Archive of past task specific RAMS » History » Revision 11
Revision 10 (Whyte, Colin, 20 December 2016 11:25) → Revision 11/17 (Whyte, Colin, 20 December 2016 11:26)
h1. Task specific RAMS [[safety-reviews: Superconducting Magnet Wiring Task specific RAMS |Superconducting Magnet Wiring Task-specific RAMS ]] * Removal and installation of the diffuser in SSU ** Risk assessment: attachment:diffuserRA.doc ** Method statement: attachment:Removal_and_Re-installation_Of_The_Diffuser_Into_The_Upstream_Spectrometer_Solenoid(an)_.doc attachment:Removal_and_Re-installation_Of_The_Diffuser_Into_The_Upstream_Spectrometer_Solenoid(an).doc ** MICE Hall: method statement/risk assessment VIP tours of the MICE Hall, 09 and 11 July 2015: attachment:2015-07-09-VIP-Visit.pdf ** Supplementary instructions for access to the MICE Hall Action in the event of an alarm from the temporary ODH monitor: attachment:2015-07-07-MICE-Supplementary-Instructions-KL-ODH-1.pdf h2. Archive of past task-specific RAMS: * Commissioning of the MICE magnet system 2016 ** RAMS MICE Magnets Combined operation. attachment: RAMS-Combined-Magnets.pdf ** MICE Magnets Risk Assessment. attachment:Risk_Assessment_MICE_fields.doc * Commissioning of the MICE QP/QD system 2016: ** Method statement: attachment:QD-QPCommissioning_2016-05-25-2.pdf ** MICE task list for commissioning the MICE magnets and sign-off sheets: *** Task list June 30th 2016: attachment:MICE_New_QPS_Commissioning_plan-v1-1.docx *** Task list may 2016: attachment:MICE_New_QPS_Commissioning_plan-v0.docx ** Spectrometer solenoid commission and test activity 2016: attachment:QD-QPCommissioning_RAMS_2016-05-25-3.pdf * Commissioning, training and operation of the MICE magnets 2015: ** Method statement: attachment:2015-07-17-MICE-Step-IV-magnets-MS-I1-6.pdf ** Risk assessment: attachment:2015-07-17-MICE-Step-IV-magnets-RA-I1-r1.1-2.pdf *** Explanation of quantitative risk categories: attachment:2015-07-17-MICE-Step-IV-magnets-RA-I1-r1.2.pdf ** MICE task list for commissioning the MICE magnets and sign-off sheets: *** Task list: attachment:2015-07-17-MagnetTrainingTaskList.pdf *** Sign-off sheet for spectrometer-solenoid power-supply commissioning: attachment:INTERLOCKS0001.PDF ** Spectrometer solenoid commission and test activity 03Jul15 to 05Jul15: attachment:2015-07-03-SS-test-RAMS.pdf