Project

General

Profile

Wiki » History » Version 316

Long, Kenneth, 08 October 2017 01:30

1 1 Tunnell, Christopher
h1. Operations Wiki
2
3 93 Taylor, Ian
{{>toc}}
4 92 Taylor, Ian
5 55 Coney, Linda
h2. Critical Information
6
7 56 Coney, Linda
* [[Web_Whiteboard|Web Whiteboard]] - list of changes to configurations and hardware/software issues to actively track
8 292 Franchini, Paolo
* "elog":http://elog.mice.rl.ac.uk - latest activity
9 291 Franchini, Paolo
* "Operations calendar":https://www.google.com/calendar/embed?src=miceops%40gmail.com&ctz=Europe/London
10 293 Franchini, Paolo
* "CDB Viewer":http://cdb.mice.rl.ac.uk
11 294 Franchini, Paolo
* "MICE Hall Webcams":http://mice.iit.edu/mico/webcams/ (or locally in the control room: file:///home/epics/epicsPRO/Config/AppLauncher/CamMenu.html)
12 231 Whyte, Colin
13 1 Tunnell, Christopher
h2. Run plan for Cycle 2017.02
14
 
15
*Detailed, shift-by-shift, run plan:* attachment:2017-09-28-Detailed-RunPlan-v10.pdf
16 316 Long, Kenneth
*Block run plan:* attachment:2017-10-02-Ccl-17-02-Blk-RnPln-Final-r4.pdf
17 1 Tunnell, Christopher
18
h2. Measurement list spreadsheet for Cycle 2017.02
19
20
attachment:MICE_User_Run_2017_02-v2.xls
21
22 314 Long, Kenneth
h2. Mice Hall Plan
23
24
Daily Hall Meeting 2017 Sept-Oct Run.
25
[[Daily Hall Meeting-2017-09-15|Daily Hall Meeting-2017-09-15]]
26
[[Daily Hall Meeting-2017-09-14|Daily Hall Meeting-2017-09-14]]
27
[[Daily Hall Meeting-2017-09-13|Daily Hall Meeting-2017-09-13]]
28
 
29
attachment:17-08-10-CW.xlsx
30
31 278 Whyte, Colin
h2. Tasks June 2017
32 297 Whyte, Colin
33 262 Whyte, Colin
attachment:MICE-Work-List-May-2017.pdf
34 242 Whyte, Colin
35
h2. ISIS run schedule
36 251 Boyd, Steven
37 242 Whyte, Colin
attachment:IMC-P34-16_isis-running-schedule_2016-18_at13jun16.xlsx
38 55 Coney, Linda
39 222 Boyd, Steven
h2. MICE Duty Co-ordinator Roster
40
41 223 Boyd, Steven
|_. Date From |_. Date To |_. DC  |
42 276 Boyd, Steven
| 22nd November 2016 | 3rd January 2017 | C. Macwaters |
43 223 Boyd, Steven
44 277 Boyd, Steven
DC Phone Contact Number (from UK) : 07922 088204 & 07901531601 
45 223 Boyd, Steven
                        (from abroad) : +44 7922 088204
46
47 212 Boyd, Steven
h2. Safety and Conduct of Visitors at RAL
48
49
All MICE visitors sign up to abide by the RCUK employee codes of conduct, which can be found here:
50
51 213 Boyd, Steven
http://www.rcuk.ac.uk/about/aboutrcuk/aims/workingforrcs/harmonised-employment-terms-and-conditions/
52 212 Boyd, Steven
53
The STFC Guide to Managing people is here:
54
55
http://staff.stfc.ac.uk/people/hr/Documents/LineManagerGuide.pdf
56
57
Of note are pages 30-31 which describe the misconduct-related discipline procedure which *will
58
be invoked for any abuses of the codes of conduct by visitors while on STFC premises*. This statement
59
has been endorsed by STFC HR. For the purposes of this information, Andy Nichols (GLIMOS) is the Line Manager
60
and Professor Dave Wark (Director of PPD) is the Senior Line Manager.
61
   
62 159 Boyd, Steven
h2. [[CHEESE|CHEESE - The MICE Shift Scheduler]]
63
64 195 Boyd, Steven
h2. [[Running|Run Information]]
65 36 Coney, Linda
66 185 Boyd, Steven
h2. [[MICE Shifter Guides|MICE Shifter Guides]]
67
68 201 Boyd, Steven
h2. [[MICE Operations Training| MICE Training]]
69
70 186 Boyd, Steven
h2. [[MICE Operations Managers (MOMs)|MICE Operations Managers]]
71 1 Tunnell, Christopher
72 248 Nebrensky, Henry
h2. [[MICE Muon Beamline Experts (BLOCs)|MICE Muon Beamline On-Call (BLOCs)]]
73 188 Boyd, Steven
74 191 Boyd, Steven
h2. [[Operations Meetings|Operations Meetings]]
75
76 192 Boyd, Steven
h2. [[MICE Subsystem Documentation|MICE Subsystem Documentation]]
77
78 196 Rajaram, Durga
h2. "ISIS User Database":https://users.facilities.rl.ac.uk
79
80 298 Whyte, Colin
h2. [[MICE Water Changeover|MICE Water Changeover]] - ONLY for use when roof cooling system will be off for more than 6 hours.
81
82 302 Whyte, Colin
h2. RAL On-call guidance
83
84
http://staff.stfc.ac.uk/people/CEM/Documents/STFC_CEM_12B.pdf
85
86 37 Nebrensky, Henry
h2. Safety Information
87 38 Nebrensky, Henry
88 37 Nebrensky, Henry
* [[Firealarm|Fire alarms in MICE hall]]
89 199 Boyd, Steven
* [[OtherSafetyAlarms|Oxygen Deficiency Hazard Alarm]]
90 211 Nebrensky, Henry
** Personal Alarm "User Manual":http://micewww.pp.rl.ac.uk/attachments/5165/Crowcon_ClipAndClipPlusUserManual_Iss3-Feb15_Eng.pdf
91 197 Boyd, Steven
* [[OtherSafetyAlarms|Neutron Monitor]]
92 198 Boyd, Steven
* [[OtherSafetyAlarms|Hydrogen Alarm]]
93 200 Boyd, Steven
* [[OtherSafetyAlarms|Power Cut to the Hall]]
94 86 Nebrensky, Henry
* "Documentation [RA/MS]":http://www.mice.iit.edu/mico/doc/
95 1 Tunnell, Christopher
* Periodic Safety Checks
96 86 Nebrensky, Henry
* "STFC Safety Portal":http://www.stfc.ac.uk/SHE/default.aspx
97 89 Nebrensky, Henry
** [[SafetyIncidentReports|Notes on submitting an Incident Report]]
98 40 Nebrensky, Henry
* "Construction (Design and Management) Regulations 2007":http://www.hse.gov.uk/construction/cdm.htm
99 37 Nebrensky, Henry
100 45 Rogers, Chris
h2. Redmine
101 130 Boyd, Steven
102 128 Nebrensky, Henry
*  [[UpdatingDocuments|Updating Documentation]]
103 6 Tunnell, Christopher
104 1 Tunnell, Christopher
h2. Steps of MICE
105
106 2 Tunnell, Christopher
The definitions of the steps of MICE can be seen in the "schedule":http://micewww.pp.rl.ac.uk:8080/documents/2.
107 1 Tunnell, Christopher
108
h3. Step 1
109 16 Coney, Linda
110
* [[Step1PostPartum|Post-partum information]]
111
112
h3. Step 4
113
114 126 Boyd, Steven
* Step IV Data taking planning document : attachment:DataPlan.pdf
115 254 Nebrensky, Henry
116 257 Whyte, Colin
* [[Step4RunningRequirements|Step 4 Running Requirements]]
117
* [[Step4Readiness|draft Step 4 Readiness]]
118 261 Whyte, Colin
* [[_summary_step4_readiness_|Step 4 Readiness (summer 2016)]]