Project

General

Profile

Wiki » History » Version 68

Whyte, Colin, 09 November 2016 16:46

1 46 Long, Kenneth
h1. MICE safety reviews
2 1 Blackmore, Victoria
3 46 Long, Kenneth
On this page is gathered the formal documentation regarding safety in MICE.  The contents includes links to the documentation of working and operational procedures as well as sign-off sheets generated in the run-up to operation.  Links to the MICE/ISIS Safety Committee, formal safety reviews and MICE Safety meetings are also given on this page.
4 12 Long, Kenneth
5 46 Long, Kenneth
h2. MICE operating instructions (OpIs) 
6 36 Long, Kenneth
7 45 Long, Kenneth
* MICE operating instruction 01 (OpI01): attachment:MICE-Opl.01_signed_24Jul15.pdf
8 36 Long, Kenneth
9 50 nichols, andrew
h2. MICE Operational Safety Policy
10
11 53 nichols, andrew
* operational summary note https://micewww.pp.rl.ac.uk/attachments/5309/Safety_Organisation_in_the_MICE_Experiment.pdf
12 50 nichols, andrew
13 51 nichols, andrew
h2. Duty Coordinator matters 
14 50 nichols, andrew
15 52 nichols, andrew
* Duty Coordinator role description https://micewww.pp.rl.ac.uk/attachments/5310/MICE_Duty_Coordinator_roles.pdf
16 50 nichols, andrew
17
18 49 Nebrensky, Henry
h2. Special Safety Instructions
19
20
* MICE Safety Instruction 001 - Issue Of and Compliance With Electrical Permits to Work: attachment:MICE-001.doc
21 68 Whyte, Colin
* MICE Superconducting magnets instructions 00x - Instructions for MICE users when monitoring superconducting magnets
22
FC Magnet: attachment:FC magnet
23
SS Magnets: attachment:SS magnets
24
* MICE Instructions for expert ramping of superconducting magnets
25
Expert only magnet ramping: attachment:Magnet Ramping procedure
26
* SS QPS system
27
SS QPS system: attachment:QPS(sandor)
28 49 Nebrensky, Henry
29 46 Long, Kenneth
h2. Task-specific risk assessments and method statements (RAMS):
30 20 Long, Kenneth
31 48 Blackmore, Victoria
* Removal and installation of the diffuser in SSU
32 47 Blackmore, Victoria
** Risk assessment: attachment:diffuserRA.doc
33 60 Whyte, Colin
* Commissioning of the MICE magnet system 2016
34
** RAMS MICE Magnets Combined operation. attachment: RAMS-Combined-Magnets.pdf
35 67 Whyte, Colin
** MICE Magnets Risk Assessment. attachment:Risk_Assessment_MICE_fields.doc 
36 59 Whyte, Colin
* Commissioning of the MICE QP/QD system 2016:
37 54 Whyte, Colin
** Method statement: attachment:QD-QPCommissioning_2016-05-25.pdf
38
** Risk assessment: attachment:yyyy.pdf
39 1 Blackmore, Victoria
** MICE task list for commissioning the MICE magnets and sign-off sheets:
40 64 Whyte, Colin
*** Task list June 30th 2016: attachment:MICE_New_QPS_Commissioning_plan-v1-1.docx
41 60 Whyte, Colin
*** Task list may 2016: attachment:MICE_New_QPS_Commissioning_plan-v0.docx
42 54 Whyte, Colin
*** Sign-off sheet for spectrometer-solenoid power-supply commissioning: attachment:bbbb.PDF
43 58 Whyte, Colin
** Spectrometer solenoid commission and test activity 2016: attachment:QD-QPCommissioning_RAMS_2016-05-25.pdf
44 54 Whyte, Colin
* Commissioning, training and operation of the MICE magnets 2015:
45 31 Long, Kenneth
** Method statement: attachment:2015-07-17-MICE-Step-IV-magnets-MS-I1.pdf
46 35 Long, Kenneth
** Risk assessment: attachment:2015-07-17-MICE-Step-IV-magnets-RA-I1-r1.1.pdf
47
*** Explanation of quantitative risk categories: attachment:2015-07-17-MICE-Step-IV-magnets-RA-I1-r1.2.pdf
48 43 Long, Kenneth
** MICE superconducting magnets; competencies: attachment:2015-07-22-MICE-magnet-competencies-I1.pdf
49 44 Long, Kenneth
*** Magnetic training slides for MICE system experts: attachment:MICE_MagneticSafety-150722.pdf
50 33 Long, Kenneth
** MICE task list for commissioning the MICE magnets and sign-off sheets:
51
*** Task list: attachment:2015-07-17-MagnetTrainingTaskList.pdf
52
*** Sign-off sheet for spectrometer-solenoid power-supply commissioning: attachment:INTERLOCKS0001.PDF
53 34 Long, Kenneth
* Archive of past task-specific RAMS:
54
** MICE Hall: method statement/risk assessment VIP tours of the MICE Hall, 09 and 11 July 2015: attachment:2015-07-09-VIP-Visit.pdf
55
** Supplementary instructions for access to the MICE Hall Action in the event of an alarm from the temporary ODH monitor: attachment:2015-07-07-MICE-Supplementary-Instructions-KL-ODH-1.pdf
56
** Spectrometer solenoid commission and test activity 03Jul15 to 05Jul15: attachment:2015-07-03-SS-test-RAMS.pdf
57 47 Blackmore, Victoria
58 20 Long, Kenneth
59 46 Long, Kenneth
h2. Rules for working in the MICE Hall and generic risk assessments and method statements:
60 20 Long, Kenneth
61 27 Long, Kenneth
* [[2015-06-26-RAMS|MICE Hall (R5.2) Local Rules and generic risk assessments and method statements]]
62 28 Long, Kenneth
* The procedures to be followed in the event of alarms are defined here: attachment:MICE-response-to-alarms-I1.pdf
63 29 Long, Kenneth
* The training records of MICE personnel are recorded in the MICE shift tool "CHEESE".  The records may be accessed via the following link:
64
** "https://cheese.mice.rl.ac.uk/public/":https://cheese.mice.rl.ac.uk/public/
65
** Note that the records are password protected.  An ISIS account has been created and the password has been passed to A. Stevens.
66 13 Long, Kenneth
67 46 Long, Kenneth
h2. MICE-ISIS Safety Committee:
68 12 Long, Kenneth
69 21 Long, Kenneth
* "MICE-ISIS Safety committee meetings":http://micewww.pp.rl.ac.uk/projects/r9-hall-operations/wiki/Lh2Meetings
70 12 Long, Kenneth
71 46 Long, Kenneth
h2. Safety Reviews:
72 12 Long, Kenneth
73
* Magnetic mitigation:
74 9 Long, Kenneth
** 2014-04-28: "Magnetic Shielding Review":https://micewww.pp.rl.ac.uk/projects/magnetic-shielding/wiki/Wiki
75 1 Blackmore, Victoria
*** Feedback: attachment:MICE-Magnetic-Field-Safety-Review-Report.pdf
76
*** [[2015-06-Response2MagShldRev|Response to magnetic-shielding review recommendations]]
77
** 2013 PRY design review:
78
*** Feedback: attachment:MICE_Stray_field_mitigation_review_report.pdf
79
* [[PPS Review]]
80
** [[2015-06-Response2PPSReview|Response to PPS review recommendations]]
81 24 Long, Kenneth
* Liquid Hydrogen Review: attachment:MICE_Liquid_Hydrogen_System_Operational_Review.pdf
82 46 Long, Kenneth
83
h2. MICE safety meetings:
84
85
* 2015:
86
** [[MICE-safety-mtg-2015-08-05|2015-08-05]]