Meeting 2014-07-23¶
Date: 23rd July 2014
Time 15:00 BST
Attendance: G. Barber, A. Dobbs, R. Gamet, C. Heidt, C. MacWaters, E. Overton, M. Zgubic
Agenda and Minutes¶
0. Actions¶
- Email AB about what spare waveguide material is available - GB
- Asymmetric results between trackers: Kalman to extrapolate back to tracker reference surface - C. Hunt, ES
- Create MICE note of channel mappings end-to-end through hardware, electronics and software - DA
- DAQ and controls requirements for schedule - DA CM talking to DA
- Create comparison plots for channel mapping data - CH
1. Software: AD, ES, CH, ST¶
- Schedule - AD See MAUS Schedule.
- MAUS version 0.9.0 released with lots of scifi updates
- Momentum resolution presentation - Miha Zgubic pdf pptx
1.1 Documentation - AD, ES, CH¶
- Base documentation - AD
- Digitisation - CH, ES
- Pattern Recognition - AD
- Track fit - ES
- MC - CH
- Geometry, CDB - CH
- Noise - CH
1.2 Geometry, Calibrations, Configurations, CDB - CH¶
- Helium windows not in geometry - CH
- Get CMM geometry data in to CDB - CH
- Translate CDB geometry xml into MiceModules format Now able to pull down from CDB but still crashing when try to run sim with it - AD, C. Heidt
1.3 Monte Carlo¶
- MC Noise - CH
- Look at large cpu load
- ADC smearing needs fixing - CH
1.4 Pattern Recognition - AD¶
- Find a way increasing error for low pt tracks and implement Progress made, confidence factor added to pat rec tracks data structure, not yet populated
1.5 Online Displays - MU¶
1.6 Performance¶
- Spacepoint efficiency study - CH, AD
- Bias difference between trackers to be investigate - C. Hunt, ES 99% solved, need to get Kalman to extrapolate back to tracker reference surface
- Low pt performance - AD
- Recon emittance vs MC truth emittance study - C. Hunt
- Spacepoint efficiency study - C. Hunt
1.7 Issues¶
- Final track fit - ES
- Deal with -ve charge
- Possible bug found in plane mapping
2. DAQ/Calibration/Controls - DA, EO¶
- DAQ system test in Nov 14?
- DA to give his requirements for the Hall and the tracker lab, in particular with respect to the Integration Schedule (MU to email)
DA coming to U.K. in first two weeks of SeptemberPlan for QA it September doc
Plan for integration with beam doc
2.1 MiniDAQ - DA¶
2.2 Channel Mappings¶
- Check our channel mapping from end to end and make sure correct - DA, AD, ES, CH
- Dig up the old documentation for the electronics channel mapping - DA
2.3 Controls¶
- Create controls system - DA
2.4 Hall Probes - MU¶
3. LED: EO¶
- EO currently busy with thesis, back on LED in Sept - Oct
- Finished second pulser box - CM
- Polish fibre ends - CM
- Make documentation mapping LEDs to areas of tracker illuminated - EO
- Provide documnetation to Maurizio about whether it would be helpful to fit LED into TOF to help our timing - EO
4. Tracker lab - AB, GB, CM¶
- Set up cryostat test system - CM
- Turbo overhaul?
- Helium line in from R9 now in lab and working well
5. Installation¶
- ISIS long shut down: 25th Aug 2014 - 8th Feb 2015
- Possible helium leak on the downstream solenoid
- Expecting to move downstream SS to Hall on Monday
- Tracker 2 log to be produced by GB with updated numbering
- Schedule
- Current schedule at Integration Schedule - timetable still subject to change (constraints from AFC, etc)
- Add resource loading? - CM
Finish installation manual - GB, MUDone, stick final version on wiki- External waveguides
- September to be begin QA
- Load of fibre and 5 complete connectors random received from AB, not too sure what to do with them. GB to email AB about what is available to determine if we need to order items in.
6. Services in the MICE hall: CM¶
- CM discussing with AN and JG about chilled water and compressors
- Helium lines
7. Step IV Analysis Readiness - MU¶
- Tracker alignment - MU
8. Risks¶
- Daresbury electronics: vacuum, tracker interlocks
- Reforming external waveguides (could lead to breakage)
- Leak from cryostat cassettes
- Northside PRY (not us, but knock effect to us)
- Not yet able to test against multiple tracks per trigger with MC
9. AoB and summary of actions.¶
Phone Details¶
- The four digit company id: 4673 (callers from outside the UK)
- The pin number: 419357
Phone numbers:
UK (Imperial College --preferred) | 0845 545 4460 | English |
Austria | 0820 4000 1503 | English |
0820 4000 15 02 | German | |
Belgium | 070 35 99 45 | English |
070 35 99 94 | Dutch | |
070 35 98 66 | French | |
Canada | 1 712 432 2832 | English |
1 712 432 2844 | French | |
Germany | 01803 001 178 | English |
01570 248 8303 | English (mobile) | |
01803 001 177 | German | |
01570 248 8101 | German (mobile) | |
Ireland | 0818 270 007 | English |
Italy | 848 390 166 | English |
848 391 819 | Italian | |
Netherlands | 0870 001 901 | English |
0870 001 909 | Dutch | |
Poland | 0801 003 543 | English |
0801 003 533 | Polish | |
South Africa | 087 550 0375 | English |
Spain | 902 885 318 | English |
902 881 200 | Spanish | |
Sweden | 0939 2066 400 | English |
0939 2066 300 | Swedish | |
Switzerland | 0848 560 190 | English |
0848 560 378 | French | |
0848 560 347 | German | |
0848 560 385 | Italian | |
United Kingdom (PowWowNow) | 0844 4 73 73 73 | English |
United States | 1 415 363 0833 | English |
Updated by Adey, David almost 9 years ago · 20 revisions