Meeting 2013-11-18 » History » Version 10
Dobbs, Adam, 18 November 2013 16:19
1 | 1 | Dobbs, Adam | h1. Meeting 2013-11-18 |
---|---|---|---|
2 | |||
3 | Date: 18th November 2013 |
||
4 | Time: 16:00 GMT |
||
5 | Attendance: D. Adey, A. Dobbs, R. Gamet, M. George, P. Kyberd, C. MacWaters, E. Overton |
||
6 | 7 | Dobbs, Adam | Apologies: G. Barber |
7 | |||
8 | 1 | Dobbs, Adam | |
9 | h2. Agenda and Minutes |
||
10 | |||
11 | 5 | Dobbs, Adam | h3. 0. Actions |
12 | 1 | Dobbs, Adam | |
13 | * Sort out channel/plane naming conventions in hardware and software. GB, AD, ES (see the review at http://micewww.pp.rl.ac.uk/documents/70) |
||
14 | * Dig up the old documentation for the electronics channel mapping - DA |
||
15 | * Ask KL, AB, DA about whether it would be helpful to fit LED into TOF to help our timing. EO |
||
16 | * Hits to digits lookup. CH |
||
17 | * AD to ask AN if working just outside 300 Gauss line would be enough? - AD |
||
18 | |||
19 | 5 | Dobbs, Adam | h3. 1. Tracker lab - AB, GB, CMacW |
20 | 1 | Dobbs, Adam | |
21 | 10 | Dobbs, Adam | * Electronics operations shifted to Fermilab while DA is there |
22 | |||
23 | 5 | Dobbs, Adam | h3. 2. LED: EO |
24 | 1 | Dobbs, Adam | |
25 | * Make PCB for main flasher unit buffer - EO |
||
26 | * Finish main flasher unit - EO, CMacW |
||
27 | * Ask KL, AB, DA about whether it would be helpful to fit LED into TOF to help our timing. EO |
||
28 | ** EO talked to Maurizio, Maurizio concerned about extra light levels, EO will produce a document for him. |
||
29 | |||
30 | 5 | Dobbs, Adam | h3. 3. Installation |
31 | 1 | Dobbs, Adam | |
32 | * Finish installation manual - GB |
||
33 | * Construct safety procedures for performing installing while AFC also operating - AN, AD |
||
34 | ** AD to ask AN if working just outside 300 Gauss line would be enough? - AD |
||
35 | 3 | Dobbs, Adam | * -Set up installation meeting with hall people, tracker people, diffuser people - GB- The Installation meeting will be tomorrow (19/11) at 13:30 in R9, RAL |
36 | 1 | Dobbs, Adam | * Perform metrology on solenoid bore to check clearances, GB talk to John Palin - GB |
37 | * Construct dark room tent in R9 - GB, KLs |
||
38 | |||
39 | 5 | Dobbs, Adam | h3. 4. DAQ/Calibration/Controls: DA, EO |
40 | 1 | Dobbs, Adam | |
41 | 10 | Dobbs, Adam | h4. 4.1 MiniDAQ |
42 | |||
43 | 1 | Dobbs, Adam | * MiniDAQ (separate from DATE) now done and tested on set up in tracker lab - DA |
44 | 10 | Dobbs, Adam | * Needs to be committed to the DAQ repository |
45 | * Still needs a full integration test with main MICE DAQ |
||
46 | |||
47 | h4. 4.2 Channel Mappings |
||
48 | |||
49 | 1 | Dobbs, Adam | * Check our channel mapping from end to end and make sure correct - DA, AD, ES |
50 | 10 | Dobbs, Adam | * Dig up the old documentation for the electronics channel mapping - DA See http://micewww.pp.rl.ac.uk/documents/75 by M. Ellis, derived from D0 note not yet found |
51 | * M. Ellis (via P. Kyberd) says it was definitely correct in 2009 in G4MICE) - so, was it correctly translated into MAUS? - ES |
||
52 | 1 | Dobbs, Adam | |
53 | 10 | Dobbs, Adam | h4. 4.3 Controls |
54 | |||
55 | * Create controls system - DA, MR |
||
56 | 5 | Dobbs, Adam | |
57 | 1 | Dobbs, Adam | h3. 5. Services in the MICE hall: CMacW |
58 | |||
59 | h3. 6. Mitigation of effect of magnetic field: CMacW, MG |
||
60 | 5 | Dobbs, Adam | |
61 | 1 | Dobbs, Adam | * Need to consider how we will route the waveguides through the yoke (non-trivial) - CMacW |
62 | |||
63 | h3. 7. Software: AD, ES, CH, ST |
||
64 | 2 | Dobbs, Adam | |
65 | 1 | Dobbs, Adam | * Milestones: AD |
66 | 5 | Dobbs, Adam | |
67 | 1 | Dobbs, Adam | See [[SoftwareSchedule|Software Schedule]]. |
68 | |||
69 | h3. 8. Conferences: DA, AB, KL |
||
70 | 5 | Dobbs, Adam | |
71 | 1 | Dobbs, Adam | * CHEP (AD) - Paper submitted |
72 | 3 | Dobbs, Adam | |
73 | h3. 9. AoB and summary of actions. |
||
74 | 1 | Dobbs, Adam | |
75 | * T1 installation meeting 13:30 GMT, 19th Nov 13, in R9 RAL |
||
76 | * Next phone meeting 16:00 GMT, 25th Nov 13 |
||
77 | |||
78 | h2. Phone Details |
||
79 | |||
80 | * The four digit company id: 4673 (callers from outside the UK) |
||
81 | * The pin number: 419357 |
||
82 | |||
83 | Phone numbers: |
||
84 | |||
85 | | UK (Imperial College --preferred) | 0845 545 4460 | English | |
||
86 | | Austria | 0820 4000 1503 | English | |
||
87 | | | 0820 4000 15 02 | German | |
||
88 | | Belgium | 070 35 99 45 | English | |
||
89 | | | 070 35 99 94 | Dutch | |
||
90 | | | 070 35 98 66 | French | |
||
91 | | Canada | 1 712 432 2832 | English | |
||
92 | | | 1 712 432 2844 | French | |
||
93 | | Germany | 01803 001 178 | English | |
||
94 | | | 01570 248 8303 | English (mobile) | |
||
95 | | | 01803 001 177 | German | |
||
96 | | | 01570 248 8101 | German (mobile) | |
||
97 | | Ireland | 0818 270 007 | English | |
||
98 | | Italy | 848 390 166 | English | |
||
99 | | | 848 391 819 | Italian | |
||
100 | | Netherlands | 0870 001 901 | English | |
||
101 | | | 0870 001 909 | Dutch | |
||
102 | | Poland | 0801 003 543 | English | |
||
103 | | | 0801 003 533 | Polish | |
||
104 | | South Africa | 087 550 0375 | English | |
||
105 | | Spain | 902 885 318 | English | |
||
106 | | | 902 881 200 | Spanish | |
||
107 | | Sweden | 0939 2066 400 | English | |
||
108 | | | 0939 2066 300 | Swedish | |
||
109 | |Switzerland | 0848 560 190 | English | |
||
110 | | | 0848 560 378 | French | |
||
111 | | | 0848 560 347 | German | |
||
112 | | | 0848 560 385 | Italian | |
||
113 | | United Kingdom (PowWowNow) | 0844 4 73 73 73 | English | |
||
114 | | United States | 1 415 363 0833 | English | |