Project

General

Profile

Wiki » History » Version 46

Long, Kenneth, 05 August 2015 14:08

1 46 Long, Kenneth
h1. MICE safety reviews
2 1 Blackmore, Victoria
3 46 Long, Kenneth
On this page is gathered the formal documentation regarding safety in MICE.  The contents includes links to the documentation of working and operational procedures as well as sign-off sheets generated in the run-up to operation.  Links to the MICE/ISIS Safety Committee, formal safety reviews and MICE Safety meetings are also given on this page.
4 12 Long, Kenneth
5 46 Long, Kenneth
h2. MICE operating instructions (OpIs) 
6 36 Long, Kenneth
7 45 Long, Kenneth
* MICE operating instruction 01 (OpI01): attachment:MICE-Opl.01_signed_24Jul15.pdf
8 36 Long, Kenneth
9 46 Long, Kenneth
h2. Task-specific risk assessments and method statements (RAMS):
10 20 Long, Kenneth
11 30 Long, Kenneth
* Commissioning, training and operation of the MICE magnets:
12 31 Long, Kenneth
** Method statement: attachment:2015-07-17-MICE-Step-IV-magnets-MS-I1.pdf
13 35 Long, Kenneth
** Risk assessment: attachment:2015-07-17-MICE-Step-IV-magnets-RA-I1-r1.1.pdf
14
*** Explanation of quantitative risk categories: attachment:2015-07-17-MICE-Step-IV-magnets-RA-I1-r1.2.pdf
15 43 Long, Kenneth
** MICE superconducting magnets; competencies: attachment:2015-07-22-MICE-magnet-competencies-I1.pdf
16 44 Long, Kenneth
*** Magnetic training slides for MICE system experts: attachment:MICE_MagneticSafety-150722.pdf
17 33 Long, Kenneth
** MICE task list for commissioning the MICE magnets and sign-off sheets:
18
*** Task list: attachment:2015-07-17-MagnetTrainingTaskList.pdf
19
*** Sign-off sheet for spectrometer-solenoid power-supply commissioning: attachment:INTERLOCKS0001.PDF
20 34 Long, Kenneth
* Archive of past task-specific RAMS:
21
** MICE Hall: method statement/risk assessment VIP tours of the MICE Hall, 09 and 11 July 2015: attachment:2015-07-09-VIP-Visit.pdf
22
** Supplementary instructions for access to the MICE Hall Action in the event of an alarm from the temporary ODH monitor: attachment:2015-07-07-MICE-Supplementary-Instructions-KL-ODH-1.pdf
23
** Spectrometer solenoid commission and test activity 03Jul15 to 05Jul15: attachment:2015-07-03-SS-test-RAMS.pdf
24 20 Long, Kenneth
25 46 Long, Kenneth
h2. Rules for working in the MICE Hall and generic risk assessments and method statements:
26 20 Long, Kenneth
27 27 Long, Kenneth
* [[2015-06-26-RAMS|MICE Hall (R5.2) Local Rules and generic risk assessments and method statements]]
28 28 Long, Kenneth
* The procedures to be followed in the event of alarms are defined here: attachment:MICE-response-to-alarms-I1.pdf
29 29 Long, Kenneth
* The training records of MICE personnel are recorded in the MICE shift tool "CHEESE".  The records may be accessed via the following link:
30
** "https://cheese.mice.rl.ac.uk/public/":https://cheese.mice.rl.ac.uk/public/
31
** Note that the records are password protected.  An ISIS account has been created and the password has been passed to A. Stevens.
32 13 Long, Kenneth
33 46 Long, Kenneth
h2. MICE-ISIS Safety Committee:
34 12 Long, Kenneth
35 21 Long, Kenneth
* "MICE-ISIS Safety committee meetings":http://micewww.pp.rl.ac.uk/projects/r9-hall-operations/wiki/Lh2Meetings
36 12 Long, Kenneth
37 46 Long, Kenneth
h2. Safety Reviews:
38 12 Long, Kenneth
39
* Magnetic mitigation:
40 9 Long, Kenneth
** 2014-04-28: "Magnetic Shielding Review":https://micewww.pp.rl.ac.uk/projects/magnetic-shielding/wiki/Wiki
41 1 Blackmore, Victoria
*** Feedback: attachment:MICE-Magnetic-Field-Safety-Review-Report.pdf
42
*** [[2015-06-Response2MagShldRev|Response to magnetic-shielding review recommendations]]
43
** 2013 PRY design review:
44
*** Feedback: attachment:MICE_Stray_field_mitigation_review_report.pdf
45
* [[PPS Review]]
46
** [[2015-06-Response2PPSReview|Response to PPS review recommendations]]
47 24 Long, Kenneth
* Liquid Hydrogen Review: attachment:MICE_Liquid_Hydrogen_System_Operational_Review.pdf
48 46 Long, Kenneth
49
h2. MICE safety meetings:
50
51
* 2015:
52
** [[MICE-safety-mtg-2015-08-05|2015-08-05]]