the old documentation for the electronics channel mapping - DA
80
81
82
h4. 2.3 Controls
83
84
* Create controls system - DA
85
86
h4. 2.4 Hall Probes - MU
87
88
h3. 3. LED: EO
89
90
* EO currently busy with thesis, back on LED in Sept - Oct
91
* Finished second pulser box - CM
92
* Polish fibre ends - CM
93
* Make documentation mapping LEDs to areas of tracker illuminated - EO
94
* Provide documnetation to Maurizio about whether it would be helpful to fit LED into TOF to help our timing - EO 
95
96
h3. 4. Tracker lab - AB, GB, CM
97
98
* Set up cryostat test system - CM
99
* Turbo overhaul?
100
* Helium line in from R9 now in lab and working well
101
102
h3. 5. Installation
103
104
* ISIS long shut down: 25th Aug 2014 - 8th Feb 2015
105
* Possible helium leak on the downstream solenoid
106
* Expecting to move downstream SS to Hall on Monday
107
* Tracker 2 log to be produced by GB with updated numbering
108
* Schedule
109
** Current schedule at document#85 - timetable still subject to change (constraints from AFC, etc)
110
** Add resource loading? - CM
111
* -Finish installation manual - GB, MU- _Done, stick final version on wiki_
112
* External waveguides
113
** September to be begin QA
114
** Load of fibre and 5 complete connectors random received from AB, not too sure what to do with them. GB to email AB about what is available to determine if we need to order items in.
115
116
h3. 6. Services in the MICE hall: CM
117
118
* CM discussing with AN and JG about chilled water and compressors
119
* Helium lines
120
121
h3. 7. Step IV Analysis Readiness - MU
122
123
* Tracker alignment - MU
124
125
h3. 8. Risks
126
127
* Daresbury electronics: vacuum, tracker interlocks
128
* Reforming external waveguides (could lead to breakage)
129
* Leak from cryostat cassettes
130
* Northside PRY (not us, but knock effect to us)
131
* Not yet able to test against multiple tracks per trigger with MC
132
133
h3. 9. AoB and summary of actions.
134
135
h2. Phone Details
136
137
* The four digit company id: 4673 (callers from outside the UK)
138
* The pin number: 419357
139
140
141
Phone numbers:
142
143
| UK (Imperial College --preferred) | 0845 545 4460 | English |
144
| Austria | 0820 4000 1503 | English |
145
| | 0820 4000 15 02 | German |
146
| Belgium | 070 35 99 45 | English |
147
| | 070 35 99 94 | Dutch |
148
| | 070 35 98 66 | French |
149
| Canada | 1 712 432 2832 | English |
150
| | 1 712 432 2844 | French |
151
| Germany | 01803 001 178 | English |
152
| | 01570 248 8303 | English (mobile) |
153
| | 01803 001 177 | German |
154
| | 01570 248 8101 | German (mobile) |
155
| Ireland | 0818 270 007 | English |
156
| Italy | 848 390 166 | English |
157
|  | 848 391 819 | Italian |
158
| Netherlands | 0870 001 901 | English |
159
|  | 0870 001 909 | Dutch |
160
| Poland | 0801 003 543 | English |
161
|  | 0801 003 533 | Polish |
162
| South Africa | 087 550 0375 | English |
163
| Spain | 902 885 318 | English |
164
|  | 902 881 200 | Spanish |
165
| Sweden | 0939 2066 400 | English |
166
|  | 0939 2066 300 | Swedish |
167
|Switzerland | 0848 560 190 | English |
168
|  | 0848 560 378 | French |
169
|  | 0848 560 347 | German |
170
|  | 0848 560 385 | Italian |
171
| United Kingdom (PowWowNow) | 0844 4 73 73 73 | English |
172
| United States | 1 415 363 0833  | English |