Archive of past task specific RAMS » History » Version 10
Whyte, Colin, 20 December 2016 11:25
1 | 8 | Whyte, Colin | h1. Task specific RAMS |
---|---|---|---|
2 | 1 | Whyte, Colin | |
3 | 6 | Whyte, Colin | [[safety-reviews: Superconducting Magnet Wiring Task specific RAMS |Superconducting Magnet Wiring Task-specific RAMS ]] |
4 | |||
5 | 1 | Whyte, Colin | * Removal and installation of the diffuser in SSU |
6 | ** Risk assessment: attachment:diffuserRA.doc |
||
7 | 10 | Whyte, Colin | ** Method statement: attachment:Removal_and_Re-installation_Of_The_Diffuser_Into_The_Upstream_Spectrometer_Solenoid(an).doc |
8 | 7 | Whyte, Colin | |
9 | ** MICE Hall: method statement/risk assessment VIP tours of the MICE Hall, 09 and 11 July 2015: attachment:2015-07-09-VIP-Visit.pdf |
||
10 | ** Supplementary instructions for access to the MICE Hall Action in the event of an alarm from the temporary ODH monitor: attachment:2015-07-07-MICE-Supplementary-Instructions-KL-ODH-1.pdf |
||
11 | |||
12 | h2. Archive of past task-specific RAMS: |
||
13 | |||
14 | 1 | Whyte, Colin | * Commissioning of the MICE magnet system 2016 |
15 | ** RAMS MICE Magnets Combined operation. attachment: RAMS-Combined-Magnets.pdf |
||
16 | ** MICE Magnets Risk Assessment. attachment:Risk_Assessment_MICE_fields.doc |
||
17 | 7 | Whyte, Colin | |
18 | 1 | Whyte, Colin | * Commissioning of the MICE QP/QD system 2016: |
19 | 3 | Whyte, Colin | ** Method statement: attachment:QD-QPCommissioning_2016-05-25-2.pdf |
20 | 1 | Whyte, Colin | ** MICE task list for commissioning the MICE magnets and sign-off sheets: |
21 | *** Task list June 30th 2016: attachment:MICE_New_QPS_Commissioning_plan-v1-1.docx |
||
22 | 2 | Whyte, Colin | *** Task list may 2016: attachment:MICE_New_QPS_Commissioning_plan-v0.docx |
23 | 1 | Whyte, Colin | ** Spectrometer solenoid commission and test activity 2016: attachment:QD-QPCommissioning_RAMS_2016-05-25-3.pdf |
24 | 7 | Whyte, Colin | |
25 | 1 | Whyte, Colin | * Commissioning, training and operation of the MICE magnets 2015: |
26 | ** Method statement: attachment:2015-07-17-MICE-Step-IV-magnets-MS-I1-6.pdf |
||
27 | ** Risk assessment: attachment:2015-07-17-MICE-Step-IV-magnets-RA-I1-r1.1-2.pdf |
||
28 | *** Explanation of quantitative risk categories: attachment:2015-07-17-MICE-Step-IV-magnets-RA-I1-r1.2.pdf |
||
29 | ** MICE task list for commissioning the MICE magnets and sign-off sheets: |
||
30 | *** Task list: attachment:2015-07-17-MagnetTrainingTaskList.pdf |
||
31 | *** Sign-off sheet for spectrometer-solenoid power-supply commissioning: attachment:INTERLOCKS0001.PDF |
||
32 | |||
33 | ** Spectrometer solenoid commission and test activity 03Jul15 to 05Jul15: attachment:2015-07-03-SS-test-RAMS.pdf |