Project

General

Profile

Wiki » History » Version 58

Whyte, Colin, 25 May 2016 09:34

1 46 Long, Kenneth
h1. MICE safety reviews
2 1 Blackmore, Victoria
3 46 Long, Kenneth
On this page is gathered the formal documentation regarding safety in MICE.  The contents includes links to the documentation of working and operational procedures as well as sign-off sheets generated in the run-up to operation.  Links to the MICE/ISIS Safety Committee, formal safety reviews and MICE Safety meetings are also given on this page.
4 12 Long, Kenneth
5 46 Long, Kenneth
h2. MICE operating instructions (OpIs) 
6 36 Long, Kenneth
7 45 Long, Kenneth
* MICE operating instruction 01 (OpI01): attachment:MICE-Opl.01_signed_24Jul15.pdf
8 36 Long, Kenneth
9 50 nichols, andrew
h2. MICE Operational Safety Policy
10
11 53 nichols, andrew
* operational summary note https://micewww.pp.rl.ac.uk/attachments/5309/Safety_Organisation_in_the_MICE_Experiment.pdf
12 50 nichols, andrew
13 51 nichols, andrew
h2. Duty Coordinator matters 
14 50 nichols, andrew
15 52 nichols, andrew
* Duty Coordinator role description https://micewww.pp.rl.ac.uk/attachments/5310/MICE_Duty_Coordinator_roles.pdf
16 50 nichols, andrew
17
18 49 Nebrensky, Henry
h2. Special Safety Instructions
19
20
* MICE Safety Instruction 001 - Issue Of and Compliance With Electrical Permits to Work: attachment:MICE-001.doc
21
22 46 Long, Kenneth
h2. Task-specific risk assessments and method statements (RAMS):
23 20 Long, Kenneth
24 48 Blackmore, Victoria
* Removal and installation of the diffuser in SSU
25 47 Blackmore, Victoria
** Risk assessment: attachment:diffuserRA.doc
26 54 Whyte, Colin
* Commissioning, training and operation of the MICE magnets 2016:
27 56 Whyte, Colin
** Method statement: attachment:QD-QPCommissioning_2016-05-25.pdf
28 54 Whyte, Colin
** Risk assessment: attachment:yyyy.pdf
29
** MICE task list for commissioning the MICE magnets and sign-off sheets:
30 57 Whyte, Colin
*** Task list: attachment:MICE_New_QPS_Commissioning_plan-v0.docx
31 54 Whyte, Colin
*** Sign-off sheet for spectrometer-solenoid power-supply commissioning: attachment:bbbb.PDF
32 58 Whyte, Colin
** Spectrometer solenoid commission and test activity 2016: attachment:QD-QPCommissioning_RAMS_2016-05-25.pdf
33 54 Whyte, Colin
* Commissioning, training and operation of the MICE magnets 2015:
34 31 Long, Kenneth
** Method statement: attachment:2015-07-17-MICE-Step-IV-magnets-MS-I1.pdf
35 35 Long, Kenneth
** Risk assessment: attachment:2015-07-17-MICE-Step-IV-magnets-RA-I1-r1.1.pdf
36
*** Explanation of quantitative risk categories: attachment:2015-07-17-MICE-Step-IV-magnets-RA-I1-r1.2.pdf
37 43 Long, Kenneth
** MICE superconducting magnets; competencies: attachment:2015-07-22-MICE-magnet-competencies-I1.pdf
38 44 Long, Kenneth
*** Magnetic training slides for MICE system experts: attachment:MICE_MagneticSafety-150722.pdf
39 33 Long, Kenneth
** MICE task list for commissioning the MICE magnets and sign-off sheets:
40
*** Task list: attachment:2015-07-17-MagnetTrainingTaskList.pdf
41
*** Sign-off sheet for spectrometer-solenoid power-supply commissioning: attachment:INTERLOCKS0001.PDF
42 34 Long, Kenneth
* Archive of past task-specific RAMS:
43
** MICE Hall: method statement/risk assessment VIP tours of the MICE Hall, 09 and 11 July 2015: attachment:2015-07-09-VIP-Visit.pdf
44
** Supplementary instructions for access to the MICE Hall Action in the event of an alarm from the temporary ODH monitor: attachment:2015-07-07-MICE-Supplementary-Instructions-KL-ODH-1.pdf
45
** Spectrometer solenoid commission and test activity 03Jul15 to 05Jul15: attachment:2015-07-03-SS-test-RAMS.pdf
46 47 Blackmore, Victoria
47 20 Long, Kenneth
48 46 Long, Kenneth
h2. Rules for working in the MICE Hall and generic risk assessments and method statements:
49 20 Long, Kenneth
50 27 Long, Kenneth
* [[2015-06-26-RAMS|MICE Hall (R5.2) Local Rules and generic risk assessments and method statements]]
51 28 Long, Kenneth
* The procedures to be followed in the event of alarms are defined here: attachment:MICE-response-to-alarms-I1.pdf
52 29 Long, Kenneth
* The training records of MICE personnel are recorded in the MICE shift tool "CHEESE".  The records may be accessed via the following link:
53
** "https://cheese.mice.rl.ac.uk/public/":https://cheese.mice.rl.ac.uk/public/
54
** Note that the records are password protected.  An ISIS account has been created and the password has been passed to A. Stevens.
55 13 Long, Kenneth
56 46 Long, Kenneth
h2. MICE-ISIS Safety Committee:
57 12 Long, Kenneth
58 21 Long, Kenneth
* "MICE-ISIS Safety committee meetings":http://micewww.pp.rl.ac.uk/projects/r9-hall-operations/wiki/Lh2Meetings
59 12 Long, Kenneth
60 46 Long, Kenneth
h2. Safety Reviews:
61 12 Long, Kenneth
62
* Magnetic mitigation:
63 9 Long, Kenneth
** 2014-04-28: "Magnetic Shielding Review":https://micewww.pp.rl.ac.uk/projects/magnetic-shielding/wiki/Wiki
64 1 Blackmore, Victoria
*** Feedback: attachment:MICE-Magnetic-Field-Safety-Review-Report.pdf
65
*** [[2015-06-Response2MagShldRev|Response to magnetic-shielding review recommendations]]
66
** 2013 PRY design review:
67
*** Feedback: attachment:MICE_Stray_field_mitigation_review_report.pdf
68
* [[PPS Review]]
69
** [[2015-06-Response2PPSReview|Response to PPS review recommendations]]
70 24 Long, Kenneth
* Liquid Hydrogen Review: attachment:MICE_Liquid_Hydrogen_System_Operational_Review.pdf
71 46 Long, Kenneth
72
h2. MICE safety meetings:
73
74
* 2015:
75
** [[MICE-safety-mtg-2015-08-05|2015-08-05]]