Actions
Step4RunningRequirements » History » Revision 43
« Previous |
Revision 43/48
(diff)
| Next »
Dobbs, Adam, 07 May 2014 14:42
Step 4 Running Requirements¶
- Table of contents
- Step 4 Running Requirements
Personnel¶
Overall responsibility for operations rests with Boyd.
Task | Sub Task | Owner | Notes |
Pool of MOMs | Boyd | ||
Pool of BLOCs | Nebrensky | ~ 5 trained at present | |
Pool of SOCs | Rajaram | ~ 5 at current count, see http://micewww.pp.rl.ac.uk/projects/maus/wiki/Software_on-call | |
Pool of shifters | Kyberd? | 24 at current count, 6 qualified as lead shifters, see Training_Shifters | |
Shift allocation scheme and recording system | Blondel | ||
Detector experts | Sub system owners | ||
Muon Beamline¶
Overall responsibility for beamline rests with Nebrensky.
Task | Sub Task | Owner | Notes |
Target | Hodgson | ||
Decay Solenoid | |||
Proton Absorbers | |||
Conventional Magnets | Hughes | ||
Beam Stop | Govans | ||
Cooling Channel¶
Overall responsibility for cooling channel magnets rests with Pasternak.
Task | Sub Task | Owner | Notes |
Spectrometer Solenoids | |||
Hydrogen delivery system | Watson | ||
FC1 | Cobb | ||
LH 2 Absorber | |||
LiH Absorber | |||
Quench Protection and Monitoring | Hanlet | ||
Detectors¶
Overall responsibility for detectors rests with Soler.
Task | Sub Task | Owner | Notes |
CKOVs | Cremaldi | ||
TOFs | Bonesini | ||
Tracker | Adey / Dobbs / Uchida | Detailed plan in place, needs integrating with main MICE schedule, see http://micewww.pp.rl.ac.uk/documents/85 | |
KL | Tortona | ||
EMR | Blondel | ||
Hall and Infrastructure¶
Task | Sub Task | Owner | Notes |
Hall Services | Govans | ||
Neutron Monitor | Govans | ||
Oxygen depletion alarm | Govans | ||
PPS | MacWaters | ||
Clean | Govans | What standard? | |
Surveys | |||
PRY | Tarrant | ||
Cooler Compressors | Tucker | ||
Vacuum System | Tucker | ||
Power Systems | Griffiths | ||
DAQ¶
Task | Sub Task | Owner | Notes |
DATE | Karadzhov | ||
Run Control Interface | Hanlet | ||
Digitisation boards (-> FPGA system) | Karadzhov | ||
Online Computing¶
Overall responsibility for computing rests with Rogers.
Task | Sub Task | Owner | Notes |
CDB | |||
Online Monitoring | Rogers | ||
Online Reconstruction | Rogers | ||
Data storage and movement | Nebrensky | ||
UPS | |||
RAID systems | |||
Data mover | Nebrensky | ||
Controls and Monitoring | Hanlet | ||
Run Control | Hanlet | ||
Alarm handler | Hanlet | ||
Environment readout | Hanlet | ||
Webcams | |||
DS | |||
Target | |||
Proton absorber | Hanlet | ||
Offline Computing¶
Overall responsibility for computing rests with Rogers.
Task | Sub Task | Owner | Notes |
Full reconstruction chain with all detectors | Rajaram | See http://micewww.pp.rl.ac.uk/projects/maus/wiki/Release_schedule | |
CKOV | Cremaldi | ||
EMR | Asfandiyarov | ||
KL | Tortona | ||
TOF | Rajaram | ||
Tracker | Dobbs | ||
Global | Dobbs | ||
Data quality checks | |||
Automated grid batch processing | Martinyak | ||
Updated by Dobbs, Adam over 9 years ago · 43 revisions