Wiki » History » Revision 123
Revision 122 (Boyd, Steven, 22 October 2014 12:17) → Revision 123/320 (Boyd, Steven, 29 October 2014 12:45)
h1. Operations Wiki {{>toc}} h2. Critical Information * [[Web_Whiteboard|Web Whiteboard]] - list of changes to configurations and hardware/software issues to actively track * "elog":https://micewww.pp.rl.ac.uk/elog/ - latest activity h2. Running * [[RunPreparationList|Run preparation list]] - actions needed in advance of running * [[RunPlans|Daily Shift/Run Plans]] * [[Issues encountered in runs / Lessons learned ]] * [[BeamlineOptics|Beamline Optics]] ** [[BeamlineMuonBeams|Sample Muon Beams]] * [[Online Reconstruction|Online Reconstruction]] * General Information ** [[ComputingInformation|Computing Information]] ** [[ControlRoomFAQ|Control Room (MLCR)]] ** [[RackRoom|Rack Room]] ** [[Guide to ISIS Machine physics]] ** [[Access to ISIS Synchrotron]] ** "ISIS Beam Status":http://www.isis.stfc.ac.uk/beam-status/beam-status4463.html ** "ISIS MCR News":http://www.isis.stfc.ac.uk/mcr-news/mcr-news6502.html ** Extract from present draft of 2015 ISIS User Run plan: attachment:2014-06-ISIS-draft.pdf * [[Magnet mapping data]] h2. MICE Shifters * [[First shift]] guide * [[UnofficialShifterGuide|The Unofficial Guide to being a Shifter]] * [[ShifterRostering|Shifter scheduling]] h2. MICE Operations Managers (MOMs) * [[MOMRoster| MOM Roster]] * [[MOMHandover|Information needed for the next MOM]] * [[MOMDutiesList|The MOM's duties - standing list]] * [[MOMResponsibilities|The MOM Responsibilities]] * [[Training Shifters]] * [[operations-mom:wiki|Expert List]] (in progress, password protected) * Procedures ** [[MOMProceduresRackRoomPowerOffOn|Switching Rack Room Elements On and Off]] ** [[MOMProceduresPowerCut|What to do in a power cut]] ** [[MOMProceduresRadiationSurveys|Dealing with Radiation Surveys]] ** [[SurveyProcedure|Procedure for taking surveys]] ** [[ListOfSurveyRequests|List Of Survey Requests]] * [[RALSiteIssues|Record of issues to do with RAL site - power, network, etc]] h2. MICE Muon Beamline (BLOCs) * Scope * BLOC training ** [[BLOCresponsibilities|Responsibilities]] ** [[BLOCtraining|Syllabus]] ** BLOCs * Procedures ** [[BeamlineProcsTargetFail|What to do if target fails]] ** [[BeamlineProcsDipoleMove|Moving Dipoles]] ** [[BeamlineProcsTestPOMPOMs|Routine POMPOM sensor tests]] ** [[BeamlineProcsEarthLeakTrip|What to check when a conventional magnet trips]] ** [[BeamlineProcsTargetGateValve|Target Gate Valve]] ** [[BeamlineProcsVMEcrateFail|Control crates]] * Misc ** [[BeamlineDocsBoratedPE|Borated Polythene specs]] (I will move this link at some point) ** [[BeamlineDocsGaussmeterGM08|Gaussmeter GM08]] h2. Safety Information * [[Firealarm|Fire alarms in MICE hall]] * "Documentation [RA/MS]":http://www.mice.iit.edu/mico/doc/ * Periodic Safety Checks * "STFC Safety Portal":http://www.stfc.ac.uk/SHE/default.aspx ** [[SafetyIncidentReports|Notes on submitting an Incident Report]] * "Construction (Design and Management) Regulations 2007":http://www.hse.gov.uk/construction/cdm.htm h2. Redmine * [[UpdatingDocuments|Updating Documentation]] h2. Operations Meetings Meetings to discuss issues specifically related to MICE Operations. * [[PC_0530313|Thursday 30th May 2013 at 15:00 BST]] * [[PC_0418313|Thursday 18th April 2013 at 15:00 BST]] * [[PC_121211|Monday 12th December 2011 at 15.00 GMT]] h2. MICO Meetings * [[PC_141211|Wednesday 14th December 2011 at 16.30 GMT]] h2. Other Operations Meetings * [[FF_20140721|Hall Surveys 21st July 2014]] * [[AP_20140117|Doubling target dip rate activation plan 17 Jan 2014]] * [[PC_20131125|Doubling target dip rate 25 Nov 2013]] * [[FF_20130800|8V Activation Study discussions July 2013]] * [[FF_20130409|Hall survey 9th April 2013]] * [[FF_20130325|Magnet Mapping/R9 survey 25th March 2013]] * [[FF_20120205|RAL PPD Computing 7 Feb 2013]] * [[FF_20120205a|RAL PPD Computing 5 Feb 2013]] * [[FF_20121401|RAL PPD Computing 14 Jan 2013]] * [[RunPlanMeeting20120322|Run Plan Mtg (22 March 2012)]] * [[CommissioningMeeting10Oct2014| Commissioning Meeting (10 Oct 2014)]] h2. Alignment Meetings * [[AlignmentMeeting21Oct2014| Alignment Meeting (21 Oct 2014)]] h2. Mice Hall weekly meeting * [[HallMeeting-2014-02-05]] * [[HallMeeting-2014-02-12]] * [[HallMeeting-2014-02-19]] * [[HallMeeting-2014-02-26]] * [[HallMeeting-2014-03-05]] * [[HallMeeting-2014-03-12]] * [[HallMeeting-2014-03-19]] h2. Steps of MICE The definitions of the steps of MICE can be seen in the "schedule":http://micewww.pp.rl.ac.uk:8080/documents/2. h3. Step 1 * [[Step1PostPartum|Post-partum information]] h3. Step 4 * [[attachment:StepIVDataTakingPlan]] * [[Step4RunningRequirements|Step 4 Running Requirements]] * [[Step4RunPlan|Run Plan]]