h1. Step 4 Running Requirements
2 1 Dobbs, Adam
3
h2. Personnel
4
5
* Pool of MOMs
6
* Pool of BLOCs
7
* Pool of SOCs
8
* DAQ experts
9
* Detector experts
10
* Pool of shifters
11
* Shift allocation scheme and recording system
12
13
h2. Beamline
14
15 3 Dobbs, Adam
h2. AFC
16
17
* Hydrogen delivery system
18
* FC1
19
* Cryocoolers
20
21
h2. SS
22
23
* Cryocoolers
24
25 1 Dobbs, Adam
h3. Target
26
27
h3. Conventional Magnets
28
29
h3. Decay Solenoid
30
31
h3. Beam stop
32
33
h3. Proton absorbers
34
35 2 Dobbs, Adam
h2. Detectors
36
37
h3. CKOVs
38
39
h3. TOFs
40
41
h3. Tracker
42
43 1 Dobbs, Adam
h3. KL and EMR
44
45 3 Dobbs, Adam
h2. Hall
46 1 Dobbs, Adam
47 3 Dobbs, Adam
* Neutron Monitor
48
* Oxygen depletion alarm
49
* PPS
50
* Clean (what standard?)
51
* PRY
52 4 Dobbs, Adam
* Surveys
53 1 Dobbs, Adam
54
h2. DAQ
55
56
* DATE
57
* Run Control Interface
58
* Digitisation boards (-> FPGA system)
59
60
h2. Online Computing
61
62
h3. Online Monitoring
63
64
h3. Online Reconstruction
65
66
h3. Data storage and movement
67
68
* UPS
69
* RAID systems
70
* Data mover
71
72
h3. Controls and Monitoring
73
74
* Run Control
75
* Alarm handler
76
* Environment readout
77
* Webcams
78
* DS
79
* Target
80
* Proton absorber
81
82
h2. Offline Computing
83
84
* Full reconstruction chain with all detectors
85
* Global fits
86
* Data quality checks
87
* Automated grid batch processing