Project

General

Profile

Wiki » History » Version 73

Whyte, Colin, 09 November 2016 17:00

1 46 Long, Kenneth
h1. MICE safety reviews
2 1 Blackmore, Victoria
3 46 Long, Kenneth
On this page is gathered the formal documentation regarding safety in MICE.  The contents includes links to the documentation of working and operational procedures as well as sign-off sheets generated in the run-up to operation.  Links to the MICE/ISIS Safety Committee, formal safety reviews and MICE Safety meetings are also given on this page.
4 12 Long, Kenneth
5 46 Long, Kenneth
h2. MICE operating instructions (OpIs) 
6 36 Long, Kenneth
7 45 Long, Kenneth
* MICE operating instruction 01 (OpI01): attachment:MICE-Opl.01_signed_24Jul15.pdf
8 36 Long, Kenneth
9 50 nichols, andrew
h2. MICE Operational Safety Policy
10
11 53 nichols, andrew
* operational summary note https://micewww.pp.rl.ac.uk/attachments/5309/Safety_Organisation_in_the_MICE_Experiment.pdf
12 50 nichols, andrew
13 51 nichols, andrew
h2. Duty Coordinator matters 
14 50 nichols, andrew
15 52 nichols, andrew
* Duty Coordinator role description https://micewww.pp.rl.ac.uk/attachments/5310/MICE_Duty_Coordinator_roles.pdf
16 50 nichols, andrew
17 69 Whyte, Colin
h2. MICE competencies
18 50 nichols, andrew
19 69 Whyte, Colin
** MICE superconducting magnets; competencies: attachment:2015-07-22-MICE-magnet-competencies-I1.pdf
20
*** Magnetic training slides for MICE system experts: attachment:MICE_MagneticSafety-150722.pdf
21
22
23 49 Nebrensky, Henry
h2. Special Safety Instructions
24
25
* MICE Safety Instruction 001 - Issue Of and Compliance With Electrical Permits to Work: attachment:MICE-001.doc
26 68 Whyte, Colin
* MICE Superconducting magnets instructions 00x - Instructions for MICE users when monitoring superconducting magnets
27
FC Magnet: attachment:FC magnet
28
SS Magnets: attachment:SS magnets
29
* MICE Instructions for expert ramping of superconducting magnets
30
Expert only magnet ramping: attachment:Magnet Ramping procedure
31
* SS QPS system
32
SS QPS system: attachment:QPS(sandor)
33 49 Nebrensky, Henry
34 69 Whyte, Colin
35 73 Whyte, Colin
h2. [[safety-reviews:Archive of past task specific RAMS|Task-specific RAMS - Files can be found with this link]]
36 71 Whyte, Colin
37 46 Long, Kenneth
h2. Task-specific risk assessments and method statements (RAMS):
38 20 Long, Kenneth
39 48 Blackmore, Victoria
* Removal and installation of the diffuser in SSU
40 60 Whyte, Colin
** Risk assessment: attachment:diffuserRA.doc
41
* Commissioning of the MICE magnet system 2016
42 67 Whyte, Colin
** RAMS MICE Magnets Combined operation. attachment: RAMS-Combined-Magnets.pdf
43 54 Whyte, Colin
** MICE Magnets Risk Assessment. attachment:Risk_Assessment_MICE_fields.doc 
44
* Commissioning of the MICE QP/QD system 2016:
45 1 Blackmore, Victoria
** Method statement: attachment:QD-QPCommissioning_2016-05-25.pdf
46 64 Whyte, Colin
** MICE task list for commissioning the MICE magnets and sign-off sheets:
47 60 Whyte, Colin
*** Task list June 30th 2016: attachment:MICE_New_QPS_Commissioning_plan-v1-1.docx
48 54 Whyte, Colin
*** Task list may 2016: attachment:MICE_New_QPS_Commissioning_plan-v0.docx
49 31 Long, Kenneth
** Spectrometer solenoid commission and test activity 2016: attachment:QD-QPCommissioning_RAMS_2016-05-25.pdf
50 1 Blackmore, Victoria
* Commissioning, training and operation of the MICE magnets 2015:
51 35 Long, Kenneth
** Method statement: attachment:2015-07-17-MICE-Step-IV-magnets-MS-I1.pdf
52
** Risk assessment: attachment:2015-07-17-MICE-Step-IV-magnets-RA-I1-r1.1.pdf
53 43 Long, Kenneth
*** Explanation of quantitative risk categories: attachment:2015-07-17-MICE-Step-IV-magnets-RA-I1-r1.2.pdf
54 33 Long, Kenneth
55 69 Whyte, Colin
** MICE task list for commissioning the MICE magnets and sign-off sheets:
56 70 Whyte, Colin
*** Task list: attachment:2015-07-17-MagnetTrainingTaskList.pdf
57
*** Sign-off sheet for spectrometer-solenoid power-supply commissioning: attachment:INTERLOCKS0001.PDF
58
59 34 Long, Kenneth
* Archive of past task-specific RAMS:
60
** MICE Hall: method statement/risk assessment VIP tours of the MICE Hall, 09 and 11 July 2015: attachment:2015-07-09-VIP-Visit.pdf
61
** Supplementary instructions for access to the MICE Hall Action in the event of an alarm from the temporary ODH monitor: attachment:2015-07-07-MICE-Supplementary-Instructions-KL-ODH-1.pdf
62
** Spectrometer solenoid commission and test activity 03Jul15 to 05Jul15: attachment:2015-07-03-SS-test-RAMS.pdf
63 47 Blackmore, Victoria
64 20 Long, Kenneth
65 46 Long, Kenneth
h2. Rules for working in the MICE Hall and generic risk assessments and method statements:
66 20 Long, Kenneth
67 27 Long, Kenneth
* [[2015-06-26-RAMS|MICE Hall (R5.2) Local Rules and generic risk assessments and method statements]]
68 28 Long, Kenneth
* The procedures to be followed in the event of alarms are defined here: attachment:MICE-response-to-alarms-I1.pdf
69 29 Long, Kenneth
* The training records of MICE personnel are recorded in the MICE shift tool "CHEESE".  The records may be accessed via the following link:
70
** "https://cheese.mice.rl.ac.uk/public/":https://cheese.mice.rl.ac.uk/public/
71
** Note that the records are password protected.  An ISIS account has been created and the password has been passed to A. Stevens.
72 13 Long, Kenneth
73 46 Long, Kenneth
h2. MICE-ISIS Safety Committee:
74 12 Long, Kenneth
75 21 Long, Kenneth
* "MICE-ISIS Safety committee meetings":http://micewww.pp.rl.ac.uk/projects/r9-hall-operations/wiki/Lh2Meetings
76 12 Long, Kenneth
77 46 Long, Kenneth
h2. Safety Reviews:
78 12 Long, Kenneth
79
* Magnetic mitigation:
80 9 Long, Kenneth
** 2014-04-28: "Magnetic Shielding Review":https://micewww.pp.rl.ac.uk/projects/magnetic-shielding/wiki/Wiki
81 1 Blackmore, Victoria
*** Feedback: attachment:MICE-Magnetic-Field-Safety-Review-Report.pdf
82
*** [[2015-06-Response2MagShldRev|Response to magnetic-shielding review recommendations]]
83
** 2013 PRY design review:
84
*** Feedback: attachment:MICE_Stray_field_mitigation_review_report.pdf
85
* [[PPS Review]]
86
** [[2015-06-Response2PPSReview|Response to PPS review recommendations]]
87 24 Long, Kenneth
* Liquid Hydrogen Review: attachment:MICE_Liquid_Hydrogen_System_Operational_Review.pdf
88 46 Long, Kenneth
89
h2. MICE safety meetings:
90
91
* 2015:
92
** [[MICE-safety-mtg-2015-08-05|2015-08-05]]