Project

General

Profile

Wiki » History » Version 297

Whyte, Colin, 05 June 2017 14:45

1 1 Tunnell, Christopher
h1. Operations Wiki
2
3 93 Taylor, Ian
{{>toc}}
4 92 Taylor, Ian
5 55 Coney, Linda
h2. Critical Information
6
7 56 Coney, Linda
* [[Web_Whiteboard|Web Whiteboard]] - list of changes to configurations and hardware/software issues to actively track
8 292 Franchini, Paolo
* "elog":http://elog.mice.rl.ac.uk - latest activity
9 291 Franchini, Paolo
* "Operations calendar":https://www.google.com/calendar/embed?src=miceops%40gmail.com&ctz=Europe/London
10 293 Franchini, Paolo
* "CDB Viewer":http://cdb.mice.rl.ac.uk
11 294 Franchini, Paolo
* "MICE Hall Webcams":http://mice.iit.edu/mico/webcams/ (or locally in the control room: file:///home/epics/epicsPRO/Config/AppLauncher/CamMenu.html)
12 231 Whyte, Colin
13 234 Whyte, Colin
14 236 Whyte, Colin
h2. Mice Hall Plan
15
 
16 273 Whyte, Colin
attachment:Mice-Hall-Plan-16-11-08.xlsx 
17 262 Whyte, Colin
18 295 Whyte, Colin
h2. Tasks June 2017
19 278 Whyte, Colin
20 297 Whyte, Colin
attachment:MICE-Work-List-May-2017.pdf
21 262 Whyte, Colin
22 242 Whyte, Colin
h2. ISIS run schedule
23
24 251 Boyd, Steven
attachment:IMC-P34-16_isis-running-schedule_2016-18_at13jun16.xlsx
25 242 Whyte, Colin
26 55 Coney, Linda
27 222 Boyd, Steven
h2. MICE Duty Co-ordinator Roster
28
29 223 Boyd, Steven
|_. Date From |_. Date To |_. DC  |
30 276 Boyd, Steven
| 22nd November 2016 | 3rd January 2017 | C. Macwaters |
31 223 Boyd, Steven
32 277 Boyd, Steven
DC Phone Contact Number (from UK) : 07922 088204 & 07901531601 
33 223 Boyd, Steven
                        (from abroad) : +44 7922 088204
34
35 212 Boyd, Steven
h2. Safety and Conduct of Visitors at RAL
36
37
All MICE visitors sign up to abide by the RCUK employee codes of conduct, which can be found here:
38
39 213 Boyd, Steven
http://www.rcuk.ac.uk/about/aboutrcuk/aims/workingforrcs/harmonised-employment-terms-and-conditions/
40 212 Boyd, Steven
41
The STFC Guide to Managing people is here:
42
43
http://staff.stfc.ac.uk/people/hr/Documents/LineManagerGuide.pdf
44
45
Of note are pages 30-31 which describe the misconduct-related discipline procedure which *will
46
be invoked for any abuses of the codes of conduct by visitors while on STFC premises*. This statement
47
has been endorsed by STFC HR. For the purposes of this information, Andy Nichols (GLIMOS) is the Line Manager
48
and Professor Dave Wark (Director of PPD) is the Senior Line Manager.
49
   
50 159 Boyd, Steven
h2. [[CHEESE|CHEESE - The MICE Shift Scheduler]]
51
52 195 Boyd, Steven
h2. [[Running|Run Information]]
53 36 Coney, Linda
54 185 Boyd, Steven
h2. [[MICE Shifter Guides|MICE Shifter Guides]]
55
56 201 Boyd, Steven
h2. [[MICE Operations Training| MICE Training]]
57
58 186 Boyd, Steven
h2. [[MICE Operations Managers (MOMs)|MICE Operations Managers]]
59 1 Tunnell, Christopher
60 248 Nebrensky, Henry
h2. [[MICE Muon Beamline Experts (BLOCs)|MICE Muon Beamline On-Call (BLOCs)]]
61 188 Boyd, Steven
62 191 Boyd, Steven
h2. [[Operations Meetings|Operations Meetings]]
63
64 192 Boyd, Steven
h2. [[MICE Subsystem Documentation|MICE Subsystem Documentation]]
65
66 196 Rajaram, Durga
h2. "ISIS User Database":https://users.facilities.rl.ac.uk
67
68 37 Nebrensky, Henry
h2. Safety Information
69 38 Nebrensky, Henry
70 37 Nebrensky, Henry
* [[Firealarm|Fire alarms in MICE hall]]
71 199 Boyd, Steven
* [[OtherSafetyAlarms|Oxygen Deficiency Hazard Alarm]]
72 211 Nebrensky, Henry
** Personal Alarm "User Manual":http://micewww.pp.rl.ac.uk/attachments/5165/Crowcon_ClipAndClipPlusUserManual_Iss3-Feb15_Eng.pdf
73 197 Boyd, Steven
* [[OtherSafetyAlarms|Neutron Monitor]]
74 198 Boyd, Steven
* [[OtherSafetyAlarms|Hydrogen Alarm]]
75 200 Boyd, Steven
* [[OtherSafetyAlarms|Power Cut to the Hall]]
76 86 Nebrensky, Henry
* "Documentation [RA/MS]":http://www.mice.iit.edu/mico/doc/
77 1 Tunnell, Christopher
* Periodic Safety Checks
78 86 Nebrensky, Henry
* "STFC Safety Portal":http://www.stfc.ac.uk/SHE/default.aspx
79 89 Nebrensky, Henry
** [[SafetyIncidentReports|Notes on submitting an Incident Report]]
80 40 Nebrensky, Henry
* "Construction (Design and Management) Regulations 2007":http://www.hse.gov.uk/construction/cdm.htm
81 37 Nebrensky, Henry
82 45 Rogers, Chris
h2. Redmine
83 130 Boyd, Steven
84 128 Nebrensky, Henry
*  [[UpdatingDocuments|Updating Documentation]]
85 6 Tunnell, Christopher
86 1 Tunnell, Christopher
h2. Steps of MICE
87
88 2 Tunnell, Christopher
The definitions of the steps of MICE can be seen in the "schedule":http://micewww.pp.rl.ac.uk:8080/documents/2.
89 1 Tunnell, Christopher
90
h3. Step 1
91 16 Coney, Linda
92
* [[Step1PostPartum|Post-partum information]]
93
94
h3. Step 4
95
96 126 Boyd, Steven
* Step IV Data taking planning document : attachment:DataPlan.pdf
97 254 Nebrensky, Henry
98 257 Whyte, Colin
* [[Step4RunningRequirements|Step 4 Running Requirements]]
99
* [[Step4Readiness|draft Step 4 Readiness]]
100 261 Whyte, Colin
* [[_summary_step4_readiness_|Step 4 Readiness (summer 2016)]]