Project

General

Profile

Actions

Meeting 2013-11-18 » History » Revision 7

« Previous | Revision 7/13 (diff) | Next »
Dobbs, Adam, 18 November 2013 16:07


Meeting 2013-11-18

Date: 18th November 2013
Time: 16:00 GMT
Attendance: D. Adey, A. Dobbs, R. Gamet, M. George, P. Kyberd, C. MacWaters, E. Overton
Apologies: G. Barber

Agenda and Minutes

0. Actions

  • Sort out channel/plane naming conventions in hardware and software. GB, AD, ES (see the review at http://micewww.pp.rl.ac.uk/documents/70)
  • Dig up the old documentation for the electronics channel mapping - DA
  • Ask KL, AB, DA about whether it would be helpful to fit LED into TOF to help our timing. EO
  • Hits to digits lookup. CH
  • AD to ask AN if working just outside 300 Gauss line would be enough? - AD

1. Tracker lab - AB, GB, CMacW

2. LED: EO

  • Make PCB for main flasher unit buffer - EO
  • Finish main flasher unit - EO, CMacW
  • Ask KL, AB, DA about whether it would be helpful to fit LED into TOF to help our timing. EO
    • EO talked to Maurizio, Maurizio concerned about extra light levels, EO will produce a document for him.

3. Installation

  • Finish installation manual - GB
  • Construct safety procedures for performing installing while AFC also operating - AN, AD
    • AD to ask AN if working just outside 300 Gauss line would be enough? - AD
  • Set up installation meeting with hall people, tracker people, diffuser people - GB The Installation meeting will be tomorrow (19/11) at 13:30 in R9, RAL
  • Perform metrology on solenoid bore to check clearances, GB talk to John Palin - GB
  • Construct dark room tent in R9 - GB, KLs

4. DAQ/Calibration/Controls: DA, EO

  • MiniDAQ (separate from DATE) now done and tested on set up in tracker lab - DA
    • Needs to be committed to the DAQ repository
    • Still needs a full integration test with main MICE DAQ
  • Check our channel mapping from end to end and make sure correct - DA, AD, ES
  • Create controls system - DA, MR

5. Services in the MICE hall: CMacW

6. Mitigation of effect of magnetic field: CMacW, MG

  • Need to consider how we will route the waveguides through the yoke (non-trivial) - CMacW

7. Software: AD, ES, CH, ST

  • Milestones: AD

See Software Schedule.

8. Conferences: DA, AB, KL

  • CHEP (AD) - Paper submitted

9. AoB and summary of actions.

  • T1 installation meeting 13:30 GMT, 19th Nov 13, in R9 RAL
  • Next phone meeting 16:00 GMT, 25th Nov 13

Phone Details

  • The four digit company id: 4673 (callers from outside the UK)
  • The pin number: 419357

Phone numbers:

UK (Imperial College --preferred) 0845 545 4460 English
Austria 0820 4000 1503 English
0820 4000 15 02 German
Belgium 070 35 99 45 English
070 35 99 94 Dutch
070 35 98 66 French
Canada 1 712 432 2832 English
1 712 432 2844 French
Germany 01803 001 178 English
01570 248 8303 English (mobile)
01803 001 177 German
01570 248 8101 German (mobile)
Ireland 0818 270 007 English
Italy 848 390 166 English
848 391 819 Italian
Netherlands 0870 001 901 English
0870 001 909 Dutch
Poland 0801 003 543 English
0801 003 533 Polish
South Africa 087 550 0375 English
Spain 902 885 318 English
902 881 200 Spanish
Sweden 0939 2066 400 English
0939 2066 300 Swedish
Switzerland 0848 560 190 English
0848 560 378 French
0848 560 347 German
0848 560 385 Italian
United Kingdom (PowWowNow) 0844 4 73 73 73 English
United States 1 415 363 0833 English

Updated by Dobbs, Adam about 10 years ago · 7 revisions