Project

General

Profile

Actions

Meeting 2013-12-16 » History » Revision 3

« Previous | Revision 3/4 (diff) | Next »
MacWaters, Craig , 16 December 2013 16:00


Meeting 2013-12-16

Date: 16th December 2013
Time: 16:00 GMT

Agenda and Minutes

0. Actions

  • Create MICE note of channel mappings end-to-end through hardware, electronics and software - DA
  • Dig up the old documentation for the electronics channel mapping - DA
  • Ask KL, AB, DA about whether it would be helpful to fit LED into TOF to help our timing - EO
  • Hits to digits lookup - CH
  • Create comparison plots for channel mapping data - CH
  • Set up external waveguide meeting - AD

1. Tracker lab - AB, GB, CMacW

  • Electronics operations shifted to Fermilab while DA is there
  • CMacW wants to use lab to store tracker equipment currently spread around RAL

2. LED: EO

  • Make PCB for main flasher unit buffer - EO _Built by CMacW
  • Finish main flasher unit - EO, CMacW
  • Ask KL, AB, DA about whether it would be helpful to fit LED into TOF to help our timing. EO

3. Installation

  • Finish installation manual - GB
  • Construct safety procedures for performing installing while AFC also operating - AN, AD
  • Perform metrology on solenoid bore to check clearances, GB talk to John Palin - GB
  • Construct dark room tent in R9 - GB, KLs
  • AFC2 has flaws, needs to go back to Tesla, so need to leave darkroom tent down until AFC2 is moved out of R9, probably early next week

4. DAQ/Calibration/Controls: DA, EO

4.1 MiniDAQ

  • MiniDAQ (separate from DATE) now done and tested on set up in tracker lab - DA
  • Needs to be committed to the DAQ repository
  • Still needs a full integration test with main MICE DAQ

4.2 Channel Mappings

  • Check our channel mapping from end to end and make sure correct - DA, AD, ES, CH
  • Dig up the old documentation for the electronics channel mapping - DA

4.3 Controls

  • Create controls system - DA Responsibility moving solely to DA at present

5. Services in the MICE hall: CMacW

6. Mitigation of effect of magnetic field: CMacW, MG

  • Need to consider how we will route the waveguides through the yoke (non-trivial) - CMacW
  • Manufacture of new spare waveguides - GB, AB, AD - Set up meeting between KL, AB, AD, GB to discuss

7. Step IV Readiness - MU

7. Software: AD, ES, CH, ST

  • Milestones - AD See Software Schedule.
  • MC Noise - CH
    • Look at large cpu load
    • Discuss with DA
    • Code review
  • Hits to digits lookup - CH
    • Organise meeting with C. Hunt and start using it for spacepoint efficiency study
    • Code review

8. Conferences: DA, AB, KL

  • CHEP (AD) - Paper submitted

9. AoB and summary of actions.

  • Next phone meeting 16:00 GMT, 6th Jan 14

Phone Details

  • The four digit company id: 4673 (callers from outside the UK)
  • The pin number: 419357

Phone numbers:

| UK (Imperial College --preferred) | 0845 545 4460 | English | | Austria | 0820 4000 1503 | English | | | 0820 4000 15 02 | German | | Belgium | 070 35 99 45 | English | | | 070 35 99 94 | Dutch | | | 070 35 98 66 | French | | Canada | 1 712 432 2832 | English | | | 1 712 432 2844 | French | | Germany | 01803 001 178 | English | | | 01570 248 8303 | English (mobile) | | | 01803 001 177 | German | | | 01570 248 8101 | German (mobile) | | Ireland | 0818 270 007 | English | | Italy | 848 390 166 | English | | | 848 391 819 | Italian | | Netherlands | 0870 001 901 | English | | | 0870 001 909 | Dutch | | Poland | 0801 003 543 | English | | | 0801 003 533 | Polish | | South Africa | 087 550 0375 | English | | Spain | 902 885 318 | English | | | 902 881 200 | Spanish | | Sweden | 0939 2066 400 | English | | | 0939 2066 300 | Swedish | |Switzerland | 0848 560 190 | English | | | 0848 560 378 | French | | | 0848 560 347 | German | | | 0848 560 385 | Italian | | United Kingdom (PowWowNow) | 0844 4 73 73 73 | English | | United States | 1 415 363 0833 | English |
!!

Updated by MacWaters, Craig about 10 years ago · 3 revisions