Actions
Meeting 2014-01-29¶
Date: 29th January 2014
Time: 15:00 GMT
Attendance: D. Adey, G. Barber, A. Dobbs, R. Gamet, C. Heidt, E. Santos, M. A. Uchida
Apologies: P. Kyberd
Agenda and Minutes¶
0. Actions¶
- Create MICE note of channel mappings end-to-end through hardware, electronics and software - DA
- Dig up the old documentation for the electronics channel mapping - DA
- Create comparison plots for channel mapping data - CH
- Visit AC Precision to make the new connectors for PP end of waveguides - GB
- Move cryostat back to tracker lab - CM
- Obtain survey data and place on tracker wiki - MU, DA
Doodle poll on tracker meeting time- AD
1. DAQ/Calibration/Controls - DA, EO¶
1.1 MiniDAQ - DA¶
1.2 Channel Mappings¶
- Check our channel mapping from end to end and make sure correct - DA, AD, ES, CH
- Dig up the old documentation for the electronics channel mapping - DA
1.3 Controls¶
- Create controls system - DA
2. LED: EO¶
- Finish main flasher unit - EO, CMacW
- Make documentation mapping LEDs to areas of tracker illuminated - EO
- Ask KL, AB, DA about whether it would be helpful to fit LED into TOF to help our timing - EO
3. Tracker lab - AB, GB, CM¶
- CM wants to use tracker lab to store tracker equipment currently spread around RAL
- Move cryostat to go back to tracker lab. - CM
4. Installation¶
- Build tent in R9 - GB Tent started, now waiting on getting a model pushed through the bore, to check clearances
- Survey data
- Need to obtain survey data from M. Leonova - MU
- Store data sensibly (tracker wiki for now) - MU
- Survey of phi needs to be done by John Pallin - GB
- Finish installation manual - GB, AD
- External waveguides
- Visit AC Precision to make the new connectors for PP end of waveguides - GB
- Need to QA the external waveguides somehow - MU
5. Services in the MICE hall: CM¶
6. Mitigation of effect of magnetic field: CM, MU¶
7. Step IV Readiness - MU¶
8. Software: AD, ES, CH, ST¶
- Milestones - AD See Software Schedule.
- Documentation - AD, ES, CH See maus_user_guide.pdf for latest updates
- Base documentation - AD
- Digitisation - CH, ES
- Pattern Recognition - AD
- Track fit - ES
- MC - CH
- Geometry, CDB - CH
- Noise - CH
- Geometry, Calibrations, Configurations, CDB - CH
- Get CMM geometry data in to CDB
- Translate CDB geometry xml into MiceModules format
- MC Noise - CH
- Look at large cpu load
- Discuss with DA
- Code review
- Final track fit
- Deal with -ve charge
- Hits to digits lookup - CH
- Code review
- Spacepoint efficiency study - C. Hunt, AD
9. Conferences: DA, AB, KL¶
- CHEP (AD) - Paper accepted
10. AoB and summary of actions.¶
- Next phone meeting 15:00 GMT, 5th Feb 14
Phone Details¶
- The four digit company id: 4673 (callers from outside the UK)
- The pin number: 419357
Phone numbers:
UK (Imperial College --preferred) | 0845 545 4460 | English |
Austria | 0820 4000 1503 | English |
0820 4000 15 02 | German | |
Belgium | 070 35 99 45 | English |
070 35 99 94 | Dutch | |
070 35 98 66 | French | |
Canada | 1 712 432 2832 | English |
1 712 432 2844 | French | |
Germany | 01803 001 178 | English |
01570 248 8303 | English (mobile) | |
01803 001 177 | German | |
01570 248 8101 | German (mobile) | |
Ireland | 0818 270 007 | English |
Italy | 848 390 166 | English |
848 391 819 | Italian | |
Netherlands | 0870 001 901 | English |
0870 001 909 | Dutch | |
Poland | 0801 003 543 | English |
0801 003 533 | Polish | |
South Africa | 087 550 0375 | English |
Spain | 902 885 318 | English |
902 881 200 | Spanish | |
Sweden | 0939 2066 400 | English |
0939 2066 300 | Swedish | |
Switzerland | 0848 560 190 | English |
0848 560 378 | French | |
0848 560 347 | German | |
0848 560 385 | Italian | |
United Kingdom (PowWowNow) | 0844 4 73 73 73 | English |
United States | 1 415 363 0833 | English |
Updated by Dobbs, Adam over 9 years ago · 10 revisions