Meeting 2014-05-14 » History » Version 28

Dobbs, Adam, 14 May 2014 16:14

1 1 Dobbs, Adam
h1. Meeting 2014-05-14
2
3
Date: 14th May 2014
4 3 Dobbs, Adam
Time: 15:00 BST
5 2 Dobbs, Adam
Apologies: D. Adey
6 7 Dobbs, Adam
Attendance: G. Barber, A. Dobbs, P. Kyberd, E. Overton, M. Uchida
7 1 Dobbs, Adam
8
h2. Agenda and Minutes
9
10
h3. 0. Actions
11
12
* Create MICE note of channel mappings end-to-end through hardware, electronics and software - DA
13 28 Dobbs, Adam
* DAQ and controls requirements for schedule - DA 
14 1 Dobbs, Adam
* Create comparison plots for channel mapping data - CH
15
16
h3. 1. Software: AD, ES, CH, ST
17
18
* Schedule - AD See http://micewww.pp.rl.ac.uk/attachments/download/2152.
19
20
h4. 1.1 Documentation - AD, ES, CH
21
22
* Base documentation - AD
23
* Digitisation - CH, ES
24
* Pattern Recognition - AD
25
* Track fit - ES
26
* MC - CH
27
* Geometry, CDB - CH
28
* Noise - CH
29
30
h4. 1.2 Geometry, Calibrations, Configurations, CDB - CH
31
32
* Helium windows not in geometry - CH
33
* Get CMM geometry data in to CDB - CH
34
* Translate CDB geometry xml into MiceModules format _Now able to pull down from CDB but still crashing when try to run sim with it_ - AD, CH
35
36
h4. 1.3 Monte Carlo
37
38
* MC Noise - CH
39
** Look at large cpu load
40
** Code review _Complete, need to keep track of actions at http://micewww.pp.rl.ac.uk/projects/maus/wiki/PC030213_
41
* ADC smearing needs fixing - CH
42
43
h4. 1.4 Online Displays - MU
44
45
h4. 1.5 Performance
46
47
* Spacepoint efficiency study - CH, AD
48 8 Dobbs, Adam
* Bias difference between trackers to be investigate - CH, AD _Possibly due to the asymmetric beta_
49 1 Dobbs, Adam
* Low pt performance - AD
50
51
h4. 1.6 Issues
52
53
* Final track fit - ES
54
** Deal with -ve charge
55 8 Dobbs, Adam
** -Track points to link back to clusters- _Done_
56
** -Station numbering bug fixed in tracker branch, merge to trunk- _Done_
57 1 Dobbs, Adam
* Pattern Recognition - AD
58 8 Dobbs, Adam
** -NaNs for some track parameters now fixed in tracker branch, merge to trunk- _Done_
59 1 Dobbs, Adam
60
h3. 2. DAQ/Calibration/Controls - DA, EO
61
62 12 Dobbs, Adam
* DA to give his requirements for the Hall and the tracker lab, in particular with respect to the Integration Schedule (MU to email)
63 11 Dobbs, Adam
64 1 Dobbs, Adam
h4. 2.1 MiniDAQ - DA
65
66
h4. 2.2 Channel Mappings
67
68
* Check our channel mapping from end to end and make sure correct - DA, AD, ES, CH
69
* Dig up the old documentation for the electronics channel mapping - DA
70
71
h4. 2.3 Controls
72
73
* Create controls system - DA
74
75
h4. 2.4 Hall Probes - MU
76
77 9 Dobbs, Adam
* -Hall probe readout - ensure this is sorted before tracker placed in bore- PH, MU- _Done_
78 1 Dobbs, Adam
79
h3. 3. LED: EO
80
81 14 Dobbs, Adam
* Finished second pulser box - CM
82
* Polish fibre ends - CM
83 1 Dobbs, Adam
* Make documentation mapping LEDs to areas of tracker illuminated - EO
84 14 Dobbs, Adam
* Provide documnetation to Maurizio about whether it would be helpful to fit LED into TOF to help our timing - EO 
85 1 Dobbs, Adam
86
h3. 4. Tracker lab - AB, GB, CM
87
88 17 Dobbs, Adam
* Set up cryostat test system - CM
89 1 Dobbs, Adam
90
h3. 5. Installation
91
92 21 Dobbs, Adam
* Integration Schedule
93
** Current schedule at document#85 - timetable still subject to change (constraints from AFC, etc)
94
** Add resource loading? - CM
95 23 Dobbs, Adam
** -Merge with main MICE schedule - CM- _Done, had meeting with KL, RP, AG_
96 26 Dobbs, Adam
* -Tracker integrity during transport from R9 to Hall - add accelerometer - MU- _SS2 now in MICE Hall_
97 23 Dobbs, Adam
* -Finish installation manual - GB, MU- _Done, stick final version on wiki_
98 1 Dobbs, Adam
* External waveguides
99 27 Dobbs, Adam
** New waveguides - GB _In progress_
100 1 Dobbs, Adam
** -Check with KL and AB if we want to proceed - MU-
101
** Need to QA the external waveguides somehow - MU
102 21 Dobbs, Adam
103 1 Dobbs, Adam
h3. 6. Services in the MICE hall: CM
104
105 21 Dobbs, Adam
h3. 7. Step IV Analysis Readiness - MU
106 1 Dobbs, Adam
107
* Tracker alignment - MU
108
109 24 Dobbs, Adam
h3. 8. Risks
110 1 Dobbs, Adam
111 22 Dobbs, Adam
* Daresbury electronics: vacuum, tracker interlocks
112 21 Dobbs, Adam
* Reforming external waveguides (could lead to breakage)
113
* Leak from cryostat cassettes
114
* Northside PRY (not us, but knock effect to us)
115
116 24 Dobbs, Adam
h3. 9. AoB and summary of actions.
117 21 Dobbs, Adam
118 1 Dobbs, Adam
119
h2. Phone Details
120
121
* The four digit company id: 4673 (callers from outside the UK)
122
* The pin number: 419357
123
124
125
Phone numbers:
126
127
| UK (Imperial College --preferred) | 0845 545 4460 | English |
128
| Austria | 0820 4000 1503 | English |
129
| | 0820 4000 15 02 | German |
130
| Belgium | 070 35 99 45 | English |
131
| | 070 35 99 94 | Dutch |
132
| | 070 35 98 66 | French |
133
| Canada | 1 712 432 2832 | English |
134
| | 1 712 432 2844 | French |
135
| Germany | 01803 001 178 | English |
136
| | 01570 248 8303 | English (mobile) |
137
| | 01803 001 177 | German |
138
| | 01570 248 8101 | German (mobile) |
139
| Ireland | 0818 270 007 | English |
140
| Italy | 848 390 166 | English |
141
|  | 848 391 819 | Italian |
142
| Netherlands | 0870 001 901 | English |
143
|  | 0870 001 909 | Dutch |
144
| Poland | 0801 003 543 | English |
145
|  | 0801 003 533 | Polish |
146
| South Africa | 087 550 0375 | English |
147
| Spain | 902 885 318 | English |
148
|  | 902 881 200 | Spanish |
149
| Sweden | 0939 2066 400 | English |
150
|  | 0939 2066 300 | Swedish |
151
|Switzerland | 0848 560 190 | English |
152
|  | 0848 560 378 | French |
153
|  | 0848 560 347 | German |
154
|  | 0848 560 385 | Italian |
155
| United Kingdom (PowWowNow) | 0844 4 73 73 73 | English |
156
| United States | 1 415 363 0833  | English |