Task specific RAMS¶
Superconducting Magnet Wiring Task-specific RAMS
- Removal and installation of the diffuser in SSU
- Risk assessment: diffuserRA.doc
- Method statement: DiffuserMS.pdf
- MICE Hall: method statement/risk assessment VIP tours of the MICE Hall, 09 and 11 July 2015: 2015-07-09-VIP-Visit.pdf
- Supplementary instructions for access to the MICE Hall Action in the event of an alarm from the temporary ODH monitor: 2015-07-07-MICE-Supplementary-Instructions-KL-ODH-1.pdf
Archive of past task-specific RAMS:¶
- Commissioning of the MICE magnet system 2016
- RAMS MICE Magnets Combined operation. attachment: RAMS-Combined-Magnets.pdf
- MICE Magnets Risk Assessment. Risk_Assessment_MICE_fields.doc
- Commissioning of the MICE QP/QD system 2016:
- Method statement: QD-QPCommissioning_2016-05-25-2.pdf
- MICE task list for commissioning the MICE magnets and sign-off sheets:
- Task list June 30th 2016: MICE_New_QPS_Commissioning_plan-v1-1.docx
- Task list may 2016: MICE_New_QPS_Commissioning_plan-v0.docx
- Spectrometer solenoid commission and test activity 2016: QD-QPCommissioning_RAMS_2016-05-25-3.pdf
- Commissioning, training and operation of the MICE magnets 2015:
- Method statement: 2015-07-17-MICE-Step-IV-magnets-MS-I1-6.pdf
- Risk assessment: 2015-07-17-MICE-Step-IV-magnets-RA-I1-r1.1-2.pdf
- Explanation of quantitative risk categories: 2015-07-17-MICE-Step-IV-magnets-RA-I1-r1.2.pdf
- MICE task list for commissioning the MICE magnets and sign-off sheets:
- Task list: 2015-07-17-MagnetTrainingTaskList.pdf
- Sign-off sheet for spectrometer-solenoid power-supply commissioning: INTERLOCKS0001.PDF
- Spectrometer solenoid commission and test activity 03Jul15 to 05Jul15: 2015-07-03-SS-test-RAMS.pdf