Project

General

Profile

Wiki » History » Version 13

Long, Kenneth, 21 June 2015 13:35

1 12 Long, Kenneth
h1. MICE Safety
2 1 Blackmore, Victoria
3 12 Long, Kenneth
h2. MICE-ISIS Safety Committee; Safety Reviews and Documentation
4
5
h3. Step IV commissioning and operation:
6
7 13 Long, Kenneth
* *Documentation for permission to operate the MICE channel in the Step IV configuration:*
8
** [[2015-06-Response2PPSReview|Response to PPS review recommendations]]
9
10 12 Long, Kenneth
h3. MICE-ISIS Safety Committee:
11
12 1 Blackmore, Victoria
* MICE-ISIS Safety committee meetings
13 12 Long, Kenneth
14
h3. Safety Reviews:
15
16 9 Long, Kenneth
* Magnetic mitigation:
17
** 2014-04-28: "Magnetic Shielding Review":https://micewww.pp.rl.ac.uk/projects/magnetic-shielding/wiki/Wiki
18 11 Long, Kenneth
*** Feedback: attachment:MICE-Magnetic-Field-Safety-Review-Report.pdf
19 9 Long, Kenneth
** 2013 PRY design review:
20
*** Feedback: attachment:MICE_Stray_field_mitigation_review_report.pdf
21 3 Long, Kenneth
* [[PPS Review]]
22 8 Watson, Steve
* Liquid Hydrogen Review: attachment:MICE_Liquid_Hydrogen_System_Operational_Review.pdf