Step4RunningRequirements » History » Revision 36
Revision 35 (Dobbs, Adam, 07 May 2014 14:16) → Revision 36/48 (Dobbs, Adam, 07 May 2014 14:18)
h1. Step 4 Running Requirements {{toc}} h2. Personnel Overall responsibility for operations rests with Boyd. | | *Task* | *Sub Task* | *Owner* | *Notes* | | Pool of MOMs | | Boyd | | | Pool of BLOCs | | Nebrensky | ~5 trained at present | | Pool of SOCs | | Rajaram | | | Pool of shifters | | Kyberd? | 24 at current count, 6 qualified as lead shifters, see [[Training_Shifters]] | | Shift allocation scheme and recording system | | Blondel | | | Detector experts | | Sub system owners | | | h2. Muon Beamline Overall responsibility for beamline rests with Nebrensky. | | *Task* | *Sub Task* | *Owner* | *Notes* | | Target || Hodgson | | Decay Solenoid | | | | | Proton Absorbers | | | | | Conventional Magnets | | Hughes | | | Beam Stop | | Govans | | | h2. Cooling Channel Overall responsibility for cooling channel magnets rests with Pasternak. | | *Task* | *Sub Task* | *Owner* | *Notes* | | Spectrometer Solenoids | | | | | Hydrogen delivery system | | Watson | | | FC1 | | Cobb | | | LH2 Absorber | | | | | LiH Absorber | | | | | Quench Protection and Monitoring | | Hanlet | | | h2. Detectors Overall responsibility for detectors rests with Soler. | | *Task* | *Sub Task* | *Owner* | *Notes* | | CKOVs | | Cremaldi | | | TOFs | | Bonesini | | | Tracker | | Adey / Dobbs / Uchida | Detailed plan in place, needs integrating with main MICE schedule, see http://micewww.pp.rl.ac.uk/documents/85 | | KL | | Tortona | | | EMR | | Blondel | | | h2. Hall and Infrastructure | | *Task* | *Sub Task* | *Owner* | *Notes* | | Hall Services | | Govans | | | | Neutron Monitor | | | | | Oxygen depletion alarm | | | | | PPS | | | | | Clean (what standard?) | | | | | Surveys | | | | PRY | | Tarrant | | | Cooler Compressors | | Tucker | | | Vacuum System | | Tucker | | | Power Systems | | Griffiths | | | h2. DAQ | | *Task* | *Sub Task* | *Owner* | *Notes* | | DATE | | Karadzhov | | | Run Control Interface | | Hanlet | | | Digitisation boards (-> FPGA system) | | Karadzhov | | | h2. Online Computing Overall responsibility for computing rests with Rogers. | | *Task* | *Sub Task* | *Owner* | *Notes* | | Online Monitoring | | | | | Online Reconstruction | | | | | Data storage and movement | | Nebrensky | | | | UPS | | | | | RAID systems | | | | | Data mover | Nebrensky | | | Controls and Monitoring | | Hanlet | | | | Run Control | Hanlet | | | | Alarm handler | Hanlet | | | | Environment readout | Hanlet | | | | Webcams | | | | | DS | | | | | Target | | | | | Proton absorber | Hanlet | | | h2. Offline Computing Overall responsibility for computing rests with Rogers. | | *Task* | *Sub Task* | *Owner* | *Notes* | | Full reconstruction chain with all detectors | | Rajaram | | | Global fits | | Dobbs | | | Data quality checks | | | | | Automated grid batch processing | | Martinyak | | |