Wiki » History » Version 15

Long, Kenneth, 21 June 2015 14:34

1 12 Long, Kenneth
h1. MICE Safety
2 1 Blackmore, Victoria
3 12 Long, Kenneth
h2. MICE-ISIS Safety Committee; Safety Reviews and Documentation
4
5
h3. Step IV commissioning and operation:
6
7 13 Long, Kenneth
* *Documentation for permission to operate the MICE channel in the Step IV configuration:*
8
** [[2015-06-Response2PPSReview|Response to PPS review recommendations]]
9 14 Long, Kenneth
** [[2015-06-Response2MagShldRev|Response to magnetic-shielding review recommendations]]
10 15 Long, Kenneth
** The procedures to be followed in the event of alarms are defined *_here_*.
11
** The training records of MICE personnel are recorded in the MICE shift tool "CHEESE".  The records may be accessed via the following link: *_link_*.
12
** The risk assessments and method statements in force in the MICE Hall are collected *_here_*.
13 13 Long, Kenneth
14 12 Long, Kenneth
h3. MICE-ISIS Safety Committee:
15
16 1 Blackmore, Victoria
* MICE-ISIS Safety committee meetings
17 12 Long, Kenneth
18
h3. Safety Reviews:
19
20 9 Long, Kenneth
* Magnetic mitigation:
21
** 2014-04-28: "Magnetic Shielding Review":https://micewww.pp.rl.ac.uk/projects/magnetic-shielding/wiki/Wiki
22 11 Long, Kenneth
*** Feedback: attachment:MICE-Magnetic-Field-Safety-Review-Report.pdf
23 9 Long, Kenneth
** 2013 PRY design review:
24
*** Feedback: attachment:MICE_Stray_field_mitigation_review_report.pdf
25 3 Long, Kenneth
* [[PPS Review]]
26 8 Watson, Steve
* Liquid Hydrogen Review: attachment:MICE_Liquid_Hydrogen_System_Operational_Review.pdf