Actions
Meeting 2013-12-16¶
Date: 16th December 2013
Time: 16:00 GMT
Agenda and Minutes¶
0. Actions¶
- Create MICE note of channel mappings end-to-end through hardware, electronics and software - DA
- Dig up the old documentation for the electronics channel mapping - DA
- Ask KL, AB, DA about whether it would be helpful to fit LED into TOF to help our timing - EO
- Hits to digits lookup - CH
- Create comparison plots for channel mapping data - CH
- Set up external waveguide meeting - AD
1. Tracker lab - AB, GB, CMacW¶
- Electronics operations shifted to Fermilab while DA is there
- CMacW wants to use lab to store tracker equipment currently spread around RAL
2. LED: EO¶
- Make PCB for main flasher unit buffer - EO _Built by CMacW
- Finish main flasher unit - EO, CMacW
- Ask KL, AB, DA about whether it would be helpful to fit LED into TOF to help our timing. EO
3. Installation¶
- Finish installation manual - GB
- Construct safety procedures for performing installing while AFC also operating - AN, AD
- Perform metrology on solenoid bore to check clearances, GB talk to John Palin - GB
- Construct dark room tent in R9 - GB, KLs
- AFC2 has flaws, needs to go back to Tesla, so need to leave darkroom tent down until AFC2 is moved out of R9, probably early next week
4. DAQ/Calibration/Controls: DA, EO¶
4.1 MiniDAQ¶
- MiniDAQ (separate from DATE) now done and tested on set up in tracker lab - DA
- Needs to be committed to the DAQ repository
- Still needs a full integration test with main MICE DAQ
4.2 Channel Mappings¶
- Check our channel mapping from end to end and make sure correct - DA, AD, ES, CH
- Dig up the old documentation for the electronics channel mapping - DA
4.3 Controls¶
- Create controls system - DA Responsibility moving solely to DA at present
5. Services in the MICE hall: CMacW¶
6. Mitigation of effect of magnetic field: CMacW, MG¶
- Need to consider how we will route the waveguides through the yoke (non-trivial) - CMacW
- Manufacture of new spare waveguides - GB, AB, AD - Set up meeting between KL, AB, AD, GB to discuss
7. Step IV Readiness - MU¶
7. Software: AD, ES, CH, ST¶
- Milestones - AD See Software Schedule.
- MC Noise - CH
- Look at large cpu load
- Discuss with DA
- Code review
- Hits to digits lookup - CH
- Organise meeting with C. Hunt and start using it for spacepoint efficiency study
- Code review
8. Conferences: DA, AB, KL¶
- CHEP (AD) - Paper submitted
9. AoB and summary of actions.¶
- Next phone meeting 16:00 GMT, 6th Jan 14
Phone Details¶
- The four digit company id: 4673 (callers from outside the UK)
- The pin number: 419357
Phone Details¶
- The four digit company id: 4673 (callers from outside the UK)
- The pin number: 419357
Phone numbers:
UK (Imperial College --preferred) | 0845 545 4460 | English |
Austria | 0820 4000 1503 | English |
0820 4000 15 02 | German | |
Belgium | 070 35 99 45 | English |
070 35 99 94 | Dutch | |
070 35 98 66 | French | |
Canada | 1 712 432 2832 | English |
1 712 432 2844 | French | |
Germany | 01803 001 178 | English |
01570 248 8303 | English (mobile) | |
01803 001 177 | German | |
01570 248 8101 | German (mobile) | |
Ireland | 0818 270 007 | English |
Italy | 848 390 166 | English |
848 391 819 | Italian | |
Netherlands | 0870 001 901 | English |
0870 001 909 | Dutch | |
Poland | 0801 003 543 | English |
0801 003 533 | Polish | |
South Africa | 087 550 0375 | English |
Spain | 902 885 318 | English |
902 881 200 | Spanish | |
Sweden | 0939 2066 400 | English |
0939 2066 300 | Swedish | |
Switzerland | 0848 560 190 | English |
0848 560 378 | French | |
0848 560 347 | German | |
0848 560 385 | Italian | |
United Kingdom (PowWowNow) | 0844 4 73 73 73 | English |
United States | 1 415 363 0833 | English |
Updated by Dobbs, Adam over 9 years ago · 4 revisions