Project

General

Profile

Step4RunningRequirements » History » Version 29

Dobbs, Adam, 07 May 2014 13:56

1 2 Dobbs, Adam
h1. Step 4 Running Requirements
2 1 Dobbs, Adam
3 23 Dobbs, Adam
{{toc}} 
4
5 1 Dobbs, Adam
h2. Personnel
6
7 15 Dobbs, Adam
|
8 21 Dobbs, Adam
| *Task* | *Sub Task* | *Owner* | *Notes* |
9 24 Dobbs, Adam
| Pool of MOMs | | Boyd | |
10
| Pool of BLOCs | | Nebrensky | ~5 trained at present |
11
| Pool of SOCs | | Rajaram | |
12
| Pool of shifters | | Kyberd? | 24 at current count, 6 qualified as lead shifters, see [[Training_Shifters]] |
13
| Shift allocation scheme and recording system | | Blondel | |
14
| Detector experts | | Soler | |
15 15 Dobbs, Adam
|
16 1 Dobbs, Adam
17
h2. Beamline
18
19 19 Dobbs, Adam
Overall responsibility for beamline rests with Pasternak / Nebrensky.
20
21 16 Dobbs, Adam
|
22 21 Dobbs, Adam
| *Task* | *Sub Task* | *Owner* | *Notes* |
23 22 Dobbs, Adam
| Target ||  Hodgson |
24
| Decay Solenoid | | | |
25
| Proton Absorbers | | | |
26
| Conventional Magnets | | Hughes | |
27
| Beam Stop | | Govans | |
28 16 Dobbs, Adam
|
29 1 Dobbs, Adam
30 6 Gamet, Raymond
h2. Cooling Channel
31 1 Dobbs, Adam
32 18 Dobbs, Adam
|
33 21 Dobbs, Adam
| *Task* | *Sub Task* | *Owner* | *Notes* |
34
| Spectrometer Solenoids | | | |
35
| Hydrogen delivery system | | Watson | |
36
| FC1 | | Cobb | |
37
| LH2 Absorber | | | |
38
| LiH Absorber  | | | |
39
| Quench Protection and Monitoring | | | |
40 18 Dobbs, Adam
|
41 7 Gamet, Raymond
42
h2. Detectors
43 6 Gamet, Raymond
44 18 Dobbs, Adam
|
45 21 Dobbs, Adam
| *Task* | *Sub Task* | *Owner* | *Notes* |
46
| CKOVs | | Cremaldi | |
47
| TOFs | | Bonesini | |
48
| Tracker | | Adey / Dobbs / Uchida | Detailed plan in place, needs integrating with main MICE schedule, see http://micewww.pp.rl.ac.uk/documents/85 |
49
| KL | | Bogolimov | |
50
| EMR | | Blondel | |
51 18 Dobbs, Adam
|
52 1 Dobbs, Adam
53 6 Gamet, Raymond
h2. Hall and Infrastructure
54 1 Dobbs, Adam
55 25 Dobbs, Adam
|
56
| *Task* | *Sub Task* | *Owner* | *Notes* |
57
| Hall Services | | | |
58
| | Neutron Monitor | | |
59
| | Oxygen depletion alarm | | |
60
| | PPS | | |
61
| | Clean (what standard?) | | |
62
| | Surveys | | |
63 26 Dobbs, Adam
| PRY | | | |
64
| Cooler Compressors | | | |
65
| Vacuum System | | | |
66
| Power Systems | | | |
67 27 Dobbs, Adam
|
68 5 Dobbs, Adam
69
h2. DAQ
70 1 Dobbs, Adam
71 28 Dobbs, Adam
|
72
| *Task* | *Sub Task* | *Owner* | *Notes* |
73
| DATE | | | |
74
| Run Control Interface | | | |
75
| Digitisation boards (-> FPGA system) | | | |
76
|
77 1 Dobbs, Adam
78
h2. Online Computing
79
80 28 Dobbs, Adam
|
81
| *Task* | *Sub Task* | *Owner* | *Notes* |
82
| Online Monitoring | | | |
83
| Online Reconstruction | | | |
84
| Data storage and movement | | | |
85
| | UPS | | |
86
| | RAID systems | | |
87
| | Data mover | | |
88
| Controls and Monitoring | | | |
89
| | Run Control | | |
90
| | Alarm handler | | |
91
| | Environment readout | | |
92
| | Webcams | | |
93
| | DS | | |
94
| | Target | | |
95
| | Proton absorber | | |
96
|
97 1 Dobbs, Adam
98
h2. Offline Computing
99
100 29 Dobbs, Adam
|
101
| *Task* | *Sub Task* | *Owner* | *Notes* |
102
| Full reconstruction chain with all detectors | | | |
103
| Global fits | | | |
104
| Data quality checks | | | |
105
| Automated grid batch processing | | | |
106
|