Project

General

Profile

Wiki » History » Version 262

Whyte, Colin, 17 August 2016 14:40

1 1 Tunnell, Christopher
h1. Operations Wiki
2
3 93 Taylor, Ian
{{>toc}}
4 92 Taylor, Ian
5 55 Coney, Linda
h2. Critical Information
6
7 56 Coney, Linda
* [[Web_Whiteboard|Web Whiteboard]] - list of changes to configurations and hardware/software issues to actively track
8 69 Rogers, Chris
* "elog":https://micewww.pp.rl.ac.uk/elog/ - latest activity
9 142 Rogers, Chris
* "Operations calendar":https://www.google.com/calendar/embed?src=miceops%40gmail.com&ctz=Europe/London
10 227 Boyd, Steven
* "CDB Viewer":http://heplnv152.pp.rl.ac.uk:4443/cdbviewer/
11 202 Boyd, Steven
* "MICE Hall Webcams":http://mice.iit.edu/mico/webcams/
12 244 Hodgson, Paul
*  Current Weekly Hall Workplan : attachment:2016-05-16-Workplan.pdf
13 231 Whyte, Colin
14 234 Whyte, Colin
15 236 Whyte, Colin
h2. Mice Hall Plan
16
 
17 260 Whyte, Colin
attachment:2016-08-17-Mice_Hall_Plan.xlsx
18 249 Hodgson, Paul
Weekly work plan: attachment:2016-06-13-Workplan.pdf
19 234 Whyte, Colin
20 262 Whyte, Colin
h2. Step IV Summer shutdown 2016. 
21
22
[[_StepIV_Shutdown_Summer_|Step 4 Shutdown summer 2016]]
23
24 242 Whyte, Colin
h2. ISIS run schedule
25
26 251 Boyd, Steven
attachment:IMC-P34-16_isis-running-schedule_2016-18_at13jun16.xlsx
27 242 Whyte, Colin
28 55 Coney, Linda
29 222 Boyd, Steven
h2. MICE Duty Co-ordinator Roster
30
31 223 Boyd, Steven
|_. Date From |_. Date To |_. DC  |
32 253 Blackmore, Victoria
| 6th July 2016 | 11th July 2016 | V. Blackmore |
33
| 11th July 2016 | 14th July 2016 | C. Macwaters |
34
| 14th July 2016 | 18th July 2016 | V. Blackmore |
35 223 Boyd, Steven
36
DC Phone Contact Number (from UK) : 07922 088204 
37
                        (from abroad) : +44 7922 088204
38
39 212 Boyd, Steven
h2. Safety and Conduct of Visitors at RAL
40
41
All MICE visitors sign up to abide by the RCUK employee codes of conduct, which can be found here:
42
43 213 Boyd, Steven
http://www.rcuk.ac.uk/about/aboutrcuk/aims/workingforrcs/harmonised-employment-terms-and-conditions/
44 212 Boyd, Steven
45
The STFC Guide to Managing people is here:
46
47
http://staff.stfc.ac.uk/people/hr/Documents/LineManagerGuide.pdf
48
49
Of note are pages 30-31 which describe the misconduct-related discipline procedure which *will
50
be invoked for any abuses of the codes of conduct by visitors while on STFC premises*. This statement
51
has been endorsed by STFC HR. For the purposes of this information, Andy Nichols (GLIMOS) is the Line Manager
52
and Professor Dave Wark (Director of PPD) is the Senior Line Manager.
53
   
54 159 Boyd, Steven
h2. [[CHEESE|CHEESE - The MICE Shift Scheduler]]
55
56 195 Boyd, Steven
h2. [[Running|Run Information]]
57 36 Coney, Linda
58 185 Boyd, Steven
h2. [[MICE Shifter Guides|MICE Shifter Guides]]
59
60 201 Boyd, Steven
h2. [[MICE Operations Training| MICE Training]]
61
62 186 Boyd, Steven
h2. [[MICE Operations Managers (MOMs)|MICE Operations Managers]]
63 1 Tunnell, Christopher
64 248 Nebrensky, Henry
h2. [[MICE Muon Beamline Experts (BLOCs)|MICE Muon Beamline On-Call (BLOCs)]]
65 188 Boyd, Steven
66 191 Boyd, Steven
h2. [[Operations Meetings|Operations Meetings]]
67
68 192 Boyd, Steven
h2. [[MICE Subsystem Documentation|MICE Subsystem Documentation]]
69
70 196 Rajaram, Durga
h2. "ISIS User Database":https://users.facilities.rl.ac.uk
71
72 37 Nebrensky, Henry
h2. Safety Information
73 38 Nebrensky, Henry
74 37 Nebrensky, Henry
* [[Firealarm|Fire alarms in MICE hall]]
75 199 Boyd, Steven
* [[OtherSafetyAlarms|Oxygen Deficiency Hazard Alarm]]
76 211 Nebrensky, Henry
** Personal Alarm "User Manual":http://micewww.pp.rl.ac.uk/attachments/5165/Crowcon_ClipAndClipPlusUserManual_Iss3-Feb15_Eng.pdf
77 197 Boyd, Steven
* [[OtherSafetyAlarms|Neutron Monitor]]
78 198 Boyd, Steven
* [[OtherSafetyAlarms|Hydrogen Alarm]]
79 200 Boyd, Steven
* [[OtherSafetyAlarms|Power Cut to the Hall]]
80 86 Nebrensky, Henry
* "Documentation [RA/MS]":http://www.mice.iit.edu/mico/doc/
81 1 Tunnell, Christopher
* Periodic Safety Checks
82 86 Nebrensky, Henry
* "STFC Safety Portal":http://www.stfc.ac.uk/SHE/default.aspx
83 89 Nebrensky, Henry
** [[SafetyIncidentReports|Notes on submitting an Incident Report]]
84 40 Nebrensky, Henry
* "Construction (Design and Management) Regulations 2007":http://www.hse.gov.uk/construction/cdm.htm
85 37 Nebrensky, Henry
86 45 Rogers, Chris
h2. Redmine
87 130 Boyd, Steven
88 128 Nebrensky, Henry
*  [[UpdatingDocuments|Updating Documentation]]
89 6 Tunnell, Christopher
90 1 Tunnell, Christopher
h2. Steps of MICE
91
92 2 Tunnell, Christopher
The definitions of the steps of MICE can be seen in the "schedule":http://micewww.pp.rl.ac.uk:8080/documents/2.
93 1 Tunnell, Christopher
94
h3. Step 1
95 16 Coney, Linda
96
* [[Step1PostPartum|Post-partum information]]
97
98
h3. Step 4
99
100 126 Boyd, Steven
* Step IV Data taking planning document : attachment:DataPlan.pdf
101 254 Nebrensky, Henry
102 257 Whyte, Colin
* [[Step4RunningRequirements|Step 4 Running Requirements]]
103
* [[Step4Readiness|draft Step 4 Readiness]]
104 261 Whyte, Colin
* [[_summary_step4_readiness_|Step 4 Readiness (summer 2016)]]