1 1 Whyte, Colin
h1. Archive of past task specific RAMS
2
3
4
h2. Task-specific risk assessments and method statements (RAMS):
5
6
* Removal and installation of the diffuser in SSU
7
** Risk assessment: attachment:diffuserRA.doc
8
* Commissioning of the MICE magnet system 2016
9
** RAMS MICE Magnets Combined operation. attachment: RAMS-Combined-Magnets.pdf
10
** MICE Magnets Risk Assessment. attachment:Risk_Assessment_MICE_fields.doc 
11
* Commissioning of the MICE QP/QD system 2016:
12 3 Whyte, Colin
** Method statement: attachment:QD-QPCommissioning_2016-05-25-2.pdf
13 1 Whyte, Colin
** MICE task list for commissioning the MICE magnets and sign-off sheets:
14
*** Task list June 30th 2016: attachment:MICE_New_QPS_Commissioning_plan-v1-1.docx
15
*** Task list may 2016: attachment:MICE_New_QPS_Commissioning_plan-v0.docx
16 2 Whyte, Colin
** Spectrometer solenoid commission and test activity 2016: attachment:QD-QPCommissioning_RAMS_2016-05-25-3.pdf
17 1 Whyte, Colin
* Commissioning, training and operation of the MICE magnets 2015:
18
** Method statement: attachment:2015-07-17-MICE-Step-IV-magnets-MS-I1.pdf
19
** Risk assessment: attachment:2015-07-17-MICE-Step-IV-magnets-RA-I1-r1.1.pdf
20
*** Explanation of quantitative risk categories: attachment:2015-07-17-MICE-Step-IV-magnets-RA-I1-r1.2.pdf
21
22
** MICE task list for commissioning the MICE magnets and sign-off sheets:
23
*** Task list: attachment:2015-07-17-MagnetTrainingTaskList.pdf
24
*** Sign-off sheet for spectrometer-solenoid power-supply commissioning: attachment:INTERLOCKS0001.PDF
25
26
* Archive of past task-specific RAMS:
27
** MICE Hall: method statement/risk assessment VIP tours of the MICE Hall, 09 and 11 July 2015: attachment:2015-07-09-VIP-Visit.pdf
28
** Supplementary instructions for access to the MICE Hall Action in the event of an alarm from the temporary ODH monitor: attachment:2015-07-07-MICE-Supplementary-Instructions-KL-ODH-1.pdf
29
** Spectrometer solenoid commission and test activity 03Jul15 to 05Jul15: attachment:2015-07-03-SS-test-RAMS.pdf