Project

General

Profile

Wiki » History » Revision 21

Revision 20 (Long, Kenneth, 03 July 2015 17:56) → Revision 21/102 (Long, Kenneth, 10 July 2015 13:08)

h1. MICE Safety 

 h2. MICE-ISIS Safety Committee; Safety Reviews and Documentation 

 h3. Step IV commissioning and operation: 

 h4. Risk assessments and method statements (RAMS): 

 * RAMS for spectrometer solenoid commission and test activity 03Jul15 to 05Jul15: attachment:2015-07-03-SS-test-RAMS.pdf 

 h4. Draft documentation for full sign off 

 * *Documentation for permission to operate the MICE channel in the Step IV configuration:* 
 ** [[2015-06-Response2PPSReview|Response to PPS review recommendations]] 
 ** [[2015-06-Response2MagShldRev|Response to magnetic-shielding review recommendations]] 
 ** The procedures to be followed in the event of alarms are defined here: attachment:Emergency_procedures_and_responses_to_alarms_during_the_MICE_Step_IV_Experimental_Phase_v2.pdf 
 ** The training records of MICE personnel are recorded in the MICE shift tool "CHEESE".    The records may be accessed via the following link: "https://cheese.mice.rl.ac.uk/public/":https://cheese.mice.rl.ac.uk/public/ 
 ** The risk assessments and method statements in force in the MICE Hall are collected [[2015-06-26-RAMS|here]]. 

 h3. MICE-ISIS Safety Committee: 

 * "MICE-ISIS MICE-ISIS Safety committee meetings":http://micewww.pp.rl.ac.uk/projects/r9-hall-operations/wiki/Lh2Meetings meetings 

 h3. Safety Reviews: 

 * Magnetic mitigation: 
 ** 2014-04-28: "Magnetic Shielding Review":https://micewww.pp.rl.ac.uk/projects/magnetic-shielding/wiki/Wiki 
 *** Feedback: attachment:MICE-Magnetic-Field-Safety-Review-Report.pdf 
 ** 2013 PRY design review: 
 *** Feedback: attachment:MICE_Stray_field_mitigation_review_report.pdf 
 * [[PPS Review]] 
 * Liquid Hydrogen Review: attachment:MICE_Liquid_Hydrogen_System_Operational_Review.pdf