Project

General

Profile

Meeting 2013-11-18 » History » Version 13

Dobbs, Adam, 18 November 2013 16:43

1 1 Dobbs, Adam
h1. Meeting 2013-11-18
2
3
Date: 18th November 2013
4
Time: 16:00 GMT
5
Attendance: D. Adey, A. Dobbs, R. Gamet, M. George, P. Kyberd, C. MacWaters, E. Overton
6 7 Dobbs, Adam
Apologies: G. Barber
7
8 1 Dobbs, Adam
9
h2. Agenda and Minutes
10
11 5 Dobbs, Adam
h3. 0. Actions
12 1 Dobbs, Adam
13 11 Dobbs, Adam
* Create MICE note of channel mappings end-to-end through hardware, electronics and software. DA, ES, AD, GB (see the review at http://micewww.pp.rl.ac.uk/documents/70)
14 1 Dobbs, Adam
* Dig up the old documentation for the electronics channel mapping - DA
15
* Ask KL, AB, DA about whether it would be helpful to fit LED into TOF to help our timing. EO 
16
* Hits to digits lookup. CH
17
* AD to ask AN if working just outside 300 Gauss line would be enough? - AD
18
19 5 Dobbs, Adam
h3.  1. Tracker lab - AB, GB, CMacW
20 1 Dobbs, Adam
21 10 Dobbs, Adam
* Electronics operations shifted to Fermilab while DA is there
22
23 5 Dobbs, Adam
h3. 2. LED: EO
24 1 Dobbs, Adam
25
* Make PCB for main flasher unit buffer - EO
26
* Finish main flasher unit - EO, CMacW
27
* Ask KL, AB, DA about whether it would be helpful to fit LED into TOF to help our timing. EO 
28
** EO talked to Maurizio, Maurizio concerned about extra light levels, EO will produce a document for him.
29
30 5 Dobbs, Adam
h3. 3. Installation
31 1 Dobbs, Adam
32
* Finish installation manual - GB
33
* Construct safety procedures for performing installing while AFC also operating - AN, AD
34
** AD to ask AN if working just outside 300 Gauss line would be enough? - AD
35 3 Dobbs, Adam
* -Set up installation meeting with hall people, tracker people, diffuser people - GB- The Installation meeting will be tomorrow (19/11) at 13:30 in R9, RAL
36 1 Dobbs, Adam
* Perform metrology on solenoid bore to check clearances, GB talk to John Palin - GB
37
* Construct dark room tent in R9 - GB, KLs
38 13 Dobbs, Adam
* See slides on external waveguide work in the Hall by C. MacW: attachment:LEDandWaveguides.pdf
39 1 Dobbs, Adam
40 5 Dobbs, Adam
h3. 4. DAQ/Calibration/Controls: DA, EO
41 1 Dobbs, Adam
42 10 Dobbs, Adam
h4. 4.1 MiniDAQ
43
44 1 Dobbs, Adam
* MiniDAQ (separate from DATE) now done and tested on set up in tracker lab - DA
45 10 Dobbs, Adam
* Needs to be committed to the DAQ repository
46
* Still needs a full integration test with main MICE DAQ
47
48
h4. 4.2 Channel Mappings
49
50 1 Dobbs, Adam
* Check our channel mapping from end to end and make sure correct - DA, AD, ES
51 10 Dobbs, Adam
* Dig up the old documentation for the electronics channel mapping - DA See http://micewww.pp.rl.ac.uk/documents/75 by M. Ellis, derived from D0 note not yet found
52
*  M. Ellis (via P. Kyberd) says it was definitely correct in 2009 in G4MICE) - so, was it correctly translated into MAUS? - ES
53 1 Dobbs, Adam
54 10 Dobbs, Adam
h4. 4.3 Controls
55
56
* Create controls system - DA, MR
57 5 Dobbs, Adam
58 1 Dobbs, Adam
h3. 5. Services in the MICE hall: CMacW
59
60
h3. 6. Mitigation of effect of magnetic field: CMacW, MG
61 5 Dobbs, Adam
62 1 Dobbs, Adam
* Need to consider how we will route the waveguides through the yoke (non-trivial) - CMacW
63
64
h3. 7. Software: AD, ES, CH, ST
65 2 Dobbs, Adam
66 1 Dobbs, Adam
* Milestones: AD 
67 5 Dobbs, Adam
68 1 Dobbs, Adam
See [[SoftwareSchedule|Software Schedule]].
69
70
h3. 8. Conferences: DA, AB, KL
71 5 Dobbs, Adam
72 1 Dobbs, Adam
* CHEP (AD) - Paper submitted
73 3 Dobbs, Adam
74
h3. 9. AoB and summary of actions. 
75 1 Dobbs, Adam
76
* T1 installation meeting 13:30 GMT, 19th Nov 13, in R9 RAL
77
* Next phone meeting 16:00 GMT, 25th Nov 13
78
79
h2. Phone Details
80
81
* The four digit company id: 4673 (callers from outside the UK)
82
* The pin number: 419357
83
84
Phone numbers:
85
86
| UK (Imperial College --preferred) | 0845 545 4460 | English |
87
| Austria | 0820 4000 1503 | English |
88
| | 0820 4000 15 02 | German |
89
| Belgium | 070 35 99 45 | English |
90
| | 070 35 99 94 | Dutch |
91
| | 070 35 98 66 | French |
92
| Canada | 1 712 432 2832 | English |
93
| | 1 712 432 2844 | French |
94
| Germany | 01803 001 178 | English |
95
| | 01570 248 8303 | English (mobile) |
96
| | 01803 001 177 | German |
97
| | 01570 248 8101 | German (mobile) |
98
| Ireland | 0818 270 007 | English |
99
| Italy | 848 390 166 | English |
100
|  | 848 391 819 | Italian |
101
| Netherlands | 0870 001 901 | English |
102
|  | 0870 001 909 | Dutch |
103
| Poland | 0801 003 543 | English |
104
|  | 0801 003 533 | Polish |
105
| South Africa | 087 550 0375 | English |
106
| Spain | 902 885 318 | English |
107
|  | 902 881 200 | Spanish |
108
| Sweden | 0939 2066 400 | English |
109
|  | 0939 2066 300 | Swedish |
110
|Switzerland | 0848 560 190 | English |
111
|  | 0848 560 378 | French |
112
|  | 0848 560 347 | German |
113
|  | 0848 560 385 | Italian |
114
| United Kingdom (PowWowNow) | 0844 4 73 73 73 | English |
115
| United States | 1 415 363 0833  | English |