Project

General

Profile

Wiki » History » Version 30

Long, Kenneth, 14 July 2015 12:58

1 12 Long, Kenneth
h1. MICE Safety
2 1 Blackmore, Victoria
3 12 Long, Kenneth
h2. MICE-ISIS Safety Committee; Safety Reviews and Documentation
4
5 25 Long, Kenneth
h3. Task-specific risk assessments and method statements (RAMS):
6 20 Long, Kenneth
7 30 Long, Kenneth
* Commissioning, training and operation of the MICE magnets:
8 23 Long, Kenneth
* MICE Hall: method statement/risk assessment VIP tours of the MICE Hall, 09 and 11 July 2015: attachment:2015-07-09-VIP-Visit.pdf
9 22 Long, Kenneth
* Supplementary instructions for access to the MICE Hall Action in the event of an alarm from the temporary ODH monitor: attachment:2015-07-07-MICE-Supplementary-Instructions-KL-ODH-1.pdf
10
* Spectrometer solenoid commission and test activity 03Jul15 to 05Jul15: attachment:2015-07-03-SS-test-RAMS.pdf
11 20 Long, Kenneth
12 25 Long, Kenneth
h3. Rules for working in the MICE Hall and generic risk assessments and method statements:
13 20 Long, Kenneth
14 27 Long, Kenneth
* [[2015-06-26-RAMS|MICE Hall (R5.2) Local Rules and generic risk assessments and method statements]]
15 28 Long, Kenneth
* The procedures to be followed in the event of alarms are defined here: attachment:MICE-response-to-alarms-I1.pdf
16 29 Long, Kenneth
* The training records of MICE personnel are recorded in the MICE shift tool "CHEESE".  The records may be accessed via the following link:
17
** "https://cheese.mice.rl.ac.uk/public/":https://cheese.mice.rl.ac.uk/public/
18
** Note that the records are password protected.  An ISIS account has been created and the password has been passed to A. Stevens.
19 13 Long, Kenneth
20 12 Long, Kenneth
h3. MICE-ISIS Safety Committee:
21
22 21 Long, Kenneth
* "MICE-ISIS Safety committee meetings":http://micewww.pp.rl.ac.uk/projects/r9-hall-operations/wiki/Lh2Meetings
23 12 Long, Kenneth
24 1 Blackmore, Victoria
h3. Safety Reviews:
25 12 Long, Kenneth
26
* Magnetic mitigation:
27 9 Long, Kenneth
** 2014-04-28: "Magnetic Shielding Review":https://micewww.pp.rl.ac.uk/projects/magnetic-shielding/wiki/Wiki
28 1 Blackmore, Victoria
*** Feedback: attachment:MICE-Magnetic-Field-Safety-Review-Report.pdf
29 24 Long, Kenneth
*** [[2015-06-Response2MagShldRev|Response to magnetic-shielding review recommendations]]
30 11 Long, Kenneth
** 2013 PRY design review:
31 9 Long, Kenneth
*** Feedback: attachment:MICE_Stray_field_mitigation_review_report.pdf
32
* [[PPS Review]]
33 24 Long, Kenneth
** [[2015-06-Response2PPSReview|Response to PPS review recommendations]]
34 8 Watson, Steve
* Liquid Hydrogen Review: attachment:MICE_Liquid_Hydrogen_System_Operational_Review.pdf