Project

General

Profile

Actions

Meeting 09-3-2016

Date: 9th March 2016
Time: 15:00 UK time
Attendance: Melissa, Cheidt, Chunt, Adam, Ed, Paul
h2. Agenda and Minutes

Prev Actions:
Board testing in Tracker lab - EO - 4 tested, no temp or bias calib as yet. Work to continue.
Look at first data - Melissa, Paul and Adam

New Actions:
  • Look at dead channels over time in HW and SW - Melissa and Ed
  • Check efficiency using Admax code and extend to include on 3+ sp tracks. Melissa
  • Speak with Durga about automating all of the calibrations etc for all sub-detectors automated going into MAUS for recon. - Chris Hunt

1. Status of hardware,

Commissioning: EO CMW MU

  • cryostat status (& spares)
  • daresbury interlocks.
  • tracker daq/c&m systems
  • spare boards

No update in particular.

Will coordinate with Ao on when he is back.

MICE hall, inc Services and requirements : CM, GB,

  • Tracker lab.

First Data Analysis - ALL
  • Low level Analysis
  • track analysis
  • efficiency

  • helical tracks

Ed has made a new light yield per channel fit and sent around the root file for us to enjoy.

2. Software: PK, AD, CHunt, CHeidt

  • Validation script
    Work basically ready. Will add in efficiency. Be in for 2.2.
  • CDB
    - Will need to be automated into MAUS. As it is currently done by hand.
    - Chris Hunt will speak with Durga about automating all of the calibrations etc for all sub-detectors automated going into MAUS for a given recon.
  • Geometry,
    - All ok for two weeks now, both in MC and recon. All rotations now passive which is diff from our engineering drawings (but is well documented) and means that in MAUS everything works.
  • Calibrations, Configurations
    - no update but fairly easy to keep calibrations up to date. Not completely automated but will be following more tests
  • Monte Carlo
    - Documentation still outstanding, all else good.
  • Pattern Recognition
    - no update
  • Kalman
    - in and working, systematic studies underway, all user bugs fxed.
  • Online Displays
    - updated in 2.1 with all new plots
  • Performance and Analysis
    - Good
  • Readiness
    - helicals. ongoing

Tracker Software Paper and Documentation - AD, PK DR

Final draft now almost ready!!!!

4. Alignment

  • Chris Heidt is developing his station to station algorithms. He is using a linear least squares approach and the algorithm is now in testing on data. Will have simple residuals soon then 12D residuals then station to station. hopefully 2-3 weeks.

AoB

We may decide on continuing with SW focus meetings as we now only need to look at helicals

Please review tracker paper for Adam before its release.

Chris Heidt geometry code has just been pushed to MAUS 2.1.

The ADC/Pedestal calibration summaries are available on: http://heplnv152.pp.rl.ac.uk/tracker/summary.xhtml

New Actions

Phone Details

  • The four digit company id: 4673 (callers from outside the UK)
  • The pin number: 419357

Phone numbers:

UK (Imperial College --preferred) 0845 545 4460 English
Austria 0820 4000 1503 English
0820 4000 15 02 German
Belgium 070 35 99 45 English
070 35 99 94 Dutch
070 35 98 66 French
Canada 1 712 432 2832 English
1 712 432 2844 French
Germany 01803 001 178 English
01570 248 8303 English (mobile)
01803 001 177 German
01570 248 8101 German (mobile)
Ireland 0818 270 007 English
Italy 848 390 166 English
848 391 819 Italian
Netherlands 0870 001 901 English
0870 001 909 Dutch
Poland 0801 003 543 English
0801 003 533 Polish
South Africa 087 550 0375 English
Spain 902 885 318 English
902 881 200 Spanish
Sweden 0939 2066 400 English
0939 2066 300 Swedish
Switzerland 0848 560 190 English
0848 560 378 French
0848 560 347 German
0848 560 385 Italian
United Kingdom (PowWowNow) 0844 4 73 73 73 English
United States 1 415 363 0833 English

Updated by George, Melissa over 7 years ago ยท 4 revisions