Project

General

Profile

Meeting 2013-11-18 » History » Version 3

Dobbs, Adam, 18 November 2013 12:49

1 1 Dobbs, Adam
h1. Meeting 2013-11-18
2
3
Date: 18th November 2013
4
Time: 16:00 GMT
5
6
h2. Agenda and Minutes
7
8
h3. Actions
9
10
* Sort out channel/plane naming conventions in hardware and software. GB, AD, ES (see the review at http://micewww.pp.rl.ac.uk/documents/70)
11
* Dig up the old documentation for the electronics channel mapping - DA
12
* Ask KL, AB, DA about whether it would be helpful to fit LED into TOF to help our timing. EO 
13
* Hits to digits lookup. CH
14
* AD to ask AN if working just outside 300 Gauss line would be enough? - AD
15
16
h3.  Tracker lab - AB, GB, CMacW
17
18
h3. LED: EO
19
20
* Make PCB for main flasher unit buffer - EO
21
* Finish main flasher unit - EO, CMacW
22
* Ask KL, AB, DA about whether it would be helpful to fit LED into TOF to help our timing. EO 
23
** EO talked to Maurizio, Maurizio concerned about extra light levels, EO will produce a document for him.
24
25
h3. Installation
26
27
* Finish installation manual - GB
28
* Construct safety procedures for performing installing while AFC also operating - AN, AD
29
** AD to ask AN if working just outside 300 Gauss line would be enough? - AD
30 3 Dobbs, Adam
* -Set up installation meeting with hall people, tracker people, diffuser people - GB- The Installation meeting will be tomorrow (19/11) at 13:30 in R9, RAL
31 1 Dobbs, Adam
* Perform metrology on solenoid bore to check clearances, GB talk to John Palin - GB
32
* Construct dark room tent in R9 - GB, KLs
33
34
h3. DAQ/Calibration/Controls: DA, EO
35
36
* MiniDAQ (separate from DATE) now done and tested on set up in tracker lab - DA
37
** Needs to be committed to the DAQ repository
38
** Still needs a full integration test with main MICE DAQ
39
* Check our channel mapping from end to end and make sure correct - DA, AD, ES
40 3 Dobbs, Adam
** Dig up the old documentation for the electronics channel mapping - DA See http://micewww.pp.rl.ac.uk/documents/75
41 1 Dobbs, Adam
* Create controls system - DA, MR
42
43
44
h3. Services in the MICE hall: CMacW
45
46
h3. Mitigation of effect of magnetic field: CMacW, MG
47
48
* Need to consider how we will route the waveguides through the yoke (non-trivial) - CMacW
49
50
h3. Software: AD, ES, CH, ST
51
52
* Milestones: AD 
53
54 2 Dobbs, Adam
See [[SoftwareSchedule|Software Schedule]].
55 1 Dobbs, Adam
56
h3. Conferences: DA, AB, KL
57
58
* CHEP (AD) - Paper submitted
59
60
h3. AoB and summary of actions. 
61
62 3 Dobbs, Adam
* T1 installation meeting 13:30 GMT, 19th Nov 13, in R9 RAL
63
* Next phone meeting 16:00 GMT, 25th Nov 13
64 1 Dobbs, Adam
65
h2. Phone Details
66
67
* The four digit company id: 4673 (callers from outside the UK)
68
* The pin number: 419357
69
70
Phone numbers:
71
72
| UK (Imperial College --preferred) | 0845 545 4460 | English |
73
| Austria | 0820 4000 1503 | English |
74
| | 0820 4000 15 02 | German |
75
| Belgium | 070 35 99 45 | English |
76
| | 070 35 99 94 | Dutch |
77
| | 070 35 98 66 | French |
78
| Canada | 1 712 432 2832 | English |
79
| | 1 712 432 2844 | French |
80
| Germany | 01803 001 178 | English |
81
| | 01570 248 8303 | English (mobile) |
82
| | 01803 001 177 | German |
83
| | 01570 248 8101 | German (mobile) |
84
| Ireland | 0818 270 007 | English |
85
| Italy | 848 390 166 | English |
86
|  | 848 391 819 | Italian |
87
| Netherlands | 0870 001 901 | English |
88
|  | 0870 001 909 | Dutch |
89
| Poland | 0801 003 543 | English |
90
|  | 0801 003 533 | Polish |
91
| South Africa | 087 550 0375 | English |
92
| Spain | 902 885 318 | English |
93
|  | 902 881 200 | Spanish |
94
| Sweden | 0939 2066 400 | English |
95
|  | 0939 2066 300 | Swedish |
96
|Switzerland | 0848 560 190 | English |
97
|  | 0848 560 378 | French |
98
|  | 0848 560 347 | German |
99
|  | 0848 560 385 | Italian |
100
| United Kingdom (PowWowNow) | 0844 4 73 73 73 | English |
101
| United States | 1 415 363 0833  | English |