Project

General

Profile

Actions

Step4RunningRequirements » History » Revision 9

« Previous | Revision 9/48 (diff) | Next »
Gamet, Raymond, 18 April 2014 14:58


Step 4 Running Requirements

Personnel

  • Pool of MOMs
  • Pool of BLOCs
  • Pool of SOCs
  • DAQ experts
  • Detector experts
  • Pool of shifters
  • Shift allocation scheme and recording system

Beamline

  • Target
  • Decay Solenoid
  • Proton Absorbers
  • Conventional Magnets
  • Beam Stop

Cooling Channel

  • Spectrometer Solenoids
  • Hydrogen delivery system
  • FC1
  • LH2 Absorber
  • LiH Absorber
  • Quench Protection and Monitoring

Detectors

  • CKOVs
  • TOFs
  • Tracker
  • KL
  • EMR

Hall and Infrastructure

  • Hall Services
    • Neutron Monitor
    • Oxygen depletion alarm
    • PPS
    • Clean (what standard?)
    • Surveys
  • PRY
  • Cooler Compressors
  • Vacuum System
  • Power Systems

DAQ

  • DATE
  • Run Control Interface
  • Digitisation boards (-> FPGA system)

Online Computing

  • Online Monitoring
  • Online Reconstruction
  • Data storage and movement
    • UPS
    • RAID systems
    • Data mover
  • Controls and Monitoring * Run Control * Alarm handler * Environment readout * Webcams * DS * Target * Proton absorber

Offline Computing

  • Full reconstruction chain with all detectors
  • Global fits
  • Data quality checks
  • Automated grid batch processing

Updated by Gamet, Raymond about 9 years ago · 9 revisions