1 1 Whyte, Colin
h1. Archive of past task specific RAMS
2
3
4
h2. Task-specific risk assessments and method statements (RAMS):
5
6 6 Whyte, Colin
[[safety-reviews: Superconducting Magnet Wiring Task specific RAMS |Superconducting Magnet Wiring Task-specific RAMS ]]
7
8 1 Whyte, Colin
* Removal and installation of the diffuser in SSU
9
** Risk assessment: attachment:diffuserRA.doc
10 7 Whyte, Colin
11
** MICE Hall: method statement/risk assessment VIP tours of the MICE Hall, 09 and 11 July 2015: attachment:2015-07-09-VIP-Visit.pdf
12
** Supplementary instructions for access to the MICE Hall Action in the event of an alarm from the temporary ODH monitor: attachment:2015-07-07-MICE-Supplementary-Instructions-KL-ODH-1.pdf
13
14
h2. Archive of past task-specific RAMS:
15
16 1 Whyte, Colin
* Commissioning of the MICE magnet system 2016
17
** RAMS MICE Magnets Combined operation. attachment: RAMS-Combined-Magnets.pdf
18
** MICE Magnets Risk Assessment. attachment:Risk_Assessment_MICE_fields.doc 
19 7 Whyte, Colin
20 1 Whyte, Colin
* Commissioning of the MICE QP/QD system 2016:
21 3 Whyte, Colin
** Method statement: attachment:QD-QPCommissioning_2016-05-25-2.pdf
22 1 Whyte, Colin
** MICE task list for commissioning the MICE magnets and sign-off sheets:
23
*** Task list June 30th 2016: attachment:MICE_New_QPS_Commissioning_plan-v1-1.docx
24 2 Whyte, Colin
*** Task list may 2016: attachment:MICE_New_QPS_Commissioning_plan-v0.docx
25 1 Whyte, Colin
** Spectrometer solenoid commission and test activity 2016: attachment:QD-QPCommissioning_RAMS_2016-05-25-3.pdf
26 7 Whyte, Colin
27 1 Whyte, Colin
* Commissioning, training and operation of the MICE magnets 2015:
28
** Method statement: attachment:2015-07-17-MICE-Step-IV-magnets-MS-I1-6.pdf
29
** Risk assessment: attachment:2015-07-17-MICE-Step-IV-magnets-RA-I1-r1.1-2.pdf
30
*** Explanation of quantitative risk categories: attachment:2015-07-17-MICE-Step-IV-magnets-RA-I1-r1.2.pdf
31
** MICE task list for commissioning the MICE magnets and sign-off sheets:
32
*** Task list: attachment:2015-07-17-MagnetTrainingTaskList.pdf
33
*** Sign-off sheet for spectrometer-solenoid power-supply commissioning: attachment:INTERLOCKS0001.PDF
34
35
** Spectrometer solenoid commission and test activity 03Jul15 to 05Jul15: attachment:2015-07-03-SS-test-RAMS.pdf