MICE-safety-mtg-2015-08-05

Initial discussion of revision to procedures generated during negotiation of permission to operate the superconducting magnets in the Step IV configuration.

Contributions:
  1. Electrical safety, lock-out/tag-out, magnet-off buttons and access to the channel from the South Mezzanine: S. Griffiths
  2. Use of ferrous tools and search for ferrous objects prior to magnet operations: A. Nichols
  3. Discussion and next steps