Project

General

Profile

Wiki » History » Version 319

Franchini, Paolo, 10 March 2018 11:40

1 1 Tunnell, Christopher
h1. Operations Wiki
2
3 93 Taylor, Ian
{{>toc}}
4 92 Taylor, Ian
5 55 Coney, Linda
h2. Critical Information
6
7 56 Coney, Linda
* [[Web_Whiteboard|Web Whiteboard]] - list of changes to configurations and hardware/software issues to actively track
8 292 Franchini, Paolo
* "elog":http://elog.mice.rl.ac.uk - latest activity
9 291 Franchini, Paolo
* "Operations calendar":https://www.google.com/calendar/embed?src=miceops%40gmail.com&ctz=Europe/London
10 293 Franchini, Paolo
* "CDB Viewer":http://cdb.mice.rl.ac.uk
11 294 Franchini, Paolo
* "MICE Hall Webcams":http://mice.iit.edu/mico/webcams/ (or locally in the control room: file:///home/epics/epicsPRO/Config/AppLauncher/CamMenu.html)
12 319 Franchini, Paolo
* document#197 (scan of the books, need to sign-in)
13 231 Whyte, Colin
14 1 Tunnell, Christopher
h2. Run plan for Cycle 2017.02
15
 
16
*Detailed, shift-by-shift, run plan:* attachment:2017-09-28-Detailed-RunPlan-v10.pdf
17 316 Long, Kenneth
*Block run plan:* attachment:2017-10-02-Ccl-17-02-Blk-RnPln-Final-r4.pdf
18 1 Tunnell, Christopher
19
h2. Measurement list spreadsheet for Cycle 2017.02
20
21
attachment:MICE_User_Run_2017_02-v2.xls
22
23 314 Long, Kenneth
h2. Mice Hall Plan
24
25
Daily Hall Meeting 2017 Sept-Oct Run.
26
[[Daily Hall Meeting-2017-09-15|Daily Hall Meeting-2017-09-15]]
27
[[Daily Hall Meeting-2017-09-14|Daily Hall Meeting-2017-09-14]]
28
[[Daily Hall Meeting-2017-09-13|Daily Hall Meeting-2017-09-13]]
29
 
30
attachment:17-08-10-CW.xlsx
31
32 278 Whyte, Colin
h2. Tasks June 2017
33 297 Whyte, Colin
34 262 Whyte, Colin
attachment:MICE-Work-List-May-2017.pdf
35 242 Whyte, Colin
36
h2. ISIS run schedule
37 251 Boyd, Steven
38 242 Whyte, Colin
attachment:IMC-P34-16_isis-running-schedule_2016-18_at13jun16.xlsx
39 55 Coney, Linda
40 222 Boyd, Steven
h2. MICE Duty Co-ordinator Roster
41
42 223 Boyd, Steven
|_. Date From |_. Date To |_. DC  |
43 276 Boyd, Steven
| 22nd November 2016 | 3rd January 2017 | C. Macwaters |
44 223 Boyd, Steven
45 277 Boyd, Steven
DC Phone Contact Number (from UK) : 07922 088204 & 07901531601 
46 223 Boyd, Steven
                        (from abroad) : +44 7922 088204
47
48 212 Boyd, Steven
h2. Safety and Conduct of Visitors at RAL
49
50
All MICE visitors sign up to abide by the RCUK employee codes of conduct, which can be found here:
51
52 213 Boyd, Steven
http://www.rcuk.ac.uk/about/aboutrcuk/aims/workingforrcs/harmonised-employment-terms-and-conditions/
53 212 Boyd, Steven
54
The STFC Guide to Managing people is here:
55
56
http://staff.stfc.ac.uk/people/hr/Documents/LineManagerGuide.pdf
57
58
Of note are pages 30-31 which describe the misconduct-related discipline procedure which *will
59
be invoked for any abuses of the codes of conduct by visitors while on STFC premises*. This statement
60
has been endorsed by STFC HR. For the purposes of this information, Andy Nichols (GLIMOS) is the Line Manager
61
and Professor Dave Wark (Director of PPD) is the Senior Line Manager.
62
   
63 159 Boyd, Steven
h2. [[CHEESE|CHEESE - The MICE Shift Scheduler]]
64
65 195 Boyd, Steven
h2. [[Running|Run Information]]
66 36 Coney, Linda
67 185 Boyd, Steven
h2. [[MICE Shifter Guides|MICE Shifter Guides]]
68
69 201 Boyd, Steven
h2. [[MICE Operations Training| MICE Training]]
70
71 186 Boyd, Steven
h2. [[MICE Operations Managers (MOMs)|MICE Operations Managers]]
72 1 Tunnell, Christopher
73 248 Nebrensky, Henry
h2. [[MICE Muon Beamline Experts (BLOCs)|MICE Muon Beamline On-Call (BLOCs)]]
74 188 Boyd, Steven
75 191 Boyd, Steven
h2. [[Operations Meetings|Operations Meetings]]
76
77 192 Boyd, Steven
h2. [[MICE Subsystem Documentation|MICE Subsystem Documentation]]
78
79 196 Rajaram, Durga
h2. "ISIS User Database":https://users.facilities.rl.ac.uk
80
81 298 Whyte, Colin
h2. [[MICE Water Changeover|MICE Water Changeover]] - ONLY for use when roof cooling system will be off for more than 6 hours.
82
83 302 Whyte, Colin
h2. RAL On-call guidance
84
85
http://staff.stfc.ac.uk/people/CEM/Documents/STFC_CEM_12B.pdf
86
87 37 Nebrensky, Henry
h2. Safety Information
88 38 Nebrensky, Henry
89 37 Nebrensky, Henry
* [[Firealarm|Fire alarms in MICE hall]]
90 199 Boyd, Steven
* [[OtherSafetyAlarms|Oxygen Deficiency Hazard Alarm]]
91 211 Nebrensky, Henry
** Personal Alarm "User Manual":http://micewww.pp.rl.ac.uk/attachments/5165/Crowcon_ClipAndClipPlusUserManual_Iss3-Feb15_Eng.pdf
92 197 Boyd, Steven
* [[OtherSafetyAlarms|Neutron Monitor]]
93 198 Boyd, Steven
* [[OtherSafetyAlarms|Hydrogen Alarm]]
94 200 Boyd, Steven
* [[OtherSafetyAlarms|Power Cut to the Hall]]
95 86 Nebrensky, Henry
* "Documentation [RA/MS]":http://www.mice.iit.edu/mico/doc/
96 1 Tunnell, Christopher
* Periodic Safety Checks
97 86 Nebrensky, Henry
* "STFC Safety Portal":http://www.stfc.ac.uk/SHE/default.aspx
98 89 Nebrensky, Henry
** [[SafetyIncidentReports|Notes on submitting an Incident Report]]
99 40 Nebrensky, Henry
* "Construction (Design and Management) Regulations 2007":http://www.hse.gov.uk/construction/cdm.htm
100 37 Nebrensky, Henry
101 45 Rogers, Chris
h2. Redmine
102 130 Boyd, Steven
103 128 Nebrensky, Henry
*  [[UpdatingDocuments|Updating Documentation]]
104 6 Tunnell, Christopher
105 1 Tunnell, Christopher
h2. Steps of MICE
106
107 2 Tunnell, Christopher
The definitions of the steps of MICE can be seen in the "schedule":http://micewww.pp.rl.ac.uk:8080/documents/2.
108 1 Tunnell, Christopher
109
h3. Step 1
110 16 Coney, Linda
111
* [[Step1PostPartum|Post-partum information]]
112
113
h3. Step 4
114
115 126 Boyd, Steven
* Step IV Data taking planning document : attachment:DataPlan.pdf
116 254 Nebrensky, Henry
117 257 Whyte, Colin
* [[Step4RunningRequirements|Step 4 Running Requirements]]
118
* [[Step4Readiness|draft Step 4 Readiness]]
119 261 Whyte, Colin
* [[_summary_step4_readiness_|Step 4 Readiness (summer 2016)]]