Project

General

Profile

Meeting 2014-05-14 » History » Version 20

Dobbs, Adam, 14 May 2014 15:55

1 1 Dobbs, Adam
h1. Meeting 2014-05-14
2
3
Date: 14th May 2014
4 3 Dobbs, Adam
Time: 15:00 BST
5 2 Dobbs, Adam
Apologies: D. Adey
6 7 Dobbs, Adam
Attendance: G. Barber, A. Dobbs, P. Kyberd, E. Overton, M. Uchida
7 1 Dobbs, Adam
8
h2. Agenda and Minutes
9
10
h3. 0. Actions
11
12
* Create MICE note of channel mappings end-to-end through hardware, electronics and software - DA
13
* Create comparison plots for channel mapping data - CH
14
* Check with KL and AB if we want to proceed with new  spare waveguides - MU
15 10 Dobbs, Adam
* -Place survey data on on tracker wiki - MU- _Done_
16 1 Dobbs, Adam
* Prepare for LED testing, make connectors - GB, KLs
17
* Order new LED pulser box - CM
18
19
h3. 1. Software: AD, ES, CH, ST
20
21
* Schedule - AD See http://micewww.pp.rl.ac.uk/attachments/download/2152.
22
23
h4. 1.1 Documentation - AD, ES, CH
24
25
* Base documentation - AD
26
* Digitisation - CH, ES
27
* Pattern Recognition - AD
28
* Track fit - ES
29
* MC - CH
30
* Geometry, CDB - CH
31
* Noise - CH
32
33
h4. 1.2 Geometry, Calibrations, Configurations, CDB - CH
34
35
* Helium windows not in geometry - CH
36
* Get CMM geometry data in to CDB - CH
37
* Translate CDB geometry xml into MiceModules format _Now able to pull down from CDB but still crashing when try to run sim with it_ - AD, CH
38
39
h4. 1.3 Monte Carlo
40
41
* MC Noise - CH
42
** Look at large cpu load
43
** Code review _Complete, need to keep track of actions at http://micewww.pp.rl.ac.uk/projects/maus/wiki/PC030213_
44
* ADC smearing needs fixing - CH
45
46
h4. 1.4 Online Displays - MU
47
48
h4. 1.5 Performance
49
50
* Spacepoint efficiency study - CH, AD
51 8 Dobbs, Adam
* Bias difference between trackers to be investigate - CH, AD _Possibly due to the asymmetric beta_
52 1 Dobbs, Adam
* Low pt performance - AD
53
54
h4. 1.6 Issues
55
56
* Final track fit - ES
57
** Deal with -ve charge
58 8 Dobbs, Adam
** -Track points to link back to clusters- _Done_
59
** -Station numbering bug fixed in tracker branch, merge to trunk- _Done_
60 1 Dobbs, Adam
* Pattern Recognition - AD
61 8 Dobbs, Adam
** -NaNs for some track parameters now fixed in tracker branch, merge to trunk- _Done_
62 1 Dobbs, Adam
63
h3. 2. DAQ/Calibration/Controls - DA, EO
64
65 12 Dobbs, Adam
* DA to give his requirements for the Hall and the tracker lab, in particular with respect to the Integration Schedule (MU to email)
66 11 Dobbs, Adam
67 1 Dobbs, Adam
h4. 2.1 MiniDAQ - DA
68
69
h4. 2.2 Channel Mappings
70
71
* Check our channel mapping from end to end and make sure correct - DA, AD, ES, CH
72
* Dig up the old documentation for the electronics channel mapping - DA
73
74
h4. 2.3 Controls
75
76
* Create controls system - DA
77
78
h4. 2.4 Hall Probes - MU
79
80 9 Dobbs, Adam
* -Hall probe readout - ensure this is sorted before tracker placed in bore- PH, MU- _Done_
81 1 Dobbs, Adam
82
h3. 3. LED: EO
83
84 14 Dobbs, Adam
* Finished second pulser box - CM
85
* Polish fibre ends - CM
86 1 Dobbs, Adam
* Make documentation mapping LEDs to areas of tracker illuminated - EO
87 14 Dobbs, Adam
* Provide documnetation to Maurizio about whether it would be helpful to fit LED into TOF to help our timing - EO 
88 1 Dobbs, Adam
89
h3. 4. Tracker lab - AB, GB, CM
90
91 17 Dobbs, Adam
* Set up cryostat test system - CM
92 1 Dobbs, Adam
93
h3. 5. Installation
94
95
* -Tracker integrity during transport from R9 to Hall - add accelerometer - MU- SS2 now in MICE Hall
96
* Survey data 
97 10 Dobbs, Adam
** -Store data sensibly (tracker wiki for now) - MU- _Done_
98 1 Dobbs, Adam
** Survey of phi needs to be done by John Pallin - GB
99
* -Finish installation manual - GB, MU-
100
* External waveguides
101
** New connectors - GB 
102
** -Check with KL and AB if we want to proceed - MU-
103
** Need to QA the external waveguides somehow - MU
104
105
h3. 6. Services in the MICE hall: CM
106
107
* Backing vacuum line system - CM
108
109
h3. 7. Step IV Readiness - MU
110
111
* Tracker alignment - MU
112 20 Dobbs, Adam
* Integration Schedule
113
** Current schedule at document#85 - timetable still subject to change (constraints from AFC, etc)
114
** Add resource loading? - CM
115
** Merge with main MICE schedule - CM _Had meeting with KL, RP, AG_
116 19 Dobbs, Adam
117
h3. 8. AoB and summary of actions. 
118 1 Dobbs, Adam
119
h2. Phone Details
120
121
* The four digit company id: 4673 (callers from outside the UK)
122
* The pin number: 419357
123
124
125
Phone numbers:
126
127
| UK (Imperial College --preferred) | 0845 545 4460 | English |
128
| Austria | 0820 4000 1503 | English |
129
| | 0820 4000 15 02 | German |
130
| Belgium | 070 35 99 45 | English |
131
| | 070 35 99 94 | Dutch |
132
| | 070 35 98 66 | French |
133
| Canada | 1 712 432 2832 | English |
134
| | 1 712 432 2844 | French |
135
| Germany | 01803 001 178 | English |
136
| | 01570 248 8303 | English (mobile) |
137
| | 01803 001 177 | German |
138
| | 01570 248 8101 | German (mobile) |
139
| Ireland | 0818 270 007 | English |
140
| Italy | 848 390 166 | English |
141
|  | 848 391 819 | Italian |
142
| Netherlands | 0870 001 901 | English |
143
|  | 0870 001 909 | Dutch |
144
| Poland | 0801 003 543 | English |
145
|  | 0801 003 533 | Polish |
146
| South Africa | 087 550 0375 | English |
147
| Spain | 902 885 318 | English |
148
|  | 902 881 200 | Spanish |
149
| Sweden | 0939 2066 400 | English |
150
|  | 0939 2066 300 | Swedish |
151
|Switzerland | 0848 560 190 | English |
152
|  | 0848 560 378 | French |
153
|  | 0848 560 347 | German |
154
|  | 0848 560 385 | Italian |
155
| United Kingdom (PowWowNow) | 0844 4 73 73 73 | English |
156
| United States | 1 415 363 0833  | English |