h1. Step 4 Running Requirements
2 1 Dobbs, Adam
3
h2. Personnel
4
5
* Pool of MOMs
6
* Pool of BLOCs
7
* Pool of SOCs
8
* DAQ experts
9
* Detector experts
10
* Pool of shifters
11
* Shift allocation scheme and recording system
12
13
h2. Beamline
14
15 6 Gamet, Raymond
* Target
16
* Decay Solenoid
17
* Proton Absorbers
18
* Conventional Magnets
19
* Beam Stop
20 1 Dobbs, Adam
21 6 Gamet, Raymond
h2. Cooling Channel
22
23
* Spectrometer Solenoids
24 1 Dobbs, Adam
* Hydrogen delivery system
25
* FC1
26 7 Gamet, Raymond
* LH2 Absorber
27
* LiH Absorber
28 6 Gamet, Raymond
* Quench Protection and Monitoring
29 2 Dobbs, Adam
30 1 Dobbs, Adam
h2. Detectors
31
32 6 Gamet, Raymond
* CKOVs
33
* TOFs
34
* Tracker
35
* KL
36
* EMR
37 1 Dobbs, Adam
38 6 Gamet, Raymond
h2. Hall and Infrastructure
39 1 Dobbs, Adam
40 6 Gamet, Raymond
* Hall Services
41 9 Gamet, Raymond
42 6 Gamet, Raymond
   * Neutron Monitor
43
   * Oxygen depletion alarm
44
   * PPS
45
   * Clean (what standard?)
46
   * Surveys
47 1 Dobbs, Adam
* PRY
48 6 Gamet, Raymond
* Cooler Compressors
49
* Vacuum System
50
* Power Systems 
51 5 Dobbs, Adam
52
h2. DAQ
53 1 Dobbs, Adam
54
* DATE
55
* Run Control Interface
56
* Digitisation boards (-> FPGA system)
57
58
h2. Online Computing
59
60 6 Gamet, Raymond
* Online Monitoring
61
* Online Reconstruction
62 1 Dobbs, Adam
* Data storage and movement
63 9 Gamet, Raymond
64
    * UPS
65 6 Gamet, Raymond
    * RAID systems
66
    * Data mover
67
*  Controls and Monitoring
68
    * Run Control
69
    * Alarm handler
70
    * Environment readout
71
    * Webcams
72
    * DS
73
    * Target
74
    * Proton absorber
75 1 Dobbs, Adam
76
77
h2. Offline Computing
78
79
* Full reconstruction chain with all detectors
80
* Global fits
81
* Data quality checks
82
* Automated grid batch processing