Wiki » History » Version 63
Whyte, Colin, 30 June 2016 11:52
1 | 46 | Long, Kenneth | h1. MICE safety reviews |
---|---|---|---|
2 | 1 | Blackmore, Victoria | |
3 | 46 | Long, Kenneth | On this page is gathered the formal documentation regarding safety in MICE. The contents includes links to the documentation of working and operational procedures as well as sign-off sheets generated in the run-up to operation. Links to the MICE/ISIS Safety Committee, formal safety reviews and MICE Safety meetings are also given on this page. |
4 | 12 | Long, Kenneth | |
5 | 46 | Long, Kenneth | h2. MICE operating instructions (OpIs) |
6 | 36 | Long, Kenneth | |
7 | 45 | Long, Kenneth | * MICE operating instruction 01 (OpI01): attachment:MICE-Opl.01_signed_24Jul15.pdf |
8 | 36 | Long, Kenneth | |
9 | 50 | nichols, andrew | h2. MICE Operational Safety Policy |
10 | |||
11 | 53 | nichols, andrew | * operational summary note https://micewww.pp.rl.ac.uk/attachments/5309/Safety_Organisation_in_the_MICE_Experiment.pdf |
12 | 50 | nichols, andrew | |
13 | 51 | nichols, andrew | h2. Duty Coordinator matters |
14 | 50 | nichols, andrew | |
15 | 52 | nichols, andrew | * Duty Coordinator role description https://micewww.pp.rl.ac.uk/attachments/5310/MICE_Duty_Coordinator_roles.pdf |
16 | 50 | nichols, andrew | |
17 | |||
18 | 49 | Nebrensky, Henry | h2. Special Safety Instructions |
19 | |||
20 | * MICE Safety Instruction 001 - Issue Of and Compliance With Electrical Permits to Work: attachment:MICE-001.doc |
||
21 | |||
22 | 46 | Long, Kenneth | h2. Task-specific risk assessments and method statements (RAMS): |
23 | 20 | Long, Kenneth | |
24 | 48 | Blackmore, Victoria | * Removal and installation of the diffuser in SSU |
25 | 47 | Blackmore, Victoria | ** Risk assessment: attachment:diffuserRA.doc |
26 | 60 | Whyte, Colin | * Commissioning of the MICE magnet system 2016 |
27 | ** RAMS MICE Magnets Combined operation. attachment: RAMS-Combined-Magnets.pdf |
||
28 | ** MICE Magnets Risk Assessment. Attachment: |
||
29 | 59 | Whyte, Colin | * Commissioning of the MICE QP/QD system 2016: |
30 | 54 | Whyte, Colin | ** Method statement: attachment:QD-QPCommissioning_2016-05-25.pdf |
31 | ** Risk assessment: attachment:yyyy.pdf |
||
32 | 1 | Blackmore, Victoria | ** MICE task list for commissioning the MICE magnets and sign-off sheets: |
33 | 63 | Whyte, Colin | *** Task list June 30th 2016: attachment:MICE_New_QPS_Commissioning_plan-v1_1_.docx |
34 | 60 | Whyte, Colin | *** Task list may 2016: attachment:MICE_New_QPS_Commissioning_plan-v0.docx |
35 | 54 | Whyte, Colin | *** Sign-off sheet for spectrometer-solenoid power-supply commissioning: attachment:bbbb.PDF |
36 | 58 | Whyte, Colin | ** Spectrometer solenoid commission and test activity 2016: attachment:QD-QPCommissioning_RAMS_2016-05-25.pdf |
37 | 54 | Whyte, Colin | * Commissioning, training and operation of the MICE magnets 2015: |
38 | 31 | Long, Kenneth | ** Method statement: attachment:2015-07-17-MICE-Step-IV-magnets-MS-I1.pdf |
39 | 35 | Long, Kenneth | ** Risk assessment: attachment:2015-07-17-MICE-Step-IV-magnets-RA-I1-r1.1.pdf |
40 | *** Explanation of quantitative risk categories: attachment:2015-07-17-MICE-Step-IV-magnets-RA-I1-r1.2.pdf |
||
41 | 43 | Long, Kenneth | ** MICE superconducting magnets; competencies: attachment:2015-07-22-MICE-magnet-competencies-I1.pdf |
42 | 44 | Long, Kenneth | *** Magnetic training slides for MICE system experts: attachment:MICE_MagneticSafety-150722.pdf |
43 | 33 | Long, Kenneth | ** MICE task list for commissioning the MICE magnets and sign-off sheets: |
44 | *** Task list: attachment:2015-07-17-MagnetTrainingTaskList.pdf |
||
45 | *** Sign-off sheet for spectrometer-solenoid power-supply commissioning: attachment:INTERLOCKS0001.PDF |
||
46 | 34 | Long, Kenneth | * Archive of past task-specific RAMS: |
47 | ** MICE Hall: method statement/risk assessment VIP tours of the MICE Hall, 09 and 11 July 2015: attachment:2015-07-09-VIP-Visit.pdf |
||
48 | ** Supplementary instructions for access to the MICE Hall Action in the event of an alarm from the temporary ODH monitor: attachment:2015-07-07-MICE-Supplementary-Instructions-KL-ODH-1.pdf |
||
49 | ** Spectrometer solenoid commission and test activity 03Jul15 to 05Jul15: attachment:2015-07-03-SS-test-RAMS.pdf |
||
50 | 47 | Blackmore, Victoria | |
51 | 20 | Long, Kenneth | |
52 | 46 | Long, Kenneth | h2. Rules for working in the MICE Hall and generic risk assessments and method statements: |
53 | 20 | Long, Kenneth | |
54 | 27 | Long, Kenneth | * [[2015-06-26-RAMS|MICE Hall (R5.2) Local Rules and generic risk assessments and method statements]] |
55 | 28 | Long, Kenneth | * The procedures to be followed in the event of alarms are defined here: attachment:MICE-response-to-alarms-I1.pdf |
56 | 29 | Long, Kenneth | * The training records of MICE personnel are recorded in the MICE shift tool "CHEESE". The records may be accessed via the following link: |
57 | ** "https://cheese.mice.rl.ac.uk/public/":https://cheese.mice.rl.ac.uk/public/ |
||
58 | ** Note that the records are password protected. An ISIS account has been created and the password has been passed to A. Stevens. |
||
59 | 13 | Long, Kenneth | |
60 | 46 | Long, Kenneth | h2. MICE-ISIS Safety Committee: |
61 | 12 | Long, Kenneth | |
62 | 21 | Long, Kenneth | * "MICE-ISIS Safety committee meetings":http://micewww.pp.rl.ac.uk/projects/r9-hall-operations/wiki/Lh2Meetings |
63 | 12 | Long, Kenneth | |
64 | 46 | Long, Kenneth | h2. Safety Reviews: |
65 | 12 | Long, Kenneth | |
66 | * Magnetic mitigation: |
||
67 | 9 | Long, Kenneth | ** 2014-04-28: "Magnetic Shielding Review":https://micewww.pp.rl.ac.uk/projects/magnetic-shielding/wiki/Wiki |
68 | 1 | Blackmore, Victoria | *** Feedback: attachment:MICE-Magnetic-Field-Safety-Review-Report.pdf |
69 | *** [[2015-06-Response2MagShldRev|Response to magnetic-shielding review recommendations]] |
||
70 | ** 2013 PRY design review: |
||
71 | *** Feedback: attachment:MICE_Stray_field_mitigation_review_report.pdf |
||
72 | * [[PPS Review]] |
||
73 | ** [[2015-06-Response2PPSReview|Response to PPS review recommendations]] |
||
74 | 24 | Long, Kenneth | * Liquid Hydrogen Review: attachment:MICE_Liquid_Hydrogen_System_Operational_Review.pdf |
75 | 46 | Long, Kenneth | |
76 | h2. MICE safety meetings: |
||
77 | |||
78 | * 2015: |
||
79 | ** [[MICE-safety-mtg-2015-08-05|2015-08-05]] |