h1. Step 4 Running Requirements
2 1 Dobbs, Adam
3
h2. Personnel
4
5
* Pool of MOMs
6
* Pool of BLOCs
7
* Pool of SOCs
8
* DAQ experts
9
* Detector experts
10
* Pool of shifters
11
* Shift allocation scheme and recording system
12
13
h2. Beamline
14
15 6 Gamet, Raymond
* Target
16
* Decay Solenoid
17
* Proton Absorbers
18
* Conventional Magnets
19
* Beam Stop
20 1 Dobbs, Adam
21 6 Gamet, Raymond
h2. Cooling Channel
22
23
* Spectrometer Solenoids
24 1 Dobbs, Adam
* Hydrogen delivery system
25
* FC1
26 7 Gamet, Raymond
* LH2 Absorber
27
* LiH Absorber
28 6 Gamet, Raymond
* Quench Protection and Monitoring
29 2 Dobbs, Adam
30 1 Dobbs, Adam
h2. Detectors
31
32 6 Gamet, Raymond
* CKOVs
33
* TOFs
34
* Tracker
35
* KL
36
* EMR
37 1 Dobbs, Adam
38 6 Gamet, Raymond
h2. Hall and Infrastructure
39 1 Dobbs, Adam
40 6 Gamet, Raymond
* Hall Services
41
   * Neutron Monitor
42
   * Oxygen depletion alarm
43
   * PPS
44
   * Clean (what standard?)
45
   * Surveys
46 1 Dobbs, Adam
* PRY
47 6 Gamet, Raymond
* Cooler Compressors
48
* Vacuum System
49
* Power Systems 
50 5 Dobbs, Adam
51
h2. DAQ
52 1 Dobbs, Adam
53
* DATE
54
* Run Control Interface
55
* Digitisation boards (-> FPGA system)
56
57
h2. Online Computing
58
59 6 Gamet, Raymond
* Online Monitoring
60
* Online Reconstruction
61
* Data storage and movement
62
    * UPS
63
    * RAID systems
64
    * Data mover
65
*  Controls and Monitoring
66
    * Run Control
67
    * Alarm handler
68
    * Environment readout
69
    * Webcams
70
    * DS
71
    * Target
72
    * Proton absorber
73 1 Dobbs, Adam
74
75
h2. Offline Computing
76
77
* Full reconstruction chain with all detectors
78
* Global fits
79
* Data quality checks
80
* Automated grid batch processing