Project

General

Profile

Step4RunningRequirements » History » Version 6

Gamet, Raymond, 18 April 2014 14:54

1 2 Dobbs, Adam
h1. Step 4 Running Requirements
2 1 Dobbs, Adam
3
h2. Personnel
4
5
* Pool of MOMs
6
* Pool of BLOCs
7
* Pool of SOCs
8
* DAQ experts
9
* Detector experts
10
* Pool of shifters
11
* Shift allocation scheme and recording system
12
13
h2. Beamline
14
15 6 Gamet, Raymond
* Target
16
* Decay Solenoid
17
* Proton Absorbers
18
* Conventional Magnets
19
* Beam Stop
20 1 Dobbs, Adam
21 6 Gamet, Raymond
h2. Cooling Channel
22
23
* Spectrometer Solenoids
24 1 Dobbs, Adam
* Hydrogen delivery system
25
* FC1
26 6 Gamet, Raymond
* Quench Protection and Monitoring
27 2 Dobbs, Adam
28 1 Dobbs, Adam
h2. Detectors
29
30 6 Gamet, Raymond
* CKOVs
31
* TOFs
32
* Tracker
33
* KL
34
* EMR
35 1 Dobbs, Adam
36 6 Gamet, Raymond
h2. Hall and Infrastructure
37 1 Dobbs, Adam
38 6 Gamet, Raymond
* Hall Services
39
   * Neutron Monitor
40
   * Oxygen depletion alarm
41
   * PPS
42
   * Clean (what standard?)
43
   * Surveys
44 1 Dobbs, Adam
* PRY
45 6 Gamet, Raymond
* Cooler Compressors
46
* Vacuum System
47
* Power Systems 
48 5 Dobbs, Adam
49
h2. DAQ
50 1 Dobbs, Adam
51
* DATE
52
* Run Control Interface
53
* Digitisation boards (-> FPGA system)
54
55
h2. Online Computing
56
57 6 Gamet, Raymond
* Online Monitoring
58
* Online Reconstruction
59
* Data storage and movement
60
    * UPS
61
    * RAID systems
62
    * Data mover
63
*  Controls and Monitoring
64
    * Run Control
65
    * Alarm handler
66
    * Environment readout
67
    * Webcams
68
    * DS
69
    * Target
70
    * Proton absorber
71 1 Dobbs, Adam
72
73
h2. Offline Computing
74
75
* Full reconstruction chain with all detectors
76
* Global fits
77
* Data quality checks
78
* Automated grid batch processing