Project

General

Profile

Wiki » History » Version 58

MOM, Mice Operations Manager, 24 April 2013 09:54

1 1 Tunnell, Christopher
h1. Operations Wiki
2
3 55 Coney, Linda
h2. Critical Information
4
5 56 Coney, Linda
* [[Web_Whiteboard|Web Whiteboard]] - list of changes to configurations and hardware/software issues to actively track
6 55 Coney, Linda
7
8 1 Tunnell, Christopher
h2. Running
9 36 Coney, Linda
10 1 Tunnell, Christopher
* [[RunPreparationList|Hall preparation list]] - actions needed in advance of running
11 36 Coney, Linda
12
* [[RunPlans|Daily Shift/Run Plans]]
13
14
* [[BeamlineOptics|Beamline Optics]]
15
16 44 Coney, Linda
* [[Online Reconstruction|Online Reconstruction]]
17
18 46 Rogers, Chris
* [[RALSiteIssues|Record of issues to do with RAL site - power, network, etc]] 
19
20 36 Coney, Linda
* General Information
21 1 Tunnell, Christopher
** [[ComputingInformation|Computing Information]]
22
** [[ControlRoomFAQ|Control Room (MLCR)]]
23
** [[RackRoom|Rack Room]]
24
** [[Guide to ISIS Machine physics]]
25 58 MOM, Mice Operations Manager
** [[Access to ISIS Synchrotron]]
26 1 Tunnell, Christopher
27 36 Coney, Linda
h2. MICE Shifters
28
29
* "First shift":http://mice.iit.edu/mico/miceShifterInstr.htm guide
30 1 Tunnell, Christopher
* [[UnofficialShifterGuide|The Unofficial Guide to being a Shifter]]
31
* [[ShifterRostering|Shifter scheduling]]
32
* [[UnofficialShifterTrainingDraft|Draft comments on Shifter Training]]
33
34
h2. MICE Operations Managers (MOMs)
35
36
* [[MOMHandover|Information needed for the next MOM]]
37 42 MOM, Mice Operations Manager
* [[MOMDutiesList|The MOM's duties - standing list]]
38 43 Coney, Linda
* [[Training Shifters]]
39 41 MOM, Mice Operations Manager
* Procedures
40
** [[MOMProceduresPowerCut|What to do in a power cut]]
41 1 Tunnell, Christopher
42 51 Nebrensky, Henry
h2. MICE Muon Beamline (BLOCs)
43 52 Nebrensky, Henry
44 51 Nebrensky, Henry
* Scope
45
* BLOC training
46 53 Nebrensky, Henry
** responsibilities
47
** [[BLOCtraining|Syllabus]]
48 51 Nebrensky, Henry
** BLOCs
49
50 37 Nebrensky, Henry
h2. Safety Information
51 38 Nebrensky, Henry
52 37 Nebrensky, Henry
* [[Firealarm|Fire alarms in MICE hall]]
53
* Documentation (RA/MS)
54
* Periodic Safety Checks
55 40 Nebrensky, Henry
* "Construction (Design and Management) Regulations 2007":http://www.hse.gov.uk/construction/cdm.htm
56 37 Nebrensky, Henry
57 45 Rogers, Chris
h2. Redmine
58 36 Coney, Linda
59 1 Tunnell, Christopher
*  [[UpdatingDocuments|Updating Documentation]]
60 37 Nebrensky, Henry
61
h2. Operations Meetings
62
63
Meetings to discuss issues specifically related to MICE Operations.
64
65 57 Coney, Linda
* [[PC_0418313|Thursday 18th April 2013 at 15:00 BST]]
66
67 37 Nebrensky, Henry
h2. MICO Meetings
68
69
* [[PC_141211|Wednesday 14th December 2011 at 16.30 GMT]]
70
71
h2. Other Operations Meetings
72
73 54 Rogers, Chris
* [[FF_20130409|Hall survey 9th April 2013]]
74 50 Rogers, Chris
* [[FF_20130325|Magnet Mapping/R9 survey 25th March 2013]]
75 49 Rogers, Chris
* [[FF_20120205|RAL PPD Computing 7 Feb 2013]]
76
* [[FF_20120205a|RAL PPD Computing 5 Feb 2013]]
77 48 Rogers, Chris
* [[FF_20121401|RAL PPD Computing 14 Jan 2013]]
78 37 Nebrensky, Henry
* [[RunPlanMeeting20120322|Run Plan Mtg (22 March 2012)]]
79 48 Rogers, Chris
* [[PC_121211|Monday 12th December 2011 at 15.00 GMT]]
80 37 Nebrensky, Henry
81 6 Tunnell, Christopher
82 1 Tunnell, Christopher
h2. Steps of MICE
83
84 2 Tunnell, Christopher
The definitions of the steps of MICE can be seen in the "schedule":http://micewww.pp.rl.ac.uk:8080/documents/2.
85 1 Tunnell, Christopher
86
h3. Step 1
87 16 Coney, Linda
88
* [[Step1PostPartum|Post-partum information]]
89
90
h3. Step 4
91
92
* [[Step4RunPlan|Run Plan]]