Wiki » History » Revision 142
Revision 141 (Boyd, Steven, 26 January 2015 13:13) → Revision 142/320 (Rogers, Chris, 28 January 2015 16:44)
h1. Operations Wiki
{{>toc}}
h2. Critical Information
* [[Web_Whiteboard|Web Whiteboard]] - list of changes to configurations and hardware/software issues to actively track
* "elog":https://micewww.pp.rl.ac.uk/elog/ - latest activity
* "Operations calendar":https://www.google.com/calendar/embed?src=miceops%40gmail.com&ctz=Europe/London
h2. Running
* [[RunPreparationList|Run preparation list]] - actions needed in advance of running
* [[RunPlans|Daily Shift/Run Plans]]
* [[Issues encountered in runs / Lessons learned ]]
* [[BeamlineOptics|Beamline Optics]]
** [[BeamlineMuonBeams|Sample Muon Beams]]
* [[Online Reconstruction|Online Reconstruction]]
* General Information
** [[ComputingInformation|Computing Information]]
** [[ControlRoomFAQ|Control Room (MLCR)]]
** [[RackRoom|Rack Room]]
** [[Guide to ISIS Machine physics]]
** [[Access to ISIS Synchrotron]]
** "ISIS Beam Status":http://www.isis.stfc.ac.uk/beam-status/beam-status4463.html
** "ISIS MCR News":http://www.isis.stfc.ac.uk/mcr-news/mcr-news6502.html
** Extract from present draft of 2015 ISIS User Run plan: attachment:2014-06-ISIS-draft.pdf
* [[Magnet mapping data]]
* [[Significant Events]]
h2. MICE Shifters
* [[First shift]] guide
* [[UnofficialShifterGuide|The Unofficial Guide to being a Shifter]]
* [[ShifterRostering|Shifter scheduling]]
* [[CHEESE|CHEESE - The MICE Shift Scheduler]]
h2. MICE Operations Managers (MOMs)
* [[MOMRoster| MOM Roster]]
* [[MOMHandover|Information needed for the next MOM]]
* [[MOMDutiesList|The MOM's duties - standing list]]
* [[MOMResponsibilities|The MOM Responsibilities]]
* [[Training Shifters]]
* [[operations-mom:wiki|Expert List]] (in progress, password protected)
* Procedures
** [[MOMProceduresRackRoomPowerOffOn|Switching Rack Room Elements On and Off]]
** [[MOMProceduresPowerCut|What to do in a power cut]]
** [[MOMProceduresRadiationSurveys|Dealing with Radiation Surveys]]
** [[SurveyProcedure|Procedure for taking surveys]]
** [[ListOfSurveyRequests|List Of Survey Requests]]
* [[RALSiteIssues|Record of issues to do with RAL site - power, network, etc]]
h2. MICE Muon Beamline (BLOCs)
* Scope
* BLOC training
** [[BLOCresponsibilities|Responsibilities]]
** [[BLOCtraining|Syllabus]]
** BLOCs
* Procedures
** [[BeamlineProcsTargetFail|What to do if target fails]]
** [[BeamlineProcsDipoleMove|Moving Dipoles]]
** [[BeamlineProcsTestPOMPOMs|Routine POMPOM sensor tests]]
** [[BeamlineProcsEarthLeakTrip|What to check when a conventional magnet trips]]
** [[BeamlineProcsTargetGateValve|Target Gate Valve]]
** [[BeamlineProcsVMEcrateFail|Control crates]]
* Misc
** [[BeamlineDocsBoratedPE|Borated Polythene specs]] (I will move this link at some point)
** [[BeamlineDocsGaussmeterGM08|Gaussmeter GM08]]
h2. Safety Information
* [[Firealarm|Fire alarms in MICE hall]]
* "Documentation [RA/MS]":http://www.mice.iit.edu/mico/doc/
* Periodic Safety Checks
* "STFC Safety Portal":http://www.stfc.ac.uk/SHE/default.aspx
** [[SafetyIncidentReports|Notes on submitting an Incident Report]]
* "Construction (Design and Management) Regulations 2007":http://www.hse.gov.uk/construction/cdm.htm
h2. Redmine
* [[UpdatingDocuments|Updating Documentation]]
h2. Operations Meetings
Meetings to discuss issues specifically related to MICE Operations.
h2. MICE/ISIS operations meeting:
* [[2014-12-01|2014-12-01]]
h2. Other Operations Meetings
* [[20150119_FF|Preparation for mock data run (19th January 2015)]]
* [[20150112_FF|Preparation for mock data run (12th January 2015)]]
* [[2015-09-01_Survey|Hall Survey (9th January 2015)]]
* [[2014-12-11_MOM-Briefing|MOM Briefing (11 Dec 2014)]]
* [[CommissioningMeeting10Oct2014| Commissioning Meeting (10 Oct 2014)]]
* [[FF_20140721|Hall Surveys 21st July 2014]]
* [[AP_20140117|Doubling target dip rate activation plan 17 Jan 2014]]
* [[PC_20131125|Doubling target dip rate 25 Nov 2013]]
* [[PC_0530313|Thursday 30th May 2013 at 15:00 BST]]
* [[FF_20130800|8V Activation Study discussions July 2013]]
* [[PC_0418313|Thursday 18th April 2013 at 15:00 BST]]
* [[FF_20130409|Hall survey 9th April 2013]]
* [[FF_20130325|Magnet Mapping/R9 survey 25th March 2013]]
* [[FF_20120205|RAL PPD Computing 7 Feb 2013]]
* [[FF_20120205a|RAL PPD Computing 5 Feb 2013]]
* [[FF_20121401|RAL PPD Computing 14 Jan 2013]]
* [[PC_121211|Monday 12th December 2011 at 15.00 GMT]]
* [[RunPlanMeeting20120322|Run Plan Mtg (22 March 2012)]]
h2. Alignment Meetings
* [[AlignmentMeeting21Oct2014| Alignment Meeting (21 Oct 2014)]]
* [[AlignmentMeeting12Dec2014| Alignment Meeting (12 Dec 2014)]]
h2. MICO Meetings
* [[PC_141211|Wednesday 14th December 2011 at 16.30 GMT]]
h2. Mice Hall weekly meeting
* [[HallMeeting-2014-02-05]]
* [[HallMeeting-2014-02-12]]
* [[HallMeeting-2014-02-19]]
* [[HallMeeting-2014-02-26]]
* [[HallMeeting-2014-03-05]]
* [[HallMeeting-2014-03-12]]
* [[HallMeeting-2014-03-19]]
h2. Steps of MICE
The definitions of the steps of MICE can be seen in the "schedule":http://micewww.pp.rl.ac.uk:8080/documents/2.
h3. Step 1
* [[Step1PostPartum|Post-partum information]]
h3. Step 4
* Step IV Data taking planning document : attachment:DataPlan.pdf
* [[Step4RunningRequirements|Step 4 Running Requirements]]
h2. Documentation
* [[Beamstop]]