Project

General

Profile

Wiki » History » Revision 123

Revision 122 (Boyd, Steven, 22 October 2014 12:17) → Revision 123/320 (Boyd, Steven, 29 October 2014 12:45)

h1. Operations Wiki 

 {{>toc}} 

 h2. Critical Information 

 * [[Web_Whiteboard|Web Whiteboard]] - list of changes to configurations and hardware/software issues to actively track 
 * "elog":https://micewww.pp.rl.ac.uk/elog/ - latest activity 

 h2. Running 

 * [[RunPreparationList|Run preparation list]] - actions needed in advance of running 

 * [[RunPlans|Daily Shift/Run Plans]] 

 * [[Issues encountered in runs / Lessons learned ]] 

 * [[BeamlineOptics|Beamline Optics]] 
 ** [[BeamlineMuonBeams|Sample Muon Beams]] 

 * [[Online Reconstruction|Online Reconstruction]] 

 * General Information 
 ** [[ComputingInformation|Computing Information]] 
 ** [[ControlRoomFAQ|Control Room (MLCR)]] 
 ** [[RackRoom|Rack Room]] 
 ** [[Guide to ISIS Machine physics]] 
 ** [[Access to ISIS Synchrotron]] 
 ** "ISIS Beam Status":http://www.isis.stfc.ac.uk/beam-status/beam-status4463.html 
 ** "ISIS MCR News":http://www.isis.stfc.ac.uk/mcr-news/mcr-news6502.html 
 ** Extract from present draft of 2015 ISIS User Run plan: attachment:2014-06-ISIS-draft.pdf 

 * [[Magnet mapping data]] 

 h2. MICE Shifters 

 * [[First shift]] guide 
 * [[UnofficialShifterGuide|The Unofficial Guide to being a Shifter]] 
 * [[ShifterRostering|Shifter scheduling]] 

 h2. MICE Operations Managers (MOMs) 

 * [[MOMRoster| MOM Roster]] 
 * [[MOMHandover|Information needed for the next MOM]] 
 * [[MOMDutiesList|The MOM's duties - standing list]] 
 * [[MOMResponsibilities|The MOM Responsibilities]] 
 * [[Training Shifters]] 
 * [[operations-mom:wiki|Expert List]] (in progress, password protected) 
 * Procedures 
 ** [[MOMProceduresRackRoomPowerOffOn|Switching Rack Room Elements On and Off]] 
 ** [[MOMProceduresPowerCut|What to do in a power cut]] 
 ** [[MOMProceduresRadiationSurveys|Dealing with Radiation Surveys]] 
 ** [[SurveyProcedure|Procedure for taking surveys]] 
 ** [[ListOfSurveyRequests|List Of Survey Requests]] 
 * [[RALSiteIssues|Record of issues to do with RAL site - power, network, etc]] 

 h2. MICE Muon Beamline (BLOCs) 

 * Scope 
 * BLOC training 
 ** [[BLOCresponsibilities|Responsibilities]] 
 ** [[BLOCtraining|Syllabus]] 
 ** BLOCs 
 * Procedures 
 ** [[BeamlineProcsTargetFail|What to do if target fails]] 
 ** [[BeamlineProcsDipoleMove|Moving Dipoles]] 
 ** [[BeamlineProcsTestPOMPOMs|Routine POMPOM sensor tests]] 
 ** [[BeamlineProcsEarthLeakTrip|What to check when a conventional magnet trips]] 
 ** [[BeamlineProcsTargetGateValve|Target Gate Valve]] 
 ** [[BeamlineProcsVMEcrateFail|Control crates]] 
 * Misc 
 ** [[BeamlineDocsBoratedPE|Borated Polythene specs]] (I will move this link at some point) 
 ** [[BeamlineDocsGaussmeterGM08|Gaussmeter GM08]] 

 h2. Safety Information 

 * [[Firealarm|Fire alarms in MICE hall]] 
 * "Documentation [RA/MS]":http://www.mice.iit.edu/mico/doc/ 
 * Periodic Safety Checks 
 * "STFC Safety Portal":http://www.stfc.ac.uk/SHE/default.aspx 
 ** [[SafetyIncidentReports|Notes on submitting an Incident Report]] 
 * "Construction (Design and Management) Regulations 2007":http://www.hse.gov.uk/construction/cdm.htm 

 h2. Redmine 

 *    [[UpdatingDocuments|Updating Documentation]] 

 h2. Operations Meetings 

 Meetings to discuss issues specifically related to MICE Operations. 

 * [[PC_0530313|Thursday 30th May 2013 at 15:00 BST]] 

 * [[PC_0418313|Thursday 18th April 2013 at 15:00 BST]] 

 * [[PC_121211|Monday 12th December 2011 at 15.00 GMT]] 

 h2. MICO Meetings 

 * [[PC_141211|Wednesday 14th December 2011 at 16.30 GMT]] 

 h2. Other Operations Meetings 

 * [[FF_20140721|Hall Surveys 21st July 2014]] 
 * [[AP_20140117|Doubling target dip rate activation plan 17 Jan 2014]] 
 * [[PC_20131125|Doubling target dip rate 25 Nov 2013]] 
 * [[FF_20130800|8V Activation Study discussions July 2013]] 
 * [[FF_20130409|Hall survey 9th April 2013]] 
 * [[FF_20130325|Magnet Mapping/R9 survey 25th March 2013]] 
 * [[FF_20120205|RAL PPD Computing 7 Feb 2013]] 
 * [[FF_20120205a|RAL PPD Computing 5 Feb 2013]] 
 * [[FF_20121401|RAL PPD Computing 14 Jan 2013]] 
 * [[RunPlanMeeting20120322|Run Plan Mtg (22 March 2012)]] 
 * [[CommissioningMeeting10Oct2014| Commissioning Meeting (10 Oct 2014)]] 

 h2. Alignment Meetings 

 * [[AlignmentMeeting21Oct2014| Alignment Meeting (21 Oct 2014)]] 

 h2. Mice Hall weekly meeting 

 * [[HallMeeting-2014-02-05]] 
 * [[HallMeeting-2014-02-12]] 
 * [[HallMeeting-2014-02-19]] 
 * [[HallMeeting-2014-02-26]] 
 * [[HallMeeting-2014-03-05]] 
 * [[HallMeeting-2014-03-12]] 
 * [[HallMeeting-2014-03-19]] 



  


 h2. Steps of MICE 

 The definitions of the steps of MICE can be seen in the "schedule":http://micewww.pp.rl.ac.uk:8080/documents/2. 

 h3. Step 1 

 * [[Step1PostPartum|Post-partum information]] 

 h3. Step 4 

 * [[attachment:StepIVDataTakingPlan]] 

 * [[Step4RunningRequirements|Step 4 Running Requirements]] 
 

 * [[Step4RunPlan|Run Plan]]